Denler, Inc.: IDOT bid record

Denler, Inc. submitted 50 bids on Illinois DOT contracts in the data, from 15 JAN 2021 to 31 JUL 2026, and was the low bidder on 24 of them (48%). When it was not low, its total sat a median +21% above the low bid.

Owner
Illinois DOT
Low bid volume
$5,814,884
Latest bid
31 JUL 2026
Data through
18 SEP 2026
50Bids
24Low bids
48Win rate, percent
+21%Median gap to the low bid when not low, 25 bids

By year

YearBidsLow bidsWin rate
20219333%
20227229%
20238563%
20247343%
20259667%
202610550%
Denler, Inc., IDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 01251144%
District 0312650%
District 046467%
District 06300%
District 0233100%
District 07100%
Denler, Inc., IDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Crack routing (pavt)45100100LF3620 (56%)$0.05$0.05
Crack filling45100200LB3818 (47%)$2.15$2.32
Mod ureth PM line 478009004LF3315 (45%)$0.93$1.69
Mod ureth PM line 678009006LF3114 (45%)$1.40$1.90
Mod ureth PM LTR-sym78009000SF2611 (42%)$6.62$7.00
Mod ureth PM line 2478009024LF267 (27%)$6.69$8.00
Temp info signingZ0030850SF247 (29%)$35.00$18.00
Mod ureth PM line 878009008LF207 (35%)$1.78$2.25
Engr field office A67000400CAL MO77 (100%)$500.00$2,550.00
Mod ureth PM line 1278009012LF266 (23%)$3.67$4.50
Changeable message SN70107025CAL DAY116 (55%)$125.00$55.00
Raised refl pavt MKR78100100EACH76 (86%)$125.00$48.00
Denler, Inc., IDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
SKC Construction, Inc.4016 of 40
Freehill Asphalt, Inc.3415 of 34
Complete Asphalt Service Co.219 of 21
Antigua, Inc.50 of 5
Countryman, Inc.51 of 5
Mosley Construction 1, LLC31 of 3
RoadSafe Traffic Systems, Inc.20 of 2
Axtell's Inc.10 of 1
Kinney Contractors, Inc.11 of 1
Denler, Inc., IDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
31 JUL 202662V29District 01Section FAP1 of 2$334,302Low, 100% under the second
31 JUL 202662V46District 01Section FAP2 of 2$438,081+3.0%
31 JUL 202662V64District 01Section FAP1 of 2$85,435Low, 7.0% under the second
31 JUL 202662V79District 01Section FAP1 of 2$190,610Low, 4.0% under the second
31 JUL 202662V80District 01Section FAP1 of 2$51,792Low, 127% under the second
24 APR 202666T58District 03Section (17,18)CJS2 of 5$54,349+9.0%
24 APR 202668J47District 04Section D41 of 3$830,029Low, 18% under the second
27 FEB 202666R39District 03Section D33 of 4$43,182+9.0%
27 FEB 202666R41District 03Section D33 of 4$69,163+21%
27 FEB 202672A82District 06Section D62 of 3$164,822+8.0%
13 JUN 202564T31District 02Section D21 of 4$255,552Low, 21% under the second
13 JUN 202564T32District 02Section D21 of 5$160,257Low, 10% under the second
13 JUN 202564T33District 02Section D21 of 4$195,171Low, 36% under the second
25 APR 202566P47District 03Section D31 of 4$62,830Low, 6.0% under the second
25 APR 202566P48District 03Section D31 of 4$193,871Low, 25% under the second
25 APR 202566R16District 03Section (3R)CJS2 of 5$24,148+3.0%
25 APR 202574C48District 07Section D72 of 4$397,899+3.0%
07 MAR 202568J19District 04Section D41 of 4$858,085Low, 16% under the second
17 JAN 202572878District 06Section (75-6)CJS4 of 4$105,897+27%
14 JUN 202466P23District 03Section D31 of 4$185,981Low, 3.0% under the second
14 JUN 202466P24District 03Section D31 of 4$88,496Low, 65% under the second
08 MAR 202462T26District 01Section FAP3 of 3$317,176+31%
08 MAR 202462T66District 01Section FAP2 of 3$274,901+7.0%
08 MAR 202462T72District 01Section FAP1 of 3$139,670Low, 13% under the second
08 MAR 202462T79District 01Section FAP2 of 3$579,546+4.0%
Denler, Inc.: latest IDOT bids in the data

How this record was read

IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

  • Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy