IDOT contract 74D38 bid tabulation
Section D7. Let by Illinois DOT on March 7, 2025, Wabash, District 07. 3 bids received; low bid $54,800 by M & M Concrete, Inc..
- Owner
- Illinois DOT
- Letting
- 07 MAR 2025
- Pay items
- 4
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | M & M Concrete, Inc. | $54,800 | Low |
| 2 | Interstate Maintenance, Incorporated | $58,700 | +7.0% |
| 3 | All States Painting, Inc. | $84,800 | +55% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. M & M Concrete, Inc. | 2. Interstate Maintenance, Incorporated | 3. All States Painting, Inc. |
|---|---|---|---|---|---|---|
| 1 | TC-prot 701201 SPL (X7010520) | LS | 1 | $4,500.00 | $500.00 | $4,000.00 |
| 2 | Bridge washing N1 (59200101) | EACH | 1 | $42,000 | $49,000 | $74,500 |
| 3 | Mobilization (67100100) | LS | 1 | $2,700.00 | $5,000.00 | $3,500.00 |
| 4 | Changeable message SN (70107025) | CAL DAY | 28 | $200.00 | $150.00 | $100.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of March 7, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.