IDOT contract 72832 bid tabulation
Section 1(RS-6);3(RS-7,CLV,Y). Let by Illinois DOT on March 7, 2025, Menard, District 06. 3 bids received; low bid $2,260,205 by Illinois Valley Paving, a div of UCM, Inc..
- Owner
- Illinois DOT
- Letting
- 07 MAR 2025
- Pay items
- 63
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Illinois Valley Paving, a div of UCM, Inc. | $2,260,205 | Low |
| 2 | Truman L. Flatt & Sons Co., Inc. | $2,262,507 | 0.0% |
| 3 | P. H. Broughton & Sons, Inc. | $2,519,748 | +11% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Illinois Valley Paving, a div of UCM, Inc. | 2. Truman L. Flatt & Sons Co., Inc. | 3. P. H. Broughton & Sons, Inc. |
|---|---|---|---|---|---|---|
| 1 | Exc & GR EX SHLD SPL (X2020060) | UNIT | 348 | $0.01 | $408.58 | $0.01 |
| 2 | Construction layout (Z0013798) | LS | 1 | $8,325.39 | $9,690.00 | $10,192 |
| 3 | Trainees (Z0076600) | HR | 2,000 | $0.80 | $0.80 | $0.80 |
| 4 | Trainees TPG (Z0076604) | HR | 2,000 | $15.00 | $15.00 | $15.00 |
| 5 | Tree remov over 15 (20100210) | UNIT | 24 | $104.48 | $125.00 | $429.12 |
| 6 | Earth excavation (20200100) | CY | 65 | $31.50 | $30.60 | $32.18 |
| 7 | Trench backfill (20800150) | CY | 65 | $99.75 | $96.90 | $101.92 |
| 8 | Seeding CL 2A (25000210) | ACRE | 0.25 | $4,725.00 | $4,590.00 | $4,827.64 |
| 9 | Nitrogen fert nutr (25000400) | LB | 23 | $3.68 | $3.57 | $3.75 |
| 10 | Phosphorus fert nutr (25000500) | LB | 23 | $3.68 | $3.57 | $3.75 |
| 11 | Potassium fert nutr (25000600) | LB | 23 | $3.68 | $3.57 | $3.75 |
| 12 | Agr ground limestone (25000700) | TON | 0.40 | $288.75 | $280.50 | $295.03 |
| 13 | Mulch method 2 (25100115) | ACRE | 0.25 | $4,725.00 | $4,590.00 | $4,827.64 |
| 14 | Temp eros contr seed (28000250) | LB | 25 | $6.30 | $6.12 | $6.44 |
| 15 | Temp ditch checks (28000305) | LF | 70 | $31.50 | $30.60 | $32.18 |
| 16 | Perimeter eros bar (28000400) | LF | 582 | $6.30 | $6.12 | $624.37 |
| 17 | Inlet & pipe protect (28000500) | EACH | 2 | $341.25 | $331.50 | $348.66 |
| 18 | Stone riprap CL A4 (28100107) | SY | 48 | $110.25 | $107.10 | $112.64 |
| 19 | Filter fabric (28200200) | SY | 48 | $5.25 | $5.10 | $5.36 |
| 20 | Preparation of base (35800100) | SY | 70 | $16.60 | $5.44 | $9.12 |
| 21 | Agg surf course TY B (40200800) | TON | 1 | $367.50 | $357.00 | $375.48 |
| 22 | Bit matls tack CT (40600290) | LB | 38,234 | $1.06 | $0.71 | $0.56 |
| 23 | Long joint sealant (40600370) | LF | 17,364 | $2.60 | $2.64 | $2.98 |
| 24 | Matl transfer device (40600405) | TON | 4,171 | $3.30 | $5.56 | $3.49 |
| 25 | HMA surf rem butt JT (40600982) | SY | 1,708 | $11.66 | $11.79 | $15.71 |
| 26 | Temporary ramp (40600990) | SY | 26 | $23.66 | $30.07 | $12.00 |
| 27 | HMA BC IL-9.5FG N50 (40602965) | TON | 3,476 | $122.14 | $114.86 | $112.77 |
| 28 | HMA SC IL-9.5 C N50 (40604050) | TON | 4,743 | $124.15 | $117.16 | $109.64 |
| 29 | Bit matls tack CT (40800029) | LB | 975 | $1.02 | $0.75 | $2.00 |
| 30 | Incidental HMA surf (40800050) | TON | 201 | $257.74 | $234.35 | $221.20 |
| 31 | HMA surf rem 1 1/2 (44000155) | SY | 56,470 | $2.92 | $2.96 | $2.77 |
| 32 | Pavt patch T4 14 (44200174) | SY | 145 | $235.49 | $357.00 | $375.48 |
| 33 | Agg wedge SHLD type B (48102100) | TON | 2,721 | $25.90 | $55.47 | $34.60 |
| 34 | HMA shoulders 6 1/2 (48203023) | SY | 3,670 | $49.29 | $41.96 | $68.12 |
| 35 | HMA shoulders 8 (48203029) | SY | 850 | $57.32 | $56.00 | $82.65 |
| 36 | HMA shoulders (48203100) | TON | 310 | $143.33 | $116.56 | $111.49 |
| 37 | P cul CL A 2 24 (542A1069) | LF | 75 | $201.94 | $582.13 | $206.32 |
| 38 | PRC flar end sec 24 (54213669) | EACH | 2 | $2,310.00 | $2,244.00 | $2,360.18 |
| 39 | SPBGR TY A 6FT posts (63000001) | LF | 1,175 | $31.19 | $30.29 | $31.86 |
| 40 | TR bar TRM T1 SPL tan (63100167) | EACH | 4 | $3,916.50 | $3,804.60 | $4,001.57 |
| 41 | Guardrail remov (63200310) | LF | 782 | $9.77 | $9.49 | $9.98 |
| 42 | Shoulder rum strip 8 (64200108) | LF | 9,990 | $0.48 | $0.71 | $1.15 |
| 43 | Engr field office A (67000400) | CAL MO | 12 | $3,408.61 | $2,456.72 | $3,081.44 |
| 44 | Mobilization (67100100) | LS | 1 | $158,304 | $27,122 | $55,100 |
| 45 | Traf cont-prot 701321 (70100405) | EACH | 1 | $15,960 | $7,742.01 | $16,307 |
| 46 | Traf cont-prot 701201 (70100450) | LS | 1 | $105.00 | $1,009.89 | $107.28 |
| 47 | Traf cont-prot 701306 (70100460) | LS | 1 | $31,626 | $9,662.75 | $10,728 |
| 48 | Traf cont-prot 701326 (70100500) | LS | 1 | $105.00 | $3,200.56 | $107.28 |
| 49 | TR cont & prot 701501 (70102620) | LS | 1 | $105.00 | $2,899.28 | $107.28 |
| 50 | Temp BR traf signals (70106500) | EACH | 1 | $15,750 | $15,300 | $16,092 |
| 51 | Changeable message SN (70107025) | CAL DAY | 24 | $120.75 | $96.93 | $80.46 |
| 52 | Short term pavt mking (70300100) | LF | 5,228 | $1.25 | $1.38 | $1.61 |
| 53 | SHRT TRM pavt MK rem (70300150) | SF | 1,743 | $0.01 | $3.18 | $1.66 |
| 54 | Temp conc barrier (70400100) | LF | 262.50 | $47.25 | $45.90 | $48.28 |
| 55 | Rel temp conc barrier (70400200) | LF | 262.50 | $12.60 | $12.24 | $12.87 |
| 56 | Imp attn temp NRN TL3 (70600251) | EACH | 2 | $5,880.00 | $5,712.00 | $6,007.72 |
| 57 | Imp attn rel NRN TL3 (70600352) | EACH | 2 | $1,837.50 | $1,785.00 | $1,877.42 |
| 58 | Terminal marker - DA (72501000) | EACH | 4 | $52.50 | $51.00 | $53.64 |
| 59 | Mod ureth PM line 5 (78009005) | LF | 43,708 | $0.95 | $0.73 | $0.97 |
| 60 | Raised refl pavt MKR (78100100) | EACH | 579 | $37.43 | $40.84 | $38.25 |
| 61 | Grdrail ref type A (78200005) | EACH | 24 | $10.50 | $10.20 | $10.73 |
| 62 | Raised ref PVT MK rem (78300200) | EACH | 579 | $9.72 | $18.40 | $9.46 |
| 63 | PVT MKG rem grinding (78300201) | SF | 1,525 | $3.76 | $2.04 | $3.84 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of March 7, 2025. Compiled by Mirage Metrics.