Mosley Construction 1, LLC: IDOT bid record

Mosley Construction 1, LLC submitted 62 bids on Illinois DOT contracts in the data, from 21 JAN 2022 to 31 JUL 2026, and was the low bidder on 16 of them (26%). When it was not low, its total sat a median +47% above the low bid.

Owner
Illinois DOT
Low bid volume
$8,943,646
Latest bid
31 JUL 2026
Data through
18 SEP 2026
62Bids
16Low bids
26Win rate, percent
+47%Median gap to the low bid when not low, 43 bids

By year

YearBidsLow bidsWin rate
20228225%
20232229%
202416425%
20258225%
20268675%
Mosley Construction 1, LLC, IDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 01241042%
District 031400%
District 076233%
District 05500%
District 094375%
District 08300%
District 042150%
District 06200%
District 02200%
Mosley Construction 1, LLC, IDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Tree remov over 1520100210UNIT166 (38%)$85.00$45.00
Welded wire reinf44200050SY76 (86%)$7.50$16.00
Tree remov 6-1520100110UNIT165 (31%)$80.00$35.00
Dowel bars 1 1/244201299EACH93 (33%)$30.00$25.00
Engrs FLD ofc TY A D1X6700407CAL MO63 (50%)$1,250.00$3,250.00
Tree remov acres20100500ACRE53 (60%)$12,000$20,150
Saw cuts44213200LF122 (17%)$8.10$5.00
Mod ureth PM line 478009004LF52 (40%)$2.00$1.69
Litter pickingX0326643MI101 (10%)$1,184.50$914.50
Changeable message SN70107025CAL DAY91 (11%)$150.00$55.00
Mod ureth PM line 678009006LF51 (20%)$3.00$1.90
Tie bars 3/444213204EACH51 (20%)$25.00$17.00
Mosley Construction 1, LLC, IDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Mosley Construction 1, LLC, IDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
31 JUL 202662V29District 01Section FAP2 of 2$669,331+100%
31 JUL 202662V46District 01Section FAP1 of 2$424,498Low, 3.0% under the second
31 JUL 202678B80District 09Section (101,102,103)TR-11 of 2$717,325Low, 12% under the second
12 JUN 202662V63District 01Section FAP2 of 2$414,178+124%
12 JUN 202662V77District 01Section FAP1 of 1$579,146Low
12 JUN 202662V78District 01Section FAP1 of 1$850,529Low
24 APR 202662X44District 01Section 2024-1009-BDS1 of 4$459,265Low, 34% under the second
16 JAN 202678B81District 09Section D91 of 2$984,650Low, 37% under the second
19 SEP 202562T23District 01Section 2025-1073-TR2 of 2$584,709+127%
01 AUG 202562X45District 01Section 2024-1008-BDS1 of 3$1,455,444Low, 40% under the second
01 AUG 202566R73District 03Section 2026-12 of 2$780,200+47%
13 JUN 202568K10District 04Section D43 of 3$616,646+25%
13 JUN 202574D40District 07Section D71 of 4$196,948Low, 9.0% under the second
25 APR 202564T79District 02Section (12R)PP2 of 2$453,034+46%
25 APR 202566R17District 03Section (36)PP2 of 3$407,923+33%
25 APR 202574D30District 07Section D74 of 5$396,700+36%
08 NOV 202462X14District 01Section 2024-989-ATR1 of 3$515,021Low, 45% under the second
20 SEP 202466P72District 03Section 2025-013 of 3$635,209+138%
02 AUG 202466P59District 03Section 2025-12 of 3$403,542+28%
02 AUG 202476U13District 08Section DIST2 of 2$270,300+62%
14 JUN 202462W74District 01Section 2024-955-PP1 of 2$528,136Low, 10% under the second
14 JUN 202472737District 06Section (84-9-3)I-12 of 3$460,624+22%
14 JUN 202478A50District 09Section D91 of 1$498,000Low
08 MAR 202462W54District 01Section 2023-936-MOW(EXP)1 of 3$538,526Low, 6.0% under the second
08 MAR 202491627District 05Rantoul, section 22-00116-00-SW3 of 5$185,559+5.0%
Mosley Construction 1, LLC: latest IDOT bids in the data

How this record was read

IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

  • Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy