Freehill Asphalt, Inc.: IDOT bid record

Freehill Asphalt, Inc. submitted 73 bids on Illinois DOT contracts in the data, from 15 JAN 2021 to 31 JUL 2026, and was the low bidder on 30 of them (41%). When it was not low, its total sat a median +16% above the low bid.

Owner
Illinois DOT
Low bid volume
$6,143,371
Latest bid
31 JUL 2026
Data through
18 SEP 2026
73Bids
30Low bids
41Win rate, percent
+16%Median gap to the low bid when not low, 43 bids

By year

YearBidsLow bidsWin rate
2021171376%
202211655%
202316425%
202413215%
20258113%
20268450%
Freehill Asphalt, Inc., IDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 01241458%
District 0313538%
District 0611436%
District 089444%
District 077114%
District 044250%
District 02300%
District 05100%
District 09100%
Freehill Asphalt, Inc., IDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Crack filling45100200LB5431 (57%)$1.29$2.32
Mod ureth PM line 478009004LF3123 (74%)$0.55$1.69
Changeable message SN70107025CAL DAY3023 (77%)$60.00$55.00
Crack routing (pavt)45100100LF5321 (40%)$0.10$0.05
Mod ureth PM line 678009006LF2820 (71%)$0.93$1.90
Temp info signingZ0030850SF2918 (62%)$20.00$18.00
Mod ureth PM line 2478009024LF2416 (67%)$5.00$8.00
JT or crack filling45200300LB1915 (79%)$0.76$3.67
Mod ureth PM line 1278009012LF2614 (54%)$2.45$4.50
Mod ureth PM line 878009008LF2214 (64%)$1.37$2.25
Mod ureth PM LTR-sym78009000SF2513 (52%)$5.00$7.00
Trainees TPGZ0076604HR66 (100%)$15.00$15.00
Freehill Asphalt, Inc., IDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
SKC Construction, Inc.4914 of 49
Complete Asphalt Service Co.4624 of 46
Denler, Inc.3419 of 34
Kinney Contractors, Inc.183 of 18
Antigua, Inc.40 of 4
Countryman, Inc.41 of 4
Diamond Coring Company, Inc.20 of 2
Quality Saw & Seal, Inc.10 of 1
Axtell's Inc.10 of 1
Mosley Construction 1, LLC10 of 1
Freehill Asphalt, Inc., IDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
31 JUL 202672372District 06Section D61 of 3$143,774Low, 60% under the second
31 JUL 202672J00District 06Section D61 of 3$92,224Low, 23% under the second
24 APR 202666T58District 03Section (17,18)CJS3 of 5$59,378+19%
24 APR 202674D56District 07Section (26-3,4)CJS2 of 3$351,738+6.0%
27 FEB 202666R39District 03Section D31 of 4$39,585Low, 8.0% under the second
27 FEB 202666R41District 03Section D31 of 4$57,066Low, 15% under the second
16 JAN 202672777District 06Section D64 of 4$176,496+19%
16 JAN 202678B84District 09Section D92 of 4$106,625+25%
13 JUN 202564T31District 02Section D23 of 4$313,355+23%
13 JUN 202564T32District 02Section D24 of 5$210,461+31%
13 JUN 202564T33District 02Section D22 of 4$265,323+36%
25 APR 202566P47District 03Section D32 of 4$66,720+6.0%
25 APR 202566P48District 03Section D33 of 4$317,857+64%
25 APR 202566R16District 03Section (3R)CJS3 of 5$31,031+33%
25 APR 202574C48District 07Section D73 of 4$426,948+11%
17 JAN 202572878District 06Section (75-6)CJS1 of 4$83,522Low, 18% under the second
14 JUN 202466P23District 03Section D33 of 4$203,554+9.0%
14 JUN 202466P24District 03Section D34 of 4$183,973+108%
14 JUN 202466P29District 03Section D31 of 2$83,979Low, 0.0% under the second
14 JUN 202474B43District 07Section D72 of 3$330,074+9.0%
26 APR 202470H06District 05Section 74-2&74(10-70)&(10-71,73)CJS2 of 2$85,483+28%
26 APR 202474B42District 07Section D72 of 3$53,486+31%
26 APR 202476L34District 08Section 95-(1,2)CJS-12 of 3$286,646+11%
26 APR 202476R39District 08Section 60-(13,14,15)CJS-12 of 3$215,716+8.0%
08 MAR 202462T26District 01Section FAP2 of 3$271,677+12%
Freehill Asphalt, Inc.: latest IDOT bids in the data

How this record was read

IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

  • Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way