Martin & Company Excavating: IDOT bid record

Martin & Company Excavating submitted 175 bids on Illinois DOT contracts in the data, from 15 JAN 2021 to 31 JUL 2026, and was the low bidder on 85 of them (49%). When it was not low, its total sat a median +12% above the low bid.

Owner
Illinois DOT
Low bid volume
$135,063,415
Latest bid
31 JUL 2026
Data through
18 SEP 2026
175Bids
85Low bids
49Win rate, percent
+12%Median gap to the low bid when not low, 90 bids

By year

YearBidsLow bidsWin rate
202129724%
2022251352%
202323939%
2024341235%
2025402460%
2026242083%
Martin & Company Excavating, IDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 021607949%
District 0315640%
Martin & Company Excavating, IDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Temporary ramp40600990SY5345 (85%)$6.00$19.46
Bit matls tack CT40600290LB9142 (46%)$0.50$0.01
HMA SC IL-9.5 C N5040604050TON7038 (54%)$96.65$144.00
Conc sup-STR50300255CY5433 (61%)$1,911.50$2,100.00
Incidental HMA surf40800050TON4732 (68%)$111.00$250.00
Short term pavt mking70300100LF5031 (62%)$0.50$1.01
Conc rem50102400CY4431 (70%)$1,955.00$2,400.00
Raised ref PVT MK rem78300200EACH4025 (63%)$20.00$15.00
Trainees TPGZ0076604HR2525 (100%)$15.00$15.00
Temp conc barrier70400100LF5123 (45%)$29.00$31.73
Comb curb gutter rem44000500LF3423 (68%)$6.03$11.61
HMA surf rem butt JT40600982SY3323 (70%)$10.00$16.50
Martin & Company Excavating, IDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Martin & Company Excavating, IDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
31 JUL 202664T48District 02Section (105BR-1)BRR1 of 3$523,502Low, 7.0% under the second
31 JUL 202664T49District 02Section (102BR)BRR1 of 3$443,472Low, 20% under the second
12 JUN 202664T07District 02Section (116BR)&(117BR-1)BDR1 of 2$747,738Low, 0.0% under the second
12 JUN 202664T46District 02Section (115BR)BRR1 of 3$353,100Low, 2.0% under the second
12 JUN 202664T47District 02Section (102BR-1)BRR1 of 2$618,490Low, 1.0% under the second
12 JUN 202664T58District 02Section (109BR)BRR2 of 2$934,035+19%
12 JUN 202664V25District 02Section (1&2)RS1 of 2$241,756Low, 31% under the second
24 APR 202664T06District 02Section ((141-3HB)&(141-3VB)BDR1 of 2$3,168,316Low, 38% under the second
24 APR 202664T42District 02Section 177(-4HB(-1,-2,-3,-4)(2VB)BRR1 of 2$4,082,943Low, 7.0% under the second
24 APR 202664T73District 02Section 101RS1 of 2$1,988,394Low, 7.0% under the second
24 APR 202664U85District 02Section (8R)PP3 of 4$772,133+37%
24 APR 202664U89District 02Section (17R-1BR-1)BDR1 of 3$522,276Low, 40% under the second
24 APR 202664U90District 02Section (102BR-4)BJR1 of 3$1,670,253Low, 18% under the second
24 APR 202685793District 02Project Number: 8Pwj-710 / /, section 25-00358-00-RS1 of 3$1,489,962Low, 9.0% under the second
24 APR 202685797District 02Project Number: Ysis-006 / /, section 25-00365-00-BR1 of 3$582,765Low, 2.0% under the second
27 FEB 202664J38District 02Section (32-2)RS-12 of 2$2,955,930+11%
27 FEB 202664T23District 02Section (141-1)PP1 of 5$138,615Low, 4.0% under the second
27 FEB 202685789District 02Project Number: 6Ktx-734 / /, section 20-00333-00-RS1 of 2$830,341Low, 12% under the second
16 JAN 202664L27District 02Section (22,107)R1 of 2$11,833,444Low, 10% under the second
16 JAN 202664T05District 02Section (101BR-2)BDR1 of 2$460,374Low, 67% under the second
16 JAN 202664T96District 02Section (111BR-1)BDR1 of 4$369,059Low, 15% under the second
16 JAN 202664U20District 02Section (195-3&(110,195-3))PP&RS2 of 2$5,505,680+6.0%
16 JAN 202664U21District 02Section 751 of 2$4,655,130Low, 4.0% under the second
16 JAN 202685786District 02Project Number: Hhn6-619 / /, section 18-00237-00-BR1 of 3$2,834,678Low, 17% under the second
07 NOV 202546944District 021 of 3$1,029,566Low, 16% under the second
Martin & Company Excavating: latest IDOT bids in the data

How this record was read

IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

  • Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy