IDOT contract 64T49 bid tabulation
Section (102BR)BRR. Let by Illinois DOT on July 31, 2026, Ogle, District 02. 3 bids received; low bid $443,472 by Martin & Company Excavating.
- Owner
- Illinois DOT
- Letting
- 31 JUL 2026
- Pay items
- 37
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Martin & Company Excavating | $443,472 | Low |
| 2 | Civil Constructors, Inc. d/b/a/ Helm Civil | $532,329 | +20% |
| 3 | Alliance Contractors, Inc. | $593,026 | +34% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Martin & Company Excavating | 2. Civil Constructors, Inc. d/b/a/ Helm Civil | 3. Alliance Contractors, Inc. |
|---|---|---|---|---|---|---|
| 1 | Aggregate SHLD removl (X4810200) | CY | 68 | $75.00 | $63.00 | $50.00 |
| 2 | Agg SHLDS SPL C (X4811410) | TON | 73 | $55.00 | $67.00 | $262.00 |
| 3 | BR deck grooving long (X5030250) | SY | 227 | $28.00 | $38.00 | $30.86 |
| 4 | Grdrail refl TY C SPL (X7820007) | EACH | 9 | $33.00 | $28.00 | $28.00 |
| 5 | Barrier wall refl SPL (X7820008) | EACH | 8 | $50.00 | $30.00 | $20.00 |
| 6 | Construction layout (Z0013798) | LS | 1 | $2,500.00 | $4,500.00 | $5,000.00 |
| 7 | Diamond grind BR sec (Z0029090) | SY | 343 | $35.00 | $38.00 | $24.08 |
| 8 | Bit matls tack CT (40600290) | LB | 216 | $0.10 | $1.00 | $8.50 |
| 9 | HMA surf rem butt JT (40600982) | SY | 478 | $12.00 | $18.00 | $40.00 |
| 10 | HMA SC IL-9.5 C N50 (40604050) | TON | 40 | $300.00 | $480.00 | $575.00 |
| 11 | Protective coat (50300300) | SY | 380 | $0.01 | $0.01 | $0.01 |
| 12 | Deck slab rep (FD-T2) (53016002) | SY | 13 | $800.00 | $3,600.00 | $4,260.00 |
| 13 | BR deck scar 3/4 (53101002) | SY | 380 | $172.00 | $230.00 | $244.00 |
| 14 | BR DK LTX C oly 2 1/2 (53101409) | SY | 380 | $240.00 | $250.00 | $325.50 |
| 15 | STR rep con DP = < 5 (53212754) | SF | 221 | $180.00 | $232.00 | $180.00 |
| 16 | STR rep con DP over 5 (53212755) | SF | 32 | $190.00 | $275.00 | $220.00 |
| 17 | Epoxy crack injection (59000200) | LF | 25 | $90.00 | $112.00 | $120.00 |
| 18 | SPBGR TY A 6FT posts (63000001) | LF | 588 | $35.00 | $30.36 | $30.36 |
| 19 | Traf bar term T6 (63100085) | EACH | 4 | $5,175.00 | $4,488.00 | $4,488.00 |
| 20 | TR bar TRM T1 SPL FLR (63100169) | EACH | 4 | $4,360.00 | $3,791.00 | $3,791.00 |
| 21 | Guardrail remov (63200310) | LF | 857 | $7.00 | $6.81 | $6.81 |
| 22 | Engr field office A (67000400) | CAL MO | 3 | $3,500.00 | $3,900.00 | $500.00 |
| 23 | Mobilization (67100100) | LS | 1 | $24,000 | $31,940 | $35,500 |
| 24 | Traf cont-prot 701321 (70100405) | EACH | 1 | $15,900 | $18,000 | $16,000 |
| 25 | Traf cont-prot 701201 (70100450) | LS | 1 | $1.00 | $1.00 | $1,000.00 |
| 26 | Temp BR traf signals (70106500) | EACH | 1 | $16,100 | $14,000 | $27,000 |
| 27 | SHRT TRM pavt MK rem (70300150) | SF | 874 | $1.40 | $1.20 | $0.40 |
| 28 | Temp PVT MK L4 T4 tape (70307120) | LF | 2,502 | $1.45 | $1.25 | $1.20 |
| 29 | Temp PVT MK L24 T4 tape (70307210) | LF | 24 | $8.65 | $7.50 | $7.50 |
| 30 | Temp conc barrier (70400100) | LF | 437.50 | $35.00 | $32.00 | $38.00 |
| 31 | Rel temp conc barrier (70400200) | LF | 425 | $12.00 | $12.00 | $12.00 |
| 32 | Imp attn temp NRN TL3 (70600251) | EACH | 2 | $4,050.00 | $3,500.00 | $2,767.00 |
| 33 | Imp attn rel NRN TL3 (70600352) | EACH | 2 | $900.00 | $750.00 | $890.00 |
| 34 | Terminal marker - DA (72501000) | EACH | 4 | $30.00 | $25.00 | $25.00 |
| 35 | Mod ureth PM line 4 (78009004) | LF | 1,703 | $4.60 | $4.00 | $4.00 |
| 36 | GRV RCSD PVT MRKG 5 (78011025) | LF | 1,513 | $2.30 | $2.25 | $2.00 |
| 37 | PVT MKG rem WTR blast (78300202) | SF | 563 | $3.45 | $3.00 | $7.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of July 31, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way