IDOT contract 64U11 bid tabulation

Section D2. Let by Illinois DOT on March 7, 2025, Various, District 02. 4 bids received; low bid $94,625 by Pressure Washing Unlimited Inc..

Owner
Illinois DOT
Letting
07 MAR 2025
Pay items
17
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Pressure Washing Unlimited Inc.$94,625Low
2M & M Concrete, Inc.$94,8500.0%
3Interstate Maintenance, Incorporated$119,400+26%
4All States Painting, Inc.$133,274+41%
IDOT contract 64U11: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Pressure Washing Unlimited Inc.2. M & M Concrete, Inc.3. Interstate Maintenance, Incorporated4. All States Painting, Inc.
1Bridge washing N1 (59200101)EACH1$8,025.00$6,800.00$9,000.00$8,300.00
2Bridge washing N2 (59200102)EACH1$8,025.00$6,800.00$9,000.00$8,300.00
3Bridge washing N3 (59200103)EACH1$6,025.00$6,900.00$9,000.00$8,300.00
4Bridge washing N4 (59200104)EACH1$6,025.00$6,850.00$9,000.00$4,000.00
5Bridge washing N5 (59200105)EACH1$6,025.00$6,950.00$9,000.00$4,000.00
6Bridge washing N6 (59200106)EACH1$6,025.00$7,000.00$9,000.00$4,000.00
7Bridge washing N7 (59200107)EACH1$6,025.00$7,000.00$10,000$8,300.00
8Bridge washing N8 (59200108)EACH1$6,000.00$7,000.00$10,000$12,450
9Bridge washing N9 (59200109)EACH1$6,100.00$6,950.00$10,000$8,300.00
10Bridge washing N10 (59200110)EACH1$6,000.00$6,900.00$10,000$8,300.00
11Bridge washing N11 (59200111)EACH1$6,000.00$6,800.00$10,000$8,300.00
12Bridge washing N12 (59200112)EACH1$6,050.00$6,800.00$10,000$12,450
13Mobilization (67100100)LS1$6,000.00$5,500.00$5,000.00$11,000
14Traf cont-prot 701411 (70100420)EACH1$50.00$50.00$100.00$500.00
15Traf cont-prot 701201 (70100450)LS1$250.00$50.00$100.00$11,000
16Traf cont-prot 701406 (70100700)LS1$11,000$5,000.00$100.00$15,274
17TR cont & prot 701606 (70102625)LS1$1,000.00$1,500.00$100.00$500.00
IDOT contract 64U11: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of March 7, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy