IDOT letting results, March 7, 2025
163 contracts let by Illinois DOT on March 7, 2025, $587,145,545 in low bids, a median of 3 bidders per contract.
- Owner
- Illinois DOT
- Contracts
- 163
- Low bids, total
- $587,145,545
- Data through
- 18 SEP 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Source |
|---|---|---|---|---|---|---|---|---|
| 62N91 | Section 2018-100-BR | District 01 | 3 | Dunnet Bay Construction Company & K-Five Construction Corporation | $105,964,527 | $106,678,511 | +1.0% | IDOT |
| 76R99 | Section 82-(4,5,6,7)-1RS-2 | District 08 | 1 | The Kilian Corporation and Christ Brothers Asphalt , Inc. J.V. | $76,871,166 | IDOT | ||
| 70D55 | Section (57-18,9-1,57-5,57-19)RS | District 05 | 1 | Rowe Construction, a div of UCM, Inc. | $36,874,418 | IDOT | ||
| 76K02 | Section 82-5VB-R-2 | District 08 | 2 | Keeley & Sons, Inc. | $35,988,571 | $40,594,060 | +13% | IDOT |
| 61J84 | Geneva, section 05-00102-00-PV | District 01 | 5 | R. W. Dunteman Company | $30,162,688 | $30,784,938 | +2.0% | IDOT |
| 68E50 | Section 110RS-5;(111,112,108X-1)W,RS-3 | District 04 | 1 | Gunther Construction, a div of UCM, Inc. | $29,190,217 | IDOT | ||
| 64N01 | Section (195-3)RS | District 02 | 1 | Civil Constructors, Inc. d/b/a/ Helm Civil | $26,883,771 | IDOT | ||
| 62P43 | Section 2021-120-BR | District 01 | 7 | Lorig Construction Company | $13,975,161 | $14,316,349 | +2.0% | IDOT |
| 62W55 | Section 2023-SWP-006(AM) | District 01 | 1 | Central Sweeping of Illinois, LLC | $11,515,816 | IDOT | ||
| 66R34 | Section (38-2)RS-2 | District 03 | 1 | Iroquois Paving Corporation | $9,823,667 | IDOT | ||
| 61K89 | Orland Park, section 16-00078-00-CH | District 01 | 4 | D. Construction, Inc. | $9,722,683 | $10,841,220 | +12% | IDOT |
| 72321 | Section (3-1)RS-11 | District 06 | 1 | Illinois Valley Paving, a div of UCM, Inc. | $8,892,709 | IDOT | ||
| 64U33 | Section ((12,13,14)&105))PP&RS | District 02 | 2 | Civil Constructors Inc. dba Helm Civil and Valley Construction Co., J.V. | $7,840,008 | $9,777,744 | +25% | IDOT |
| 70F98 | Section 101RS-6 | District 05 | 1 | Evergreen Roadworks, LLC | $6,670,718 | IDOT | ||
| 72759 | Section (108Z)R,SW,TS | District 06 | 1 | Kinney Contractors, Inc. | $5,348,364 | IDOT | ||
| 68F90 | Section (120,121)RS-3 | District 04 | 1 | Advanced Asphalt Company | $5,166,321 | IDOT | ||
| 62R58 | Section FAU | District 01 | 4 | R. W. Dunteman Company | $4,792,444 | $4,993,000 | +4.0% | IDOT |
| 74C45 | Section (51-23,3-2,2-2,2Z)RS-2 | District 07 | 1 | Ambraw Asphalt Materials, Inc. | $4,591,977 | IDOT | ||
| 87876 | Peru, section 23-00073-00-BT | District 03 | 1 | D. Construction, Inc. | $4,565,811 | IDOT | ||
| 87875 | Sandwich, section 23-00049-00-PV | District 03 | 2 | Fischer Excavating, Inc. | $4,466,099 | $4,798,213 | +7.0% | IDOT |
| 97854 | Project Number: G47I-029 / /, section 22-00024-04-SP | District 08 | 1 | Charles E. Mahoney Co. | $4,379,708 | IDOT | ||
| 64R02 | Section D2 | District 02 | 1 | Martin & Company Excavating | $4,036,696 | IDOT | ||
| 76T85 | Section 82-(1,2,3,4)I-2 | District 08 | 2 | Christ Bros. Asphalt, Inc. | $3,895,613 | $4,020,593 | +3.0% | IDOT |
| 64U27 | Section (17R-1,40R-1)RS | District 02 | 1 | Rock Road Companies, Inc. | $3,578,388 | IDOT | ||
| 78A90 | Section D9 | District 09 | 2 | Samron Midwest Contracting, Inc. | $3,367,965 | $3,836,564 | +14% | IDOT |
| 91640 | Project Number:, section 23-00001-06-BT | District 05 | 1 | Rowe Construction, a div of UCM, Inc. | $3,355,065 | IDOT | ||
| 91644 | Project Number: Uin2-240 / /, section 22-00046-15-RS | District 05 | 2 | Rowe Construction, a div of UCM, Inc. | $3,188,964 | $3,600,079 | +13% | IDOT |
| 64U25 | Section (110,111)PP&RS | District 02 | 3 | Martin & Company Excavating | $3,123,589 | $3,227,219 | +3.0% | IDOT |
| 64U29 | Section 138PP&RS | District 02 | 2 | Advanced Asphalt Company | $2,998,150 | $3,287,624 | +10% | IDOT |
| 61L05 | Lake Forest, section 19-00093-00-SW | District 01 | 5 | D'Land Construction, LLC | $2,990,057 | $3,942,650 | +32% | IDOT |
| 62R73 | Section FAP | District 01 | 4 | Martam Construction Incorporated | $2,946,729 | $3,150,252 | +7.0% | IDOT |
| 66M57 | Section (128)RS-5 | District 03 | 4 | Curran Contracting Company | $2,734,986 | $2,890,298 | +6.0% | IDOT |
| 62X90 | Section 2024-SWP-008(VAR) | District 01 | 2 | Central Sweeping of Illinois, LLC | $2,728,800 | $3,490,000 | +28% | IDOT |
| 89818 | East Peoria, section 19-00171-00-RP | District 04 | 5 | Otto Baum Company, Inc. | $2,668,000 | $2,727,806 | +2.0% | IDOT |
| 72255 | Section (B,150)RS-3 | District 06 | 3 | P. H. Broughton & Sons, Inc. | $2,490,973 | $2,501,179 | 0.0% | IDOT |
| 62U91 | Section FAP | District 01 | 3 | Payne & Dolan, Inc. | $2,424,972 | $2,441,602 | +1.0% | IDOT |
| 76U29 | Section 95-(5,6)PP-3 | District 08 | 3 | E. T. Simonds Construction Company | $2,422,705 | $2,812,042 | +16% | IDOT |
| 72832 | Section 1(RS-6);3(RS-7,CLV,Y) | District 06 | 3 | Illinois Valley Paving, a div of UCM, Inc. | $2,260,205 | $2,262,507 | 0.0% | IDOT |
| 62W61 | Section 2023-940-N,TS | District 01 | 1 | H & H Electric Co. | $2,125,601 | IDOT | ||
| 72D99 | Section 21RS-8,23RS-7 | District 06 | 3 | Illinois Valley Paving, a div of UCM, Inc. | $2,068,376 | $2,101,109 | +2.0% | IDOT |
| 76U28 | Section 169RS-2 | District 08 | 2 | Christ Bros. Asphalt, Inc. | $1,985,692 | $2,061,230 | +4.0% | IDOT |
| 62X91 | Section 2024-SWP-009(VAR) | District 01 | 1 | Central Sweeping of Illinois, LLC | $1,982,600 | IDOT | ||
| 76T97 | Section DIST | District 08 | 2 | Kinney Contractors, Inc. | $1,950,920 | $2,098,173 | +8.0% | IDOT |
| 61L25 | Flossmoor, section 19-00051-00-CH | District 01 | 2 | D. Construction, Inc. | $1,920,303 | $1,969,722 | +3.0% | IDOT |
| 87877 | Project Number: Xls1-263 / /, section 23-00405-00-WR | District 03 | 2 | D. Construction, Inc. | $1,868,000 | $2,012,012 | +8.0% | IDOT |
| 87879 | Streator, section 24-00107-00-PV | District 03 | 2 | Advanced Asphalt Company | $1,674,922 | $1,978,703 | +18% | IDOT |
| 78A38 | Section (28-3,109,109-1,110)N-1 | District 09 | 2 | Samron Midwest Contracting, Inc. | $1,668,898 | $1,846,294 | +11% | IDOT |
| 68J17 | Section 118RS-4;119RS-5 | District 04 | 3 | A. C. Pavement Striping Co. | $1,625,964 | $1,927,078 | +19% | IDOT |
| 64U30 | Section (21,21R)RS | District 02 | 2 | Civil Constructors, Inc. d/b/a/ Helm Civil | $1,614,512 | $1,971,048 | +22% | IDOT |
| 74C96 | Section (1Z-1)BJR.BDR | District 07 | 2 | Sangamo Construction Company | $1,553,456 | $2,782,330 | +79% | IDOT |
| 66P49 | Section 126RS-4 | District 03 | 3 | Curran Contracting Company | $1,541,645 | $1,579,888 | +2.0% | IDOT |
| 87861 | Project Number: 7Qpm-510 / /, section 19-00383-00-WR | District 03 | 1 | Advanced Asphalt Company | $1,516,752 | IDOT | ||
| 66R29 | Section (13,14)RS-1 | District 03 | 1 | Advanced Asphalt Company | $1,461,525 | IDOT | ||
| 87878 | Project Number: Utvb-418 / /, section 23-00405-01-WR | District 03 | 1 | Advanced Asphalt Company | $1,448,524 | IDOT | ||
| 97793 | Glen Carbon, section 19-00025-01-PW | District 08 | 1 | Keller Construction, Inc. | $1,439,471 | IDOT | ||
| 62G55 | Section 2018-036-RS-SW | District 01 | 6 | Gallagher Asphalt Corporation | $1,427,655 | $1,456,611 | +2.0% | IDOT |
| 74D33 | Section D7 | District 07 | 3 | William Charles Construction Company, LLC | $1,412,000 | $1,960,660 | +39% | IDOT |
| 72736 | Section 75-4WS | District 06 | 1 | Illinois Valley Paving, a div of UCM, Inc. | $1,392,377 | IDOT | ||
| 62W60 | Section 2023-937-N,TS | District 01 | 2 | H & H Electric Co. | $1,375,723 | $2,228,535 | +62% | IDOT |
| 72831 | Section 114S(RS-4),116(RS-7,BDR) | District 06 | 1 | Charles E. Mahoney Co. | $1,368,306 | IDOT | ||
| 62R96 | Section FAP | District 01 | 3 | Peter Baker & Son Co. | $1,270,720 | $1,279,700 | +1.0% | IDOT |
| 74327 | Section (114)B-1 | District 07 | 2 | Samron Midwest Contracting, Inc. | $1,228,617 | $1,408,967 | +15% | IDOT |
| 62X21 | Section (263-1212.1-15D)BP | District 01 | 3 | ERA-Valdivia Contractors, Inc. | $1,181,744 | $1,373,300 | +16% | IDOT |
| 87850 | Project Number: 54W8-571 / /, section 22-00149-03-BR | District 03 | 2 | Iroquois Paving Corporation | $1,179,351 | $1,262,500 | +7.0% | IDOT |
| 70H53 | Section (52,53,54,55,57)PP | District 05 | 1 | Illinois Valley Paving, a div of UCM, Inc. | $1,171,692 | IDOT | ||
| 61L23 | Hoffman Estates, section 22-00112-00-RS | District 01 | 7 | A Lamp Concrete Contractors, Inc. | $1,163,964 | $1,168,968 | 0.0% | IDOT |
| 62T31 | Section FAP | District 01 | 5 | D. Construction, Inc. | $1,159,146 | $1,350,431 | +17% | IDOT |
| 85765 | Silvis, section 20-00052-00-BT | District 02 | 8 | Phoenix Corporation of the Quad Cities | $1,156,075 | $1,362,876 | +18% | IDOT |
| 97842 | Project Number: Byir-383 / /, section 22-00268-07-RS | District 08 | 2 | The Kilian Corporation | $1,155,943 | $1,214,120 | +5.0% | IDOT |
| 62T50 | Section FAU | District 01 | 7 | D. Construction, Inc. | $1,094,671 | $1,118,022 | +2.0% | IDOT |
| 76U17 | Section 82-(1,2)BDR | District 08 | 1 | Keeley & Sons, Inc. | $1,087,066 | IDOT | ||
| 89860 | Project Number: Y437-022 / /, section 23-00000-00-PP | District 04 | 2 | A. C. Pavement Striping Co. | $1,034,857 | $1,362,739 | +32% | IDOT |
| 46942 | Section REND | District 09 | 4 | Illini Asphalt Corporation | $1,020,559 | $1,080,320 | +6.0% | IDOT |
| 70H33 | Section (200)RS-4,(201)RS-2 | District 05 | 3 | A. C. Pavement Striping Co. | $997,903 | $1,039,749 | +4.0% | IDOT |
| 66R30 | Section (103A)RS | District 03 | 1 | Advanced Asphalt Company | $985,903 | IDOT | ||
| 70H45 | Section (57-8,57-22,57-23)BR-1 | District 05 | 1 | Stark Excavating, Inc. | $958,366 | IDOT | ||
| 97856 | Glen Carbon, section 23-00032-01-BT | District 08 | 2 | Baxmeyer Construction, Inc. | $954,648 | $1,000,000 | +5.0% | IDOT |
| 87852 | Project Number: 4J4M-719 / /, section 20-00821-00-BR | District 03 | 1 | D. Construction, Inc. | $946,209 | IDOT | ||
| 66R05 | Section CONTRAST | District 03 | 3 | A. C. Pavement Striping Co. | $936,906 | $1,013,651 | +8.0% | IDOT |
| 61L14 | East Hazel Crest, section 22-00026-00-RS | District 01 | 1 | D. Construction, Inc. | $927,996 | IDOT | ||
| 61L15 | Matteson, section 21-00067-00-RS | District 01 | 5 | P. T. Ferro Construction Co. | $899,917 | $908,140 | +1.0% | IDOT |
| 78844 | Section 3CR-1;4CR-1 | District 09 | 3 | Sierra Bravo Contractors, LLC | $897,358 | $909,688 | +1.0% | IDOT |
| 46946 | Section SAHARA | District 09 | 2 | Illini Asphalt Corporation | $883,314 | $1,070,126 | +21% | IDOT |
| 76T83 | Section 68R-1-(2,3,4)RS | District 08 | 2 | A. C. Pavement Striping Co. | $879,340 | $917,219 | +4.0% | IDOT |
| 72G18 | Section 42BR | District 06 | 3 | County Contractors, Inc. | $874,583 | $997,301 | +14% | IDOT |
| 68J19 | Section D4 | District 04 | 4 | Denler, Inc. | $858,085 | $996,662 | +16% | IDOT |
| 87853 | Project Number: Y66W-867 / /, section 21-00835-00-BR | District 03 | 2 | D. Construction, Inc. | $852,364 | $1,248,690 | +46% | IDOT |
| 61L12 | Matteson, section 23-00068-00-RS | District 01 | 5 | Gallagher Asphalt Corporation | $824,771 | $826,420 | 0.0% | IDOT |
| 62W63 | Section 2023-943-I | District 01 | 5 | A Lamp Concrete Contractors, Inc. | $794,968 | $798,811 | 0.0% | IDOT |
| 74D01 | Section D7 | District 07 | 5 | Eagle Painting & Maintenance Company, Inc. | $789,601 | $972,118 | +23% | IDOT |
| 87769 | Project Number: Uuke-060 / /, section 17-00234-00-BR | District 03 | 3 | Iroquois Paving Corporation | $785,132 | $790,880 | +1.0% | IDOT |
| 70H32 | Section (38)RS-3 | District 05 | 2 | Cross Construction, Inc. | $717,409 | $852,544 | +19% | IDOT |
| 95971 | Vandalia, section 22-00072-00-PV | District 07 | 7 | Baxmeyer Construction, Inc. | $693,518 | $816,800 | +18% | IDOT |
| 66P51 | Section (92)RS-4 | District 03 | 4 | D. Construction, Inc. | $680,856 | $811,495 | +19% | IDOT |
| 61L09 | Northlake, section 23-00101-00-TL | District 01 | 2 | Home Towne Electric, Inc. | $674,695 | $916,416 | +36% | IDOT |
| 78B01 | Section 101N-1 | District 09 | 3 | Samron Midwest Contracting, Inc. | $659,683 | $707,577 | +7.0% | IDOT |
| 68J86 | Section D4 | District 04 | 2 | Laser Electric, Inc. | $651,955 | $683,289 | +5.0% | IDOT |
| 66K70 | Section (135B-2)BRR | District 03 | 3 | Martin & Company Excavating | $650,504 | $689,981 | +6.0% | IDOT |
| 85775 | Project Number: G70K-280 / /, section 23-00356-00-RS | District 02 | 3 | Martin & Company Excavating | $640,103 | $661,977 | +3.0% | IDOT |
| 68J40 | Section [(105B)BR]BRR | District 04 | 1 | Brandt Construction Co. | $625,000 | IDOT | ||
| 66P13 | Section (5,6)PP | District 03 | 4 | G. M. Sipes Construction, Inc. | $622,863 | $775,854 | +25% | IDOT |
| 62T83 | Section FAP | District 01 | 3 | Peter Baker & Son Co. | $622,485 | $653,559 | +5.0% | IDOT |
| 61L27 | Lansing, section 24-00179-00-RS | District 01 | 2 | Gallagher Asphalt Corporation | $592,913 | $628,067 | +6.0% | IDOT |
| 62T48 | Section FAU | District 01 | 4 | D. Construction, Inc. | $589,859 | $689,995 | +17% | IDOT |
| 76U15 | Section 51 | District 08 | 2 | The Kilian Corporation | $564,097 | $589,377 | +4.0% | IDOT |
| 72602 | Section D6 | District 06 | 2 | Capitol Construction Group, LLC d/b/a Egizii Electric | $535,685 | $565,752 | +6.0% | IDOT |
| 85768 | Project Number: 9Um3-198 / /, section 20-00332-00-RS | District 02 | 2 | Martin & Company Excavating | $534,977 | $694,496 | +30% | IDOT |
| 62U89 | Section FAI | District 01 | 4 | Scanlon Excavating & Concrete, Inc. | $498,400 | $736,294 | +48% | IDOT |
| 62X77 | Section 2024-1035-I | District 01 | 4 | Thor General Contracting LLC | $477,405 | $498,948 | +5.0% | IDOT |
| 64S33 | Section (106 | District 02 | 3 | Civil Constructors, Inc. d/b/a/ Helm Civil | $447,987 | $522,053 | +17% | IDOT |
| 87866 | Project Number: 4Wak-615 / /, section 20-00272-00-SP | District 03 | 6 | Martin & Company Excavating | $442,950 | $460,171 | +4.0% | IDOT |
| 74A28 | Section 3BR | District 07 | 4 | C-Hill Civil Contractors, Inc. | $430,600 | $436,436 | +1.0% | IDOT |
| 87738 | Project Number: L3V3-662 / /, section 16-14122-00-BR | District 03 | 3 | Curnyn Construction Co. | $429,897 | $444,221 | +3.0% | IDOT |
| 72749 | Section (142BR,BR-1,BR-2,143BR)BRR | District 06 | 2 | Freesen, a div of UCM, Inc. | $425,495 | $509,319 | +20% | IDOT |
| 76T84 | Section 21RS-4 | District 08 | 2 | A. C. Pavement Striping Co. | $416,962 | $467,881 | +12% | IDOT |
| 61L20 | South Holland, section 22-00117-00-RS | District 01 | 2 | D. Construction, Inc. | $413,449 | $469,959 | +14% | IDOT |
| 61L02 | Homer Glen, section 20-00019-00-BT | District 01 | 6 | D. Construction, Inc. | $398,891 | $465,686 | +17% | IDOT |
| 61L13 | Romeoville, section 24-00078-00-RS | District 01 | 7 | P. T. Ferro Construction Co. | $392,397 | $433,704 | +11% | IDOT |
| 61L17 | Round Lake, section 22-00086-00-RS | District 01 | 3 | Peter Baker & Son Co. | $388,288 | $443,871 | +14% | IDOT |
| 74D03 | Section D7 | District 07 | 5 | Eagle Painting & Maintenance Company, Inc. | $387,334 | $411,500 | +6.0% | IDOT |
| 72608 | Section (19-1,2)BDR,BRR,BJR | District 06 | 3 | Freesen, a div of UCM, Inc. | $383,898 | $457,383 | +19% | IDOT |
| 78A91 | Section 12-1(SLP-2,SR-1,GR-1) | District 09 | 3 | Sierra Bravo Contractors, LLC | $359,872 | $369,757 | +3.0% | IDOT |
| 62X36 | Section 2024-1002-N | District 01 | 1 | Payne & Dolan, Inc. | $348,412 | IDOT | ||
| 68H31 | Section D4 | District 04 | 1 | All States Painting, Inc. | $348,300 | IDOT | ||
| 70H55 | Section (113)PP | District 05 | 7 | G. M. Sipes Construction, Inc. | $344,184 | $364,997 | +6.0% | IDOT |
| 61L01 | Hazel Crest, section 24-00096-00-RS | District 01 | 1 | D. Construction, Inc. | $341,757 | IDOT | ||
| 62X95 | Section 2024-1054-WSP | District 01 | 2 | Allen Chase Enterprises Inc. | $338,044 | $629,375 | +86% | IDOT |
| 64S87 | Section (7R-1)TS | District 02 | 2 | Davenport Electric Contract Company | $321,496 | $337,805 | +5.0% | IDOT |
| 91628 | Colfax, section 23-00018-00-BT | District 05 | 2 | Phoenix Corporation of the Quad Cities | $314,690 | $352,000 | +12% | IDOT |
| 62X76 | Section 2024-1036-I | District 01 | 4 | Thor General Contracting LLC | $305,910 | $325,512 | +6.0% | IDOT |
| 72603 | Section D6 | District 06 | 1 | Bodine Electric of Decatur | $292,133 | IDOT | ||
| 70G42 | Section CAP | District 05 | 2 | Big O Services, LLC | $289,172 | $344,708 | +19% | IDOT |
| 64T91 | Section (110BR-1)BP | District 02 | 6 | ERA-Valdivia Contractors, Inc. | $289,059 | $341,500 | +18% | IDOT |
| 72322 | Section D6 | District 06 | 1 | All States Painting, Inc. | $279,580 | IDOT | ||
| 66R06 | Section CONTRAST | District 03 | 5 | Varsity Striping & Construction Co. | $268,247 | $316,442 | +18% | IDOT |
| 64T82 | Section (33&40)1RS | District 02 | 4 | Brandt Construction Co. | $266,278 | $267,541 | 0.0% | IDOT |
| 64T20 | Section (40BR-3)BDR | District 02 | 3 | Martin & Company Excavating | $263,536 | $336,562 | +28% | IDOT |
| 66N42 | Section RIVER | District 03 | 2 | Interstate Maintenance, Incorporated | $262,302 | $324,602 | +24% | IDOT |
| 76T06 | Section 82-9HB-BP | District 08 | 6 | Eagle Painting & Maintenance Company, Inc. | $258,280 | $273,303 | +6.0% | IDOT |
| 61L16 | Lake Forest, section 23-00099-00-SW | District 01 | 6 | D'Land Construction, LLC | $246,136 | $268,695 | +9.0% | IDOT |
| 72652 | Section (1-2HB)BP | District 06 | 4 | Three Star Painting, Inc. | $240,000 | $248,718 | +4.0% | IDOT |
| 61L10 | Bloomingdale, section 23-00080-00-SW | District 01 | 5 | D'Land Construction, LLC | $225,598 | $231,564 | +3.0% | IDOT |
| 64T81 | Section (17R)PP | District 02 | 3 | Civil Constructors, Inc. d/b/a/ Helm Civil | $218,027 | $266,122 | +22% | IDOT |
| 72748 | Section (2BR)BDR | District 06 | 3 | Otto Baum Company, Inc. | $215,000 | $225,744 | +5.0% | IDOT |
| 72651 | Section (84-9-2HB-3)BP | District 06 | 5 | Three Star Painting, Inc. | $210,000 | $221,350 | +5.0% | IDOT |
| 70G76 | Section FY | District 05 | 2 | All States Painting, Inc. | $188,013 | $189,832 | +1.0% | IDOT |
| 66P95 | Section (FRONTAGE | District 03 | 3 | Kankakee Valley Construction Company, Inc. | $180,130 | $191,099 | +6.0% | IDOT |
| 74D05 | Section D7 | District 07 | 2 | All States Painting, Inc. | $179,337 | $185,105 | +3.0% | IDOT |
| 66P78 | Section 2025-2 | District 03 | 3 | The Daltons Inc. | $168,697 | $244,044 | +45% | IDOT |
| 62X79 | Section 2024-1034-I | District 01 | 3 | The Final Connection, Inc. | $164,400 | $169,500 | +3.0% | IDOT |
| 68J33 | Section D4 | District 04 | 3 | The Daltons Inc. | $157,527 | $216,211 | +37% | IDOT |
| 66P83 | Section (108BR)BP | District 03 | 4 | ERA-Valdivia Contractors, Inc. | $143,680 | $181,870 | +27% | IDOT |
| 72590 | Section D6 | District 06 | 1 | Capitol Construction Group, LLC d/b/a Egizii Electric | $141,700 | IDOT | ||
| 66P84 | Section (140BR-1)BP | District 03 | 4 | ERA-Valdivia Contractors, Inc. | $127,908 | $177,719 | +39% | IDOT |
| 64U11 | Section D2 | District 02 | 4 | Pressure Washing Unlimited Inc. | $94,625 | $94,850 | 0.0% | IDOT |
| 64U10 | Section D2 | District 02 | 4 | Pressure Washing Unlimited Inc. | $92,050 | $94,950 | +3.0% | IDOT |
| 66R09 | Section (12,13)G,SR | District 03 | 2 | H. J. Eppel & Co. | $88,186 | $103,164 | +17% | IDOT |
| 66N41 | Section (1BR)BC-2 | District 03 | 3 | All States Painting, Inc. | $74,028 | $79,330 | +7.0% | IDOT |
| 64U07 | Section D2 | District 02 | 4 | Pressure Washing Unlimited Inc. | $68,100 | $94,850 | +39% | IDOT |
| 64U09 | Section D2 | District 02 | 4 | Pressure Washing Unlimited Inc. | $58,850 | $61,975 | +5.0% | IDOT |
| 74D38 | Section D7 | District 07 | 3 | M & M Concrete, Inc. | $54,800 | $58,700 | +7.0% | IDOT |
| 70H52 | Section (74-2)CJS | District 05 | 2 | Complete Asphalt Service Co. | $32,351 | $55,368 | +71% | IDOT |
| 64U08 | Section D2 | District 02 | 4 | Pressure Washing Unlimited Inc. | $20,900 | $21,240 | +2.0% | IDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than IDOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.