IDOT contract 64V14 bid tabulation
Section D2. Let by Illinois DOT on February 27, 2026, Various, District 02. 4 bids received; low bid $84,725 by All States Painting, Inc..
- Owner
- Illinois DOT
- Letting
- 27 FEB 2026
- Pay items
- 22
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | All States Painting, Inc. | $84,725 | Low |
| 2 | M & M Concrete, Inc. | $84,900 | 0.0% |
| 3 | Pressure Washing Unlimited Inc. | $91,250 | +8.0% |
| 4 | Interstate Maintenance, Incorporated | $112,400 | +33% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. All States Painting, Inc. | 2. M & M Concrete, Inc. | 3. Pressure Washing Unlimited Inc. | 4. Interstate Maintenance, Incorporated |
|---|---|---|---|---|---|---|---|
| 1 | Bridge washing N1 (59200101) | EACH | 1 | $3,150.00 | $4,300.00 | $4,750.00 | $6,000.00 |
| 2 | Bridge washing N2 (59200102) | EACH | 1 | $3,150.00 | $4,300.00 | $4,600.00 | $6,000.00 |
| 3 | Bridge washing N3 (59200103) | EACH | 1 | $3,150.00 | $4,300.00 | $4,650.00 | $6,000.00 |
| 4 | Bridge washing N4 (59200104) | EACH | 1 | $3,150.00 | $4,300.00 | $4,500.00 | $6,000.00 |
| 5 | Bridge washing N5 (59200105) | EACH | 1 | $6,300.00 | $4,300.00 | $4,750.00 | $6,000.00 |
| 6 | Bridge washing N6 (59200106) | EACH | 1 | $6,300.00 | $4,300.00 | $4,600.00 | $6,000.00 |
| 7 | Bridge washing N7 (59200107) | EACH | 1 | $3,150.00 | $4,300.00 | $4,650.00 | $6,000.00 |
| 8 | Bridge washing N8 (59200108) | EACH | 1 | $6,300.00 | $4,300.00 | $4,500.00 | $6,000.00 |
| 9 | Bridge washing N9 (59200109) | EACH | 1 | $3,150.00 | $4,300.00 | $4,750.00 | $6,000.00 |
| 10 | Bridge washing N10 (59200110) | EACH | 1 | $6,300.00 | $4,300.00 | $4,600.00 | $6,000.00 |
| 11 | Bridge washing N11 (59200111) | EACH | 1 | $3,150.00 | $4,300.00 | $4,650.00 | $6,000.00 |
| 12 | Bridge washing N12 (59200112) | EACH | 1 | $3,150.00 | $4,300.00 | $4,500.00 | $6,000.00 |
| 13 | Bridge washing N13 (59200113) | EACH | 1 | $6,300.00 | $4,300.00 | $4,450.00 | $6,000.00 |
| 14 | Bridge washing N14 (59200114) | EACH | 1 | $6,300.00 | $4,300.00 | $4,600.00 | $6,000.00 |
| 15 | Bridge washing N15 (59200115) | EACH | 1 | $4,925.00 | $4,300.00 | $4,650.00 | $6,000.00 |
| 16 | Bridge washing N16 (59200116) | EACH | 1 | $4,925.00 | $4,300.00 | $4,500.00 | $6,000.00 |
| 17 | Bridge washing N17 (59200117) | EACH | 1 | $3,150.00 | $4,300.00 | $4,650.00 | $6,000.00 |
| 18 | Mobilization (67100100) | LS | 1 | $5,000.00 | $5,200.00 | $6,800.00 | $10,000 |
| 19 | Traf cont-prot 701421 (70100310) | LS | 1 | $500.00 | $500.00 | $5,200.00 | $100.00 |
| 20 | Traf cont-prot 701201 (70100450) | LS | 1 | $1,725.00 | $50.00 | $300.00 | $100.00 |
| 21 | Traf cont-prot 701406 (70100700) | LS | 1 | $1,000.00 | $6,000.00 | $300.00 | $100.00 |
| 22 | TR cont & prot 701501 (70102620) | LS | 1 | $500.00 | $50.00 | $300.00 | $100.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of February 27, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.