IDOT contract 64M76 bid tabulation
Section 75CR. Let by Illinois DOT on June 13, 2025, Lee, District 02. 6 bids received; low bid $493,527 by Martin & Company Excavating.
- Owner
- Illinois DOT
- Letting
- 13 JUN 2025
- Pay items
- 72
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Martin & Company Excavating | $493,527 | Low |
| 2 | Gillan Construction LLC | $531,098 | +8.0% |
| 3 | Phoenix Corporation of the Quad Cities | $589,206 | +19% |
| 4 | Fischer Excavating, Inc. | $665,719 | +35% |
| 5 | Gensini Excavating, Inc. | $698,125 | +41% |
| 6 | McCarthy Improvement Company | $843,902 | +71% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Martin & Company Excavating | 2. Gillan Construction LLC | 3. Phoenix Corporation of the Quad Cities | 4. Fischer Excavating, Inc. | 5. Gensini Excavating, Inc. | 6. McCarthy Improvement Company |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Stone riprap CL A5 SP (X2810110) | SY | 100 | $105.00 | $84.00 | $159.00 | $185.00 | $158.77 | $241.00 |
| 2 | Temp pavt removal (X4400110) | SY | 434 | $9.00 | $15.00 | $17.50 | $13.00 | $18.06 | $37.00 |
| 3 | Storm sewer removal (X5510100) | LF | 150 | $9.00 | $15.00 | $31.00 | $20.00 | $40.00 | $21.00 |
| 4 | Construction layout (Z0013798) | LS | 1 | $3,500.00 | $8,500.00 | $10,250 | $2,500.00 | $5,000.00 | $2,500.00 |
| 5 | Property markers (Z0025505) | EACH | 4 | $280.00 | $1,250.00 | $925.00 | $250.00 | $350.00 | $250.00 |
| 6 | Rock fill (Z0054400) | CY | 78 | $44.00 | $52.50 | $128.00 | $110.00 | $149.50 | $116.00 |
| 7 | Temp pavement (Z0062456) | SY | 434 | $52.00 | $65.00 | $70.00 | $70.00 | $50.00 | $95.00 |
| 8 | Earth excavation (20200100) | CY | 740 | $34.00 | $30.00 | $23.00 | $49.00 | $48.16 | $49.00 |
| 9 | Trench backfill (20800150) | CY | 144 | $28.00 | $50.00 | $57.00 | $75.00 | $78.65 | $270.00 |
| 10 | Topsoil F & P 4 (21101615) | SY | 3,933 | $4.20 | $4.00 | $4.50 | $5.50 | $10.60 | $5.00 |
| 11 | Explor trench 52 (21301052) | LF | 100 | $35.00 | $10.00 | $11.00 | $20.00 | $50.00 | $37.00 |
| 12 | Seeding CL 2A (25000210) | ACRE | 0.75 | $3,900.00 | $4,400.00 | $3,600.00 | $3,600.00 | $4,000.00 | $3,600.00 |
| 13 | Seeding CL 4 (25000310) | ACRE | 0.50 | $3,500.00 | $3,300.00 | $3,200.00 | $3,200.00 | $3,000.00 | $3,200.00 |
| 14 | Mowing (25000750) | ACRE | 0.75 | $100.00 | $2,930.00 | $800.00 | $800.00 | $2,700.00 | $800.00 |
| 15 | Mulch method 3 (25100125) | ACRE | 1 | $4,100.00 | $4,400.00 | $3,800.00 | $3,800.00 | $5,012.50 | $3,800.00 |
| 16 | Erosion contr blanket (25100630) | SY | 717 | $3.10 | $3.30 | $2.50 | $2.50 | $3.00 | $2.50 |
| 17 | Turf reinf mat (25100900) | SY | 250 | $9.10 | $16.50 | $8.00 | $8.00 | $15.00 | $8.00 |
| 18 | Earth exc - eros cont (28000200) | CY | 20 | $42.00 | $45.00 | $70.00 | $30.00 | $50.00 | $49.00 |
| 19 | Temp eros contr seed (28000250) | LB | 342 | $3.50 | $3.85 | $3.00 | $3.00 | $3.50 | $3.00 |
| 20 | Temp ditch checks (28000305) | LF | 100 | $14.00 | $11.00 | $12.50 | $12.50 | $10.00 | $12.50 |
| 21 | Perimeter eros bar (28000400) | LF | 500 | $6.00 | $6.60 | $5.00 | $5.00 | $6.00 | $5.00 |
| 22 | Inlet & pipe protect (28000500) | EACH | 1 | $150.00 | $220.00 | $425.00 | $425.00 | $200.00 | $425.00 |
| 23 | Aggregate - eros cont (28001000) | TON | 30 | $45.00 | $40.00 | $182.00 | $65.00 | $50.00 | $146.00 |
| 24 | Bit matls tack CT (40600290) | LB | 60 | $1.00 | $0.01 | $4.00 | $5.00 | $5.00 | $4.80 |
| 25 | HMA SC IL-9.5 C N50 (40604050) | TON | 23 | $240.00 | $370.00 | $432.50 | $495.00 | $550.00 | $494.50 |
| 26 | Welded wire reinf (44200050) | SY | 134 | $11.00 | $9.00 | $30.00 | $10.00 | $10.00 | $7.00 |
| 27 | CL B patch T4 10 (44200976) | SY | 134 | $134.50 | $140.00 | $192.00 | $310.00 | $252.13 | $274.00 |
| 28 | Dowel bars 1 1/2 (44201299) | EACH | 40 | $20.00 | $25.00 | $45.00 | $80.00 | $25.00 | $28.00 |
| 29 | Saw cuts (44213200) | LF | 122 | $5.00 | $10.00 | $10.00 | $9.00 | $10.00 | $12.50 |
| 30 | Tie bars 3/4 (44213204) | EACH | 17 | $12.00 | $25.00 | $32.00 | $30.00 | $20.00 | $20.00 |
| 31 | Aggregate SHLDS B (48101200) | TON | 354 | $24.00 | $32.00 | $41.00 | $45.00 | $45.00 | $41.10 |
| 32 | Rem exist struct N1 (50100300) | EACH | 1 | $7,400.00 | $3,500.00 | $16,200 | $15,000 | $8,756.00 | $25,000 |
| 33 | Rem/disp uns matl-STR (50200450) | CY | 78 | $42.00 | $48.00 | $35.00 | $35.00 | $48.16 | $82.00 |
| 34 | Reinforcement bars (50800105) | LB | 70 | $4.00 | $10.00 | $20.00 | $1.00 | $15.00 | $6.00 |
| 35 | Name plates (51500100) | EACH | 1 | $1,475.00 | $1,300.00 | $1,300.00 | $1,100.00 | $1,000.00 | $1,450.00 |
| 36 | Temp soil reten systm (52200020) | SF | 504 | $41.00 | $75.00 | $60.00 | $80.00 | $122.93 | $173.00 |
| 37 | Box cul end sec C1 (54001001) | EACH | 2 | $22,300 | $29,000 | $26,000 | $25,000 | $22,935 | $23,500 |
| 38 | PCBC 8X4 (54010804) | LF | 60 | $1,452.00 | $1,250.00 | $1,400.00 | $1,700.00 | $1,895.67 | $1,350.00 |
| 39 | P cul CL A 1 12 (542A0217) | LF | 31 | $77.00 | $70.00 | $125.00 | $80.00 | $97.62 | $125.00 |
| 40 | P cul CL A 2 24 (542A1069) | LF | 64 | $102.00 | $93.00 | $152.00 | $160.00 | $125.99 | $100.00 |
| 41 | Concrete collar (54248510) | CY | 1.40 | $500.00 | $650.00 | $3,000.00 | $1,100.00 | $500.00 | $2,000.00 |
| 42 | TRVRS pipe GRT con ES (54260315) | LF | 151 | $105.00 | $121.00 | $95.00 | $145.00 | $85.00 | $123.00 |
| 43 | Conc ES 542001 24 1:4 (54261424) | EACH | 1 | $3,800.00 | $4,000.00 | $4,500.00 | $5,800.00 | $4,722.30 | $11,900 |
| 44 | Man TA 4 dia T1F CL (60218400) | EACH | 1 | $2,900.00 | $3,500.00 | $6,000.00 | $4,700.00 | $4,902.56 | $4,850.00 |
| 45 | Remov inlets (60500060) | EACH | 1 | $500.00 | $500.00 | $600.00 | $700.00 | $610.50 | $1,450.00 |
| 46 | Misc concrete (61100605) | CY | 3 | $250.00 | $750.00 | $1,300.00 | $1,000.00 | $750.00 | $2,400.00 |
| 47 | Storm sew prot A 12 (61101013) | LF | 150 | $65.00 | $40.00 | $43.00 | $70.00 | $97.62 | $72.00 |
| 48 | FLD tile jun vault 3D (61133200) | EACH | 2 | $1,100.00 | $3,000.00 | $3,000.00 | $4,500.00 | $4,328.50 | $3,400.00 |
| 49 | Storm sewer spec 8 (61140000) | LF | 100 | $45.00 | $40.00 | $38.00 | $70.00 | $86.57 | $51.00 |
| 50 | Storm sewer spec 12 (61140200) | LF | 100 | $60.00 | $45.00 | $52.00 | $80.00 | $93.57 | $53.00 |
| 51 | Delineators (63500105) | EACH | 4 | $100.00 | $200.00 | $66.00 | $100.00 | $150.00 | $50.00 |
| 52 | Fur erect row markers (66600105) | EACH | 10 | $325.00 | $255.00 | $430.00 | $325.00 | $500.00 | $450.00 |
| 53 | Perm surv MKRS T2 (66700305) | EACH | 1 | $3,900.00 | $2,500.00 | $260.00 | $3,500.00 | $3,700.00 | $3,500.00 |
| 54 | Engr field office A (67000400) | CAL MO | 4 | $3,200.00 | $3,000.00 | $2,700.00 | $2,300.00 | $3,500.00 | $5,300.00 |
| 55 | Mobilization (67100100) | LS | 1 | $27,000 | $25,000 | $30,000 | $39,000 | $25,000 | $50,600 |
| 56 | Traf cont-prot 701321 (70100405) | EACH | 1 | $16,500 | $14,795 | $13,450 | $13,450 | $15,000 | $63,200 |
| 57 | Traf cont-prot 701201 (70100450) | LS | 1 | $200.00 | $110.00 | $100.00 | $100.00 | $250.00 | $100.00 |
| 58 | Traf cont-prot 701326 (70100500) | LS | 1 | $200.00 | $110.00 | $100.00 | $100.00 | $250.00 | $100.00 |
| 59 | TR cont surveillance (70103815) | CAL DAY | 4 | $500.00 | $250.00 | $200.00 | $550.00 | $500.00 | $1,000.00 |
| 60 | Temp BR traf signals (70106500) | EACH | 1 | $14,500 | $13,200 | $12,000 | $12,000 | $13,500 | $12,000 |
| 61 | Changeable message SN (70107025) | CAL DAY | 28 | $48.00 | $44.00 | $40.00 | $40.00 | $50.00 | $40.00 |
| 62 | Short term pavt mking (70300100) | LF | 136 | $2.00 | $4.00 | $3.00 | $5.00 | $10.00 | $1.00 |
| 63 | SHRT TRM pavt MK rem (70300150) | SF | 1,028 | $1.80 | $1.32 | $1.20 | $1.20 | $1.30 | $1.20 |
| 64 | Temp PVT MK L4 T4 tape (70307120) | LF | 2,804 | $1.90 | $1.38 | $1.25 | $1.25 | $1.40 | $1.25 |
| 65 | Temp PVT MK L24 T4 tape (70307210) | LF | 24 | $8.40 | $8.25 | $7.50 | $7.50 | $8.00 | $7.50 |
| 66 | Temp conc barrier (70400100) | LF | 350 | $32.00 | $41.50 | $48.24 | $60.00 | $45.00 | $107.00 |
| 67 | Pin temp conc barrier (70400125) | EACH | 36 | $20.00 | $77.00 | $61.00 | $100.00 | $100.00 | $72.00 |
| 68 | Rel temp conc barrier (70400200) | LF | 350 | $14.00 | $16.00 | $18.00 | $20.00 | $20.00 | $20.00 |
| 69 | Imp attn temp NRD TL3 (70600250) | EACH | 2 | $3,700.00 | $3,850.00 | $7,000.00 | $3,500.00 | $4,000.00 | $3,500.00 |
| 70 | Imp attn rel NRD TL3 (70600350) | EACH | 2 | $390.00 | $275.00 | $500.00 | $250.00 | $350.00 | $250.00 |
| 71 | Paint PVT MK line 4 (78001110) | LF | 3,962 | $0.99 | $0.75 | $0.75 | $0.75 | $1.00 | $0.75 |
| 72 | PVT MKG rem WTR blast (78300202) | SF | 403 | $5.25 | $4.95 | $4.50 | $4.50 | $5.00 | $4.50 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of June 13, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.