IDOT contract 64U56 bid tabulation
Section D2. Let by Illinois DOT on February 27, 2026, Jo Daviess, District 02. 4 bids received; low bid $58,728 by Louie's Trenching Service, Inc..
- Owner
- Illinois DOT
- Letting
- 27 FEB 2026
- Pay items
- 17
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Louie's Trenching Service, Inc. | $58,728 | Low |
| 2 | Law Excavating, Inc. | $84,355 | +44% |
| 3 | Fischer Excavating, Inc. | $99,250 | +69% |
| 4 | Phoenix Corporation of the Quad Cities | $138,537 | +136% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Louie's Trenching Service, Inc. | 2. Law Excavating, Inc. | 3. Fischer Excavating, Inc. | 4. Phoenix Corporation of the Quad Cities |
|---|---|---|---|---|---|---|---|
| 1 | BLDG remov no 1 (Z0007601) | LS | 1 | $8,762.50 | $16,000 | $20,000 | $38,750 |
| 2 | BLDG remov no 2 (Z0007602) | LS | 1 | $3,055.00 | $4,000.00 | $11,000 | $2,700.00 |
| 3 | BLDG remov no 3 (Z0007603) | LS | 1 | $11,368 | $24,000 | $25,000 | $54,000 |
| 4 | BLDG remov no 4 (Z0007604) | LS | 1 | $1,675.00 | $4,000.00 | $6,000.00 | $2,000.00 |
| 5 | BLDG remov no 5 (Z0007605) | LS | 1 | $500.00 | $1,500.00 | $1,500.00 | $1,100.00 |
| 6 | Conc step remov (Z0012455) | EACH | 1 | $800.00 | $500.00 | $1,200.00 | $500.00 |
| 7 | RR prot liability ins (Z0048665) | LS | 1 | $2,700.00 | $6,000.00 | $3,000.00 | $6,375.00 |
| 8 | R&D non-FR asb BLD 1 (Z0049901) | LS | 1 | $1,000.00 | $1,000.00 | $1,500.00 | $3,500.00 |
| 9 | R&D non-FR asb BLD 3 (Z0049903) | LS | 1 | $1,000.00 | $1,000.00 | $1,500.00 | $3,500.00 |
| 10 | Topsoil F & P var DP (21101600) | SY | 260 | $11.50 | $8.00 | $17.00 | $9.00 |
| 11 | Topsoil F & P 12 (21101645) | SY | 378 | $20.75 | $12.00 | $29.00 | $28.00 |
| 12 | Erosion contr blanket (25100630) | SY | 638 | $7.00 | $7.00 | $3.50 | $3.50 |
| 13 | Drive pavement rem (44000200) | SY | 140 | $33.75 | $4.00 | $7.00 | $14.00 |
| 14 | Sidewalk rem (44000600) | SF | 1,085 | $3.75 | $2.50 | $3.00 | $2.00 |
| 15 | Mobilization (67100100) | LS | 1 | $3,000.00 | $10,000 | $6,000.00 | $6,125.00 |
| 16 | TR cont & prot 701501 (70102620) | LS | 1 | $650.00 | $1,000.00 | $600.00 | $600.00 |
| 17 | TR cont & prot 701801 (70102640) | LS | 1 | $125.00 | $1,000.00 | $100.00 | $100.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of February 27, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.