Fischer Excavating, Inc.: IDOT bid record

Fischer Excavating, Inc. submitted 40 bids on Illinois DOT contracts in the data, from 15 JAN 2021 to 12 JUN 2026, and was the low bidder on 10 of them (25%). When it was not low, its total sat a median +21% above the low bid.

Owner
Illinois DOT
Low bid volume
$16,835,914
Latest bid
12 JUN 2026
Data through
18 SEP 2026
40Bids
10Low bids
25Win rate, percent
+21%Median gap to the low bid when not low, 30 bids

By year

YearBidsLow bidsWin rate
202111327%
2022400%
20233267%
202410220%
20257229%
20265120%
Fischer Excavating, Inc., IDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 0231826%
District 036117%
District 043133%
Fischer Excavating, Inc., IDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Perimeter eros bar28000400LF2720 (74%)$3.00$3.50
Trainees TPGZ0076604HR1414 (100%)$15.00$15.00
Erosion contr blanket25100630SY2813 (46%)$1.75$1.85
Temp eros contr seed28000250LB2513 (52%)$3.00$5.00
Bit matls tack CT40600290LB2313 (57%)$0.62$0.01
Comb curb gutter rem44000500LF2013 (65%)$7.00$11.61
Sign panel T172000100SF2013 (65%)$28.00$31.00
Nitrogen fert nutr25000400LB2012 (60%)$2.50$3.00
Potassium fert nutr25000600LB2012 (60%)$2.50$3.00
Phosphorus fert nutr25000500LB2012 (60%)$2.50$3.00
TraineesZ0076600HR1212 (100%)$0.80$0.80
Temp ditch checks28000305LF2311 (48%)$10.00$12.50
Fischer Excavating, Inc., IDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Fischer Excavating, Inc., IDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
12 JUN 202664L94District 02Section 104R4 of 4$17,403,866+23%
12 JUN 202685791District 02Rockton, section 22-00044-00-BT2 of 4$698,189+6.0%
27 FEB 202664U56District 02Section D23 of 4$99,250+69%
16 JAN 202664L71District 02Section 136CR4 of 6$1,099,098+35%
16 JAN 202685787District 02Belvidere, section 23-00118-00-LS1 of 7$1,380,432Low, 3.0% under the second
01 AUG 202564U79District 02Section (22,107)A1 of 3$652,317Low, 17% under the second
13 JUN 202564M76District 02Section 75CR4 of 6$665,719+35%
25 APR 202564N76District 02Section (2,3)R4 of 4$3,257,263+20%
25 APR 202589868District 04Aledo, section 23-00049-00-BT8 of 8$1,440,690+57%
07 MAR 202585765District 02Silvis, section 20-00052-00-BT7 of 8$1,717,659+49%
07 MAR 202587866District 03Project Number: 4Wak-615 / /, section 20-00272-00-SP5 of 6$613,914+39%
07 MAR 202587875District 03Sandwich, section 23-00049-00-PV1 of 2$4,466,099Low, 7.0% under the second
08 NOV 202485743District 02Sterling, section 17-00152-00-BT4 of 4$7,085,829+14%
02 AUG 202485761District 02Project Number: 0Mne-308 / /, section 20-00102-00-PV2 of 3$6,883,481+12%
14 JUN 202464R35District 02Section 25SLP1 of 5$286,287Low, 33% under the second
14 JUN 202487749District 03City Of Dekalb, section 19-00196-00-BT2 of 3$542,886+9.0%
14 JUN 202487832District 03City Of Dekalb, section 22-00200-00-PV2 of 3$2,259,079+24%
14 JUN 202487838District 03Peru, section 22-00070-01-PV2 of 2$3,676,293+28%
19 JAN 202464P11District 02Section (103,104)RS-13 of 3$3,541,205+4.0%
19 JAN 202464R71District 02Section (5)RS4 of 5$52,991,818+20%
19 JAN 202464S57District 02Section D24 of 5$272,224+40%
19 JAN 202489828District 04Aledo, section 22-00044-00-BT1 of 6$483,905Low, 9.0% under the second
04 AUG 202364K08District 02Section 15R-11 of 6$5,087,535Low, 2.0% under the second
16 JUN 202364S16District 02Section 106DM1 of 1$57,911Low
16 JUN 202385741District 02Project Number: Ekfu-347 / /, section 21-00633-01-BT2 of 3$948,657+3.0%
Fischer Excavating, Inc.: latest IDOT bids in the data

How this record was read

IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

  • Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy