Civil Constructors, Inc. d/b/a/ Helm Civil submitted 247 bids on Illinois DOT contracts in the data, from 15 JAN 2021 to 18 SEP 2026, and was the low bidder on 94 of them (38%). When it was not low, its total sat a median +14% above the low bid.

Owner
Illinois DOT
Low bid volume
$284,319,582
Latest bid
18 SEP 2026
Data through
18 SEP 2026
247Bids
94Low bids
38Win rate, percent
+14%Median gap to the low bid when not low, 153 bids

By year

YearBidsLow bidsWin rate
2021541935%
2022521937%
2023301550%
2024411844%
2025351131%
2026351234%
Civil Constructors, Inc. d/b/a/ Helm Civil, IDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 022048441%
District 0329517%
District 0413538%
District 01100%
Civil Constructors, Inc. d/b/a/ Helm Civil, IDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Changeable message SN70107025CAL DAY10277 (75%)$45.00$55.00
SHRT TRM pavt MK rem70300150SF9860 (61%)$1.40$1.20
Mod ureth PM line 478009004LF7053 (76%)$1.83$1.69
Terminal marker - DA72501000EACH6853 (78%)$35.00$47.85
Bit matls tack CT40600290LB11952 (44%)$0.65$0.01
Temp PVT MK L4 T4 tape70307120LF6251 (82%)$1.25$1.25
Rel temp conc barrier70400200LF8150 (62%)$8.00$8.00
Raised refl pavt MKR78100100EACH6647 (71%)$95.00$48.00
Trainees TPGZ0076604HR4646 (100%)$15.00$15.00
Imp attn temp NRD TL370600250EACH5645 (80%)$3,500.00$3,500.00
Perimeter eros bar28000400LF7544 (59%)$3.50$3.50
Guardrail remov63200310LF6144 (72%)$7.03$8.00
Civil Constructors, Inc. d/b/a/ Helm Civil, IDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Civil Constructors, Inc. d/b/a/ Helm Civil, IDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
18 SEP 202664T43District 02Section (37-(3-1,4,5,6))BRR2 of 4$9,250,034+6.0%
18 SEP 202664V52District 02Section 6RS1 of 3$2,930,601Low, 19% under the second
31 JUL 202664T48District 02Section (105BR-1)BRR2 of 3$558,681+7.0%
31 JUL 202664T49District 02Section (102BR)BRR2 of 3$532,329+20%
31 JUL 202664V16District 02Section (K-2)CG2 of 5$56,921+24%
31 JUL 202666P22District 03Section (ORCB)BRR-11 of 2$1,257,661Low, 53% under the second
12 JUN 202664N73District 02Section (20-1,1 of 1$7,439,990Low
12 JUN 202664S70District 02Section (101,2 of 2$4,547,696+19%
12 JUN 202664T07District 02Section (116BR)&(117BR-1)BDR2 of 2$749,7680.0%
12 JUN 202664T46District 02Section (115BR)BRR2 of 3$358,892+2.0%
12 JUN 202664T47District 02Section (102BR-1)BRR2 of 2$626,999+1.0%
12 JUN 202664T58District 02Section (109BR)BRR1 of 2$784,183Low, 19% under the second
12 JUN 202664V39District 02Section ((19X-1)RS-1)PP&RS1 of 1$2,734,393Low
12 JUN 202664V42District 02Section ((8Z&(32W&32WZ))RS&SW1 of 1$2,381,280Low
12 JUN 202666N45District 03Section (06-3HB)BR2 of 3$2,910,375+21%
24 APR 202664L51District 02Section 101RS-31 of 1$3,793,443Low
24 APR 202664T06District 02Section ((141-3HB)&(141-3VB)BDR2 of 2$4,373,796+38%
24 APR 202664T42District 02Section 177(-4HB(-1,-2,-3,-4)(2VB)BRR2 of 2$4,367,658+7.0%
24 APR 202664T73District 02Section 101RS2 of 2$2,124,405+7.0%
24 APR 202664U85District 02Section (8R)PP1 of 4$564,716Low, 0.0% under the second
24 APR 202664U89District 02Section (17R-1BR-1)BDR3 of 3$774,829+48%
24 APR 202664U90District 02Section (102BR-4)BJR2 of 3$1,968,941+18%
24 APR 202666R69District 03Section (22B)BRR4 of 4$612,739+45%
24 APR 202685793District 02Project Number: 8Pwj-710 / /, section 25-00358-00-RS3 of 3$1,907,713+28%
24 APR 202685797District 02Project Number: Ysis-006 / /, section 25-00365-00-BR3 of 3$802,244+38%
Civil Constructors, Inc. d/b/a/ Helm Civil: latest IDOT bids in the data

How this record was read

IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

  • Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy