IDOT contract 64V52 bid tabulation

Section 6RS. Let by Illinois DOT on September 18, 2026, Winnebago, District 02. 3 bids received; low bid $2,930,601 by Civil Constructors, Inc. d/b/a/ Helm Civil.

Owner
Illinois DOT
Letting
18 SEP 2026
Pay items
131
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Civil Constructors, Inc. d/b/a/ Helm Civil$2,930,601Low
2N-Trak Group LLC$3,487,909+19%
3Curran Contracting Company$3,743,691+28%
IDOT contract 64V52: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Civil Constructors, Inc. d/b/a/ Helm Civil2. N-Trak Group LLC3. Curran Contracting Company
1Constructn layout SPL (X0320050)LS1$68,000$40,000$40,000
2Washout basin (X0326806)LS1$2,000.00$500.00$750.00
3Conn EX DRG structure (X1200160)EACH1$5,900.00$2,000.00$10,324
4Geotechnical reinf (X2100104)SY7,520$2.30$3.29$7.50
5Maintenance mowing (X2503000)ACRE15$100.00$775.00$400.00
6Temp pavt removal (X4400110)SY1,549$21.00$15.00$32.00
7Rem C box cul end sec (X5010520)EACH1$1,200.00$4,900.00$16,000
8Box culvert removal (X5400005)LF63$61.00$200.00$800.00
9Travers pipe grate SP (X5429311)LF85$170.00$210.00$200.00
10Temp drainage connect (X6020184)EACH6$2,900.00$2,500.00$1,700.00
11Delineators SPL (X6350110)EACH5$150.00$157.50$150.00
12Engr FLD off A SPL (X6700410)CAL MO16$1,800.00$2,500.00$6,000.00
13Rem & rein sign panel (X7200075)SF9$75.00$68.25$175.00
14Main EX temp TS inst (X8900020)EACH1$1.00$1.05$1.50
15Rem EX temp TS equip (X8900030)EACH1$19,500$20,475$28,000
16Mod TMP TR sig instal (X8900040)EACH1$1,000.00$1,050.00$1,500.00
17Temp TR signal timing (X8900104)EACH3$1,350.00$1,417.50$1,900.00
18Stab constr entrance (Z0013797)SY30$120.00$35.00$50.00
19Drainage STR adj (Z0018400)EACH2$1,300.00$1,900.00$2,650.00
20Storm sew WM req 18 (Z0056612)LF17$320.00$325.00$900.00
21Temp pavement (Z0062456)SY1,809$71.00$70.00$75.00
22Trainees TPG (Z0076604)HR1,000$15.00$15.00$15.00
23Tree remov 6-15 (20100110)UNIT263$32.00$33.00$45.00
24Tree remov over 15 (20100210)UNIT36$39.00$40.00$55.00
25Tree remov acres (20100500)ACRE0.25$25,000$26,250$15,000
26Tree trunk protection (20101100)EACH6$150.00$210.00$150.00
27Earth excavation (20200100)CY10,484$28.00$40.00$35.00
28Rem & disp uns matl (20201200)CY2,592$34.00$43.00$45.00
29Trench backfill (20800150)CY1,075$0.01$32.00$96.00
30Topsoil exc & plac (21101505)CY1,380$31.00$40.00$40.00
31Seeding CL 2A (25000210)ACRE1.50$5,205.00$2,940.00$5,205.00
32Seeding CL 4 (25000310)ACRE0.50$2,743.00$6,300.00$2,743.00
33Seeding CL 4A (25000312)ACRE0.50$2,737.00$9,450.00$2,737.00
34Seeding CL 5 (25000320)ACRE0.50$5,683.00$8,925.00$5,683.00
35Nitrogen fert nutr (25000400)LB225$4.00$3.78$4.00
36Phosphorus fert nutr (25000500)LB225$4.00$3.78$4.00
37Potassium fert nutr (25000600)LB225$4.00$3.78$4.00
38Mowing (25000750)ACRE2.75$350.00$525.00$350.00
39Mulch method 3A (25100127)ACRE2.50$4,575.00$4,725.00$4,575.00
40Turf reinf mat (25100900)SY626$5.00$9.45$5.00
41Temp eros contr seed (28000250)LB260$5.00$3.68$5.00
42Temp ditch checks (28000305)LF110$6.10$10.50$6.10
43Perimeter eros bar (28000400)LF4,401$3.70$3.10$3.70
44Inlet & pipe protect (28000500)EACH3$110.00$367.50$110.00
45Inlet filters (28000510)EACH25$236.00$210.00$300.00
46Temp eros contr blank (28001100)SY12,088$1.40$1.10$1.40
47Stone riprap CL A3 (28100205)TON11.30$110.00$102.34$150.00
48Stone riprap CL A5 (28100209)TON57.20$65.00$103.75$185.00
49Filter fabric (28200200)SY1,107$1.70$3.10$2.50
50Agg subgrade impr 12 (30300112)SY3,562$16.00$38.00$22.00
51Agg subgrade impr 18 (30300118)SY2,845$27.00$42.00$33.00
52Agg subgrade impr 27 (30300127)SY2,020$37.00$56.00$44.00
53Sub gran mat B 6 (31101400)SY35$45.00$52.00$40.00
54Bit matls PR CT (40600275)LB15,458$1.05$1.05$1.05
55P bit matls tack CT (40600295)LB3,907$3.07$3.07$3.07
56Long joint sealant (40600370)LF3,272$8.49$9.00$8.49
57HMA SC IL-9.5 D N50 (40604060)TON191$147.36$155.00$147.36
58HMA pavt FD 6 (40701801)SY1,554$41.45$43.50$41.45
59HMA pavt FD 12 3/4 (40701936)SY4,468$84.71$89.00$84.71
60Pavement rem (44000100)SY4,542$12.00$23.00$16.00
61Comb curb gutter rem (44000500)LF113$8.00$14.00$20.00
62CL D patch T3 14 (44201819)SY100$270.00$285.00$300.00
63Aggregate SHLDS B (48101200)TON211$45.00$43.00$50.00
64HMA shoulders 6 (48203021)SY150$101.17$106.00$101.17
65Conc headwall removal (50104400)EACH3$520.00$575.00$5,162.07
66Pipe culvert remov (50105220)LF36$35.00$32.00$40.00
67Name plates (51500100)EACH2$1,600.00$1,100.00$3,650.00
68Box cul end sec C1 (54001001)EACH1$14,321$21,000$14,500
69PCBC 6X4 (54010604)LF51$1,100.00$1,250.00$2,700.00
70P cul CL A 2 15 (542A1060)LF64$180.00$225.00$178.00
71PRC flar end sec 15 (54213660)EACH1$1,700.00$2,000.00$1,750.00
72PRC flar end sec 18 (54213663)EACH1$1,800.00$2,100.00$1,850.00
73P cul CL A 4 12 temp (5424A012)LF270$140.00$209.00$126.00
74Storm sew CL A 2 15 (550A0360)LF279$110.00$225.00$136.00
75Storm sew CL A 2 18 (550A0380)LF805$180.00$200.00$176.00
76Storm sew CL A 3 18 (550A0680)LF113$210.00$225.00$163.00
77Storm sewer rem 18 (55100900)LF108$30.00$30.00$105.00
78Conc HDWL for P drain (60100060)EACH3$790.00$1,850.00$1,300.00
79Pipe underdrain 6 SP (60108200)LF25$100.00$125.00$127.00
80Pipe underdr T 2 4 (60108204)LF53$41.00$125.00$127.00
81Pipe underdr T 2 6 (60108206)LF1,758$26.00$55.00$70.00
82CB TA 4 dia T8G (60200805)EACH3$5,200.00$8,000.00$5,200.00
83CB TA 4 dia T24F&G (60201340)EACH12$6,400.00$8,000.00$6,590.00
84Inlets TB T8G (60240301)EACH3$4,700.00$5,000.00$3,500.00
85Inlets TB T24F&G (60240328)EACH1$4,500.00$5,000.00$3,850.00
86Class SI conc outlet (60600095)CY5.70$980.00$2,500.00$216.50
87Comb CC&G TY B-6.24 (60605000)LF1,691$56.00$60.00$68.45
88Fur erect row markers (66600105)EACH11$330.00$250.00$545.45
89Non SPL waste disposl (66900200)CY3,792$68.00$35.00$50.00
90Soil disposal analy (66900530)EACH1$1,250.00$1,312.50$1,250.00
91Reg sub P-const plan (66901001)LS1$3,200.00$3,360.00$3,200.00
92Reg sub F con report (66901003)LS1$1,800.00$1,890.00$1,800.00
93Reg sub mon (66901006)CAL DAY20$920.00$966.00$920.00
94Mobilization (67100100)LS1$175,836$200,000$250,000
95Traf cont-prot 701331 (70100200)EACH2$100.00$25,000$20,000
96Traf cont-prot 701201 (70100450)LS1$1.00$525.00$500.00
97Traf cont-prot 701206 (70100455)LS1$1.00$525.00$500.00
98Traf cont-prot 701306 (70100460)LS1$1.00$1.00$1.00
99Traf cont-prot 701326 (70100500)LS1$1.00$1.00$1.00
100TR cont & prot 701501 (70102620)LS1$25,000$1.00$95,000
101Changeable message SN (70107025)CAL DAY70$40.00$31.50$30.00
102Temp PVT MK LTR & sym paint (70300211)SF177$2.00$1.34$1.28
103Temp PVT MK line 4 - paint (70300221)LF21,185$0.35$0.44$0.42
104Temp PVT MK line 8 - paint (70300251)LF348$0.80$0.97$0.92
105Temp PVT MK line 24 - paint (70300281)LF99$2.40$1.60$1.52
106Temp PVT MK LTR & sym MU (70303100)SF42$9.00$7.35$7.00
107Temp PVT MK L4 MU (70303120)LF5,801$1.65$2.52$2.40
108Temp PVT MK L8 MU (70303140)LF21$3.00$3.26$3.10
109Temp PVT MK L24 MU (70303210)LF33$9.00$6.83$6.50
110Temp conc barrier (70400100)LF537.50$40.00$35.00$33.00
111Pin temp conc barrier (70400125)EACH201$15.00$19.00$18.00
112Rel temp conc barrier (70400200)LF450$12.00$6.50$6.00
113Imp attn temp NRN TL3 (70600251)EACH2$3,500.00$3,150.00$3,000.00
114Imp attn rel NRN TL3 (70600352)EACH2$750.00$1,050.00$1,000.00
115Sign panel T1 (72000100)SF113$28.00$26.00$25.00
116Remov sign panel T1 (72400310)SF24$40.00$26.00$25.00
117Teles STL sin support (72800100)LF142$22.00$26.00$25.00
118Wood sin support (73000100)LF81$65.00$31.50$30.00
119Pref PL PM TD STD L 6 (78004630)LF42$11.00$7.35$6.50
120Pref PL PM TD STD L 8 (78004640)LF535$12.00$8.93$8.65
121Pref PL PM TD STD L12 (78004660)LF276$17.00$14.70$13.00
122Mod ureth PM LTR-sym (78009000)SF132$6.20$6.30$8.00
123Mod ureth PM line 4 (78009004)LF8,874$0.93$1.00$0.98
124Mod ureth PM line 8 (78009008)LF785$1.60$2.10$2.65
125Mod ureth PM line 12 (78009012)LF35$4.00$3.15$4.00
126Mod ureth PM line 24 (78009024)LF81$6.20$6.30$8.00
127GRV RCSD PVT MRKG 7 (78011035)LF42$1.80$0.84$1.00
128GRV RCSD PVT MRKG 9 (78011045)LF535$2.40$1.26$2.00
129GRV RCSD PVT MRKG 13 (78011065)LF276$2.90$12.60$3.50
130GRV RCSD PVT MRKG 25 (78011125)LF81$6.00$25.20$7.00
131PVT MKG rem WTR blast (78300202)SF7,519$1.40$2.10$2.00
IDOT contract 64V52: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of September 18, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy