IDOT contract 64U56 bid tabulation

Section D2. Let by Illinois DOT on February 27, 2026, Jo Daviess, District 02. 4 bids received; low bid $58,728 by Louie's Trenching Service, Inc..

Owner
Illinois DOT
Letting
27 FEB 2026
Pay items
17
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Louie's Trenching Service, Inc.$58,728Low
2Law Excavating, Inc.$84,355+44%
3Fischer Excavating, Inc.$99,250+69%
4Phoenix Corporation of the Quad Cities$138,537+136%
IDOT contract 64U56: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Louie's Trenching Service, Inc.2. Law Excavating, Inc.3. Fischer Excavating, Inc.4. Phoenix Corporation of the Quad Cities
1BLDG remov no 1 (Z0007601)LS1$8,762.50$16,000$20,000$38,750
2BLDG remov no 2 (Z0007602)LS1$3,055.00$4,000.00$11,000$2,700.00
3BLDG remov no 3 (Z0007603)LS1$11,368$24,000$25,000$54,000
4BLDG remov no 4 (Z0007604)LS1$1,675.00$4,000.00$6,000.00$2,000.00
5BLDG remov no 5 (Z0007605)LS1$500.00$1,500.00$1,500.00$1,100.00
6Conc step remov (Z0012455)EACH1$800.00$500.00$1,200.00$500.00
7RR prot liability ins (Z0048665)LS1$2,700.00$6,000.00$3,000.00$6,375.00
8R&D non-FR asb BLD 1 (Z0049901)LS1$1,000.00$1,000.00$1,500.00$3,500.00
9R&D non-FR asb BLD 3 (Z0049903)LS1$1,000.00$1,000.00$1,500.00$3,500.00
10Topsoil F & P var DP (21101600)SY260$11.50$8.00$17.00$9.00
11Topsoil F & P 12 (21101645)SY378$20.75$12.00$29.00$28.00
12Erosion contr blanket (25100630)SY638$7.00$7.00$3.50$3.50
13Drive pavement rem (44000200)SY140$33.75$4.00$7.00$14.00
14Sidewalk rem (44000600)SF1,085$3.75$2.50$3.00$2.00
15Mobilization (67100100)LS1$3,000.00$10,000$6,000.00$6,125.00
16TR cont & prot 701501 (70102620)LS1$650.00$1,000.00$600.00$600.00
17TR cont & prot 701801 (70102640)LS1$125.00$1,000.00$100.00$100.00
IDOT contract 64U56: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of February 27, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy