RoadSafe Traffic Systems, Inc.: IDOT bid record

RoadSafe Traffic Systems, Inc. submitted 172 bids on Illinois DOT contracts in the data, from 15 JAN 2021 to 18 SEP 2026, and was the low bidder on 54 of them (31%). When it was not low, its total sat a median +43% above the low bid.

Owner
Illinois DOT
Low bid volume
$82,011,995
Latest bid
18 SEP 2026
Data through
18 SEP 2026
172Bids
54Low bids
31Win rate, percent
+43%Median gap to the low bid when not low, 107 bids

By year

YearBidsLow bidsWin rate
2021351234%
202222627%
2023271348%
202428932%
202523626%
202637822%
RoadSafe Traffic Systems, Inc., IDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 01381232%
District 03321031%
District 02301240%
District 0420735%
District 0714214%
District 0511436%
District 0610110%
District 089444%
District 096117%
District2150%
RoadSafe Traffic Systems, Inc., IDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Mod ureth PM line 478009004LF3522 (63%)$0.60$1.69
Mod ureth PM line 678009006LF4316 (37%)$1.00$1.90
Replacement reflector78100300EACH2610 (38%)$15.00$19.00
Pavmt MRKG rem WTR BL78300202SF1810 (56%)$1.05$2.10
Mod ureth PM line 878009008LF379 (24%)$1.72$2.25
PVT MKG rem grinding78300201SF199 (47%)$0.88$1.10
THPL PVT MK line 478000200LF198 (42%)$0.65$0.88
Epoxy PVT MK line 478005110LF98 (89%)$0.50$1.00
Mod ureth PM line 2478009024LF417 (17%)$7.50$8.00
GRV RCSD PVT MRKG 578011025LF187 (39%)$0.50$0.65
HS THPL PM LN 4X7800815LF177 (41%)$0.32$0.50
Mod ureth PM LTR-sym78009000SF396 (15%)$7.00$7.00
RoadSafe Traffic Systems, Inc., IDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

RoadSafe Traffic Systems, Inc., IDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
18 SEP 202646691District 07Section D73 of 4$959,700+17%
18 SEP 202666T15District 03Section (50-2)1 of 1$1,096,580Low
18 SEP 202670J35District 05Section D51 of 1$350,000Low
18 SEP 202674E40District 07Section D74 of 4$200,000+208%
18 SEP 202680D23District 01Section 2026-2150-TS,MS2 of 2$2,727,273+18%
18 SEP 202680D70District 01Section 2026-2195-I4 of 4$1,994,850+51%
18 SEP 202680F22District 01Section 2026-2261-GRR3 of 3$3,750,240+20%
31 JUL 202664V16District 02Section (K-2)CG5 of 5$500,000+988%
31 JUL 202666T30District 03Section (106)SFY2 of 2$1,075,580+166%
31 JUL 202666T35District 03Section (46-2)HL3 of 3$1,348,875+202%
31 JUL 202670J06District 05Section D52 of 2$1,900,000+44%
31 JUL 202674E44District 07Section D72 of 2$1,650,000+100%
31 JUL 202678C21District 09Section D92 of 2$2,175,000+49%
31 JUL 202680B42District 01Section 2025-2020-I3 of 4$1,867,531+35%
31 JUL 202680D50District 01Section 2026-2188-I2 of 2$3,775,000+56%
12 JUN 202646678District 04Section D41 of 4$3,083,382Low, 20% under the second
12 JUN 202646679District 04Section D43 of 3$1,974,663+27%
12 JUN 202664V31District 02Section D21 of 2$349,356Low, 37% under the second
24 APR 202646670District 08Section D84 of 4$488,559+141%
24 APR 202646671District 03Section D31 of 5$1,689,828Low, 11% under the second
24 APR 202646672District 02Section D22 of 4$3,399,484+19%
24 APR 202646675District 02Section D21 of 1$1,094,894Low
24 APR 202664U93District 02Section D22 of 2$1,446,650+49%
24 APR 202664V38District 02Section (1,1-1)SG1 of 2$333,333Low, 5.0% under the second
24 APR 202668J47District 04Section D42 of 3$979,977+18%
RoadSafe Traffic Systems, Inc.: latest IDOT bids in the data

How this record was read

IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

  • Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy