N-Trak Group LLC: IDOT bid record

N-Trak Group LLC submitted 13 bids on Illinois DOT contracts in the data, from 15 JAN 2021 to 18 SEP 2026, and was the low bidder on 6 of them (46%). When it was not low, its total sat a median +16% above the low bid.

Owner
Illinois DOT
Low bid volume
$10,698,719
Latest bid
18 SEP 2026
Data through
18 SEP 2026
13Bids
6Low bids
46Win rate, percent
+16%Median gap to the low bid when not low, 7 bids

By year

YearBidsLow bidsWin rate
2021400%
20222150%
202322100%
202411100%
2025100%
20263267%
N-Trak Group LLC, IDOT: bids and low bids by year of letting

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Bit matls PR CT40600275LB98 (89%)$0.01$0.01
Bit matls tack CT40600290LB76 (86%)$0.01$0.01
Erosion contr blanket25100630SY95 (56%)$1.30$1.85
Nitrogen fert nutr25000400LB75 (71%)$3.25$3.00
Potassium fert nutr25000600LB75 (71%)$3.25$3.00
Phosphorus fert nutr25000500LB75 (71%)$3.25$3.00
Inlet & pipe protect28000500EACH94 (44%)$150.00$200.00
THPL PVT MK line 1278000600LF74 (57%)$4.00$3.10
Perimeter eros bar28000400LF74 (57%)$3.00$3.50
Temp eros contr seed28000250LB74 (57%)$3.00$5.00
Temp ditch checks28000305LF93 (33%)$10.75$12.50
Detectable warnings42400800SF83 (38%)$30.00$37.00
N-Trak Group LLC, IDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

N-Trak Group LLC, IDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
18 SEP 202664V52District 02Section 6RS2 of 3$3,487,909+19%
12 JUN 202685791District 02Rockton, section 22-00044-00-BT1 of 4$659,834Low, 6.0% under the second
27 FEB 202685769District 02Loves Park, section 21-00078-01-SW1 of 6$3,986,156Low, 3.0% under the second
19 SEP 202564P02District 02Section D22 of 5$1,463,046+15%
19 JAN 202464S57District 02Section D21 of 5$195,045Low, 4.0% under the second
17 NOV 202385727District 02Rockford, section 20-00635-00-SW1 of 6$489,794Low, 15% under the second
16 JUN 202385741District 02Project Number: Ekfu-347 / /, section 21-00633-01-BT1 of 3$920,853Low, 3.0% under the second
18 NOV 202246934District 02Section ROCK1 of 4$4,447,038Low, 6.0% under the second
17 JUN 202285726District 02Project Number: Xm3N-979 / /, section 21-00115-00-BT2 of 2$797,149+38%
05 NOV 202146930District 02Section ROCK2 of 7$2,108,348+14%
11 JUN 202185706District 02Project Number: U1Q2-357 / /, section 16-00633-00-BT3 of 5$1,226,149+15%
11 JUN 202185708District 02South Beloit, section 13-00040-01-BT3 of 5$438,416+16%
15 JAN 202164N02District 02Section 29SLP6 of 7$558,890+40%
N-Trak Group LLC: latest IDOT bids in the data

How this record was read

IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

  • Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy