Pressure Washing Unlimited Inc.: IDOT bid record
Pressure Washing Unlimited Inc. submitted 22 bids on Illinois DOT contracts in the data, from 08 NOV 2024 to 27 FEB 2026, and was the low bidder on 10 of them (45%). When it was not low, its total sat a median +7.0% above the low bid.
- Owner
- Illinois DOT
- Low bid volume
- $613,979
- Latest bid
- 27 FEB 2026
- Data through
- 18 SEP 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2024 | 3 | 0 | 0% |
| 2025 | 8 | 7 | 88% |
| 2026 | 11 | 3 | 27% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Bridge washing N1 | 59200101 | EACH | 19 | 9 (47%) | $8,700.00 | $15,000 |
| Bridge washing N4 | 59200104 | EACH | 14 | 8 (57%) | $5,875.00 | $10,000 |
| Bridge washing N5 | 59200105 | EACH | 13 | 8 (62%) | $5,725.00 | $10,000 |
| Bridge washing N3 | 59200103 | EACH | 15 | 7 (47%) | $6,350.00 | $10,887 |
| Bridge washing N7 | 59200107 | EACH | 10 | 7 (70%) | $5,075.00 | $8,500.00 |
| Bridge washing N8 | 59200108 | EACH | 10 | 7 (70%) | $5,175.00 | $9,086.89 |
| Bridge washing N2 | 59200102 | EACH | 18 | 6 (33%) | $8,475.00 | $12,300 |
| Bridge washing N6 | 59200106 | EACH | 11 | 6 (55%) | $5,350.00 | $9,125.00 |
| Bridge washing N9 | 59200109 | EACH | 8 | 6 (75%) | $4,812.50 | $8,400.00 |
| Bridge washing N10 | 59200110 | EACH | 6 | 5 (83%) | $4,675.00 | $8,300.00 |
| Bridge washing N11 | 59200111 | EACH | 6 | 5 (83%) | $4,725.00 | $8,000.00 |
| Traf cont-prot 701411 | 70100420 | EACH | 8 | 3 (38%) | $200.00 | $750.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| M & M Concrete, Inc. | 22 | 9 of 22 |
| All States Painting, Inc. | 22 | 7 of 22 |
| Interstate Maintenance, Incorporated | 16 | 2 of 16 |
| Path Construction Company, Inc. | 3 | 3 of 3 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 27 FEB 2026 | 64V11 | District 02 | Section D2 | 1 of 4 | $70,874 | Low, 5.0% under the second |
| 27 FEB 2026 | 64V12 | District 02 | Section D2 | 4 of 4 | $30,000 | +59% |
| 27 FEB 2026 | 64V13 | District 02 | Section D2 | 2 of 4 | $59,238 | +16% |
| 27 FEB 2026 | 64V14 | District 02 | Section D2 | 3 of 4 | $91,250 | +8.0% |
| 27 FEB 2026 | 64V15 | District 02 | Section D2 | 2 of 4 | $94,725 | +1.0% |
| 16 JAN 2026 | 64V02 | District 02 | Section D2 | 4 of 4 | $550,841 | +1145% |
| 16 JAN 2026 | 64V03 | District 02 | Section D2 | 4 of 4 | $797,756 | +901% |
| 16 JAN 2026 | 64V04 | District 02 | Section D2 | 4 of 4 | $346,850 | +1171% |
| 16 JAN 2026 | 64V08 | District 02 | Section D2 | 1 of 4 | $41,570 | Low, 6.0% under the second |
| 16 JAN 2026 | 64V09 | District 02 | Section D2 | 1 of 4 | $53,315 | Low, 2.0% under the second |
| 16 JAN 2026 | 64V10 | District 02 | Section D2 | 2 of 4 | $66,948 | +1.0% |
| 07 MAR 2025 | 64U07 | District 02 | Section D2 | 1 of 4 | $68,100 | Low, 39% under the second |
| 07 MAR 2025 | 64U08 | District 02 | Section D2 | 1 of 4 | $20,900 | Low, 2.0% under the second |
| 07 MAR 2025 | 64U09 | District 02 | Section D2 | 1 of 4 | $58,850 | Low, 5.0% under the second |
| 07 MAR 2025 | 64U10 | District 02 | Section D2 | 1 of 4 | $92,050 | Low, 3.0% under the second |
| 07 MAR 2025 | 64U11 | District 02 | Section D2 | 1 of 4 | $94,625 | Low, 0.0% under the second |
| 17 JAN 2025 | 64T35 | District 02 | Section D2 | 2 of 4 | $69,150 | +1.0% |
| 17 JAN 2025 | 64T39 | District 02 | Section D2 | 1 of 4 | $59,230 | Low, 5.0% under the second |
| 17 JAN 2025 | 64T40 | District 02 | Section D2 | 1 of 4 | $54,465 | Low, 5.0% under the second |
| 08 NOV 2024 | 64T36 | District 02 | Section D2 | 2 of 3 | $123,065 | +7.0% |
| 08 NOV 2024 | 64T37 | District 02 | Section D2 | 2 of 3 | $147,625 | 0.0% |
| 08 NOV 2024 | 64T38 | District 02 | Section D2 | 2 of 3 | $62,900 | +9.0% |
How this record was read
IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
- Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.