M & M Concrete, Inc.: IDOT bid record

M & M Concrete, Inc. submitted 132 bids on Illinois DOT contracts in the data, from 15 JAN 2021 to 18 SEP 2026, and was the low bidder on 50 of them (38%). When it was not low, its total sat a median +16% above the low bid.

Owner
Illinois DOT
Low bid volume
$7,455,295
Latest bid
18 SEP 2026
Data through
18 SEP 2026
132Bids
50Low bids
38Win rate, percent
+16%Median gap to the low bid when not low, 79 bids

By year

YearBidsLow bidsWin rate
202122523%
202222627%
202317741%
2024231461%
2025271037%
202621838%
M & M Concrete, Inc., IDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 02732737%
District 0612325%
District 0812650%
District 039222%
District 048450%
District 077229%
District 056350%
District 093133%
District 0122100%
M & M Concrete, Inc., IDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
BR DK concrete sealerX5870015SF6341 (65%)$0.13$0.20
Bridge washing N259200102EACH5825 (43%)$14,900$12,300
Bridge washing N159200101EACH6324 (38%)$17,500$15,000
Traf cont-prot 70141170100420EACH5019 (38%)$275.00$750.00
Bridge washing N359200103EACH4715 (32%)$12,200$10,887
Bridge washing N759200107EACH3115 (48%)$7,800.00$8,500.00
Bridge washing N859200108EACH2914 (48%)$7,800.00$9,086.89
Bridge washing N459200104EACH4213 (31%)$12,100$10,000
Bridge washing N559200105EACH4113 (32%)$10,500$10,000
Bridge washing N659200106EACH3713 (35%)$9,100.00$9,125.00
Bridge washing N959200109EACH2210 (45%)$6,650.00$8,400.00
Bridge washing N1059200110EACH158 (53%)$6,900.00$8,300.00
M & M Concrete, Inc., IDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

M & M Concrete, Inc., IDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
18 SEP 202662Y03District 01Section 2024-1059-BDS1 of 2$262,641Low, 109% under the second
12 JUN 202666T11District 03Section (1B)BC-53 of 3$267,641+360%
12 JUN 202666T12District 03Section (111BR-1)BC-43 of 3$272,592+375%
12 JUN 202676U81District 08Section DIST1 of 2$560,000Low, 106% under the second
27 FEB 202664V11District 02Section D22 of 4$74,500+5.0%
27 FEB 202664V12District 02Section D22 of 4$20,500+9.0%
27 FEB 202664V13District 02Section D21 of 4$50,950Low, 16% under the second
27 FEB 202664V14District 02Section D22 of 4$84,9000.0%
27 FEB 202664V15District 02Section D24 of 4$149,650+60%
27 FEB 202670H66District 05Section FY1 of 2$149,515Low, 13% under the second
27 FEB 202674D47District 07Section D72 of 2$154,9200.0%
16 JAN 202664V02District 02Section D21 of 4$44,239Low, 23% under the second
16 JAN 202664V03District 02Section D21 of 4$79,732Low, 19% under the second
16 JAN 202664V04District 02Section D21 of 4$27,283Low, 42% under the second
16 JAN 202664V08District 02Section D24 of 4$68,650+65%
16 JAN 202664V09District 02Section D24 of 4$96,700+81%
16 JAN 202664V10District 02Section D24 of 4$94,050+42%
16 JAN 202666R77District 03Section D31 of 4$195,933Low, 24% under the second
16 JAN 202672047District 06Section D62 of 2$163,350+8.0%
16 JAN 202672K24District 06Section D62 of 2$329,675+7.0%
16 JAN 202676U46District 08Section DIST2 of 2$949,797+83%
07 NOV 202564V05District 022 of 3$145,000+5.0%
07 NOV 202564V06District 022 of 3$56,000+5.0%
07 NOV 202564V07District 021 of 3$112,000Low, 20% under the second
07 NOV 202576U47District 081 of 2$43,640Low, 3.0% under the second
M & M Concrete, Inc.: latest IDOT bids in the data

How this record was read

IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

  • Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy