IDOT contract 64J38 bid tabulation
Section (32-2)RS-1. Let by Illinois DOT on February 27, 2026, Whiteside, District 02. 2 bids received; low bid $2,673,307 by Civil Constructors, Inc. d/b/a/ Helm Civil.
- Owner
- Illinois DOT
- Letting
- 27 FEB 2026
- Pay items
- 113
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Civil Constructors, Inc. d/b/a/ Helm Civil | $2,673,307 | Low |
| 2 | Martin & Company Excavating | $2,955,930 | +11% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Civil Constructors, Inc. d/b/a/ Helm Civil | 2. Martin & Company Excavating |
|---|---|---|---|---|---|
| 1 | HMA surf rem-long JT (X4401196) | SY | 538 | $15.00 | $16.00 |
| 2 | Inlets SPL (X6024240) | EACH | 18 | $3,500.00 | $3,900.00 |
| 3 | Inl recon new F&G SPL (X6026108) | EACH | 5 | $2,000.00 | $2,200.00 |
| 4 | Accessible ped signal (X8760200) | EACH | 8 | $1,203.30 | $1,265.00 |
| 5 | Ped pushbutton post (X8760201) | EACH | 4 | $1,759.80 | $1,850.00 |
| 6 | Video veh det sys (X8891001) | EACH | 1 | $30,139 | $32,000 |
| 7 | Concrete steps (Z0012450) | CY | 1.20 | $3,200.00 | $5,000.00 |
| 8 | Conc step remov (Z0012455) | EACH | 1 | $470.00 | $1,200.00 |
| 9 | Construction layout (Z0013798) | LS | 1 | $27,600 | $55,000 |
| 10 | Storm sew WM req 12 (Z0056608) | LF | 28 | $120.00 | $185.00 |
| 11 | Earth excavation (20200100) | CY | 305 | $55.00 | $54.00 |
| 12 | Trench backfill (20800150) | CY | 69 | $17.00 | $65.00 |
| 13 | Topsoil F & P 4 (21101615) | SY | 1,061 | $16.00 | $13.60 |
| 14 | Sodding salt tolerant (25200110) | SY | 1,061 | $35.00 | $67.00 |
| 15 | Supple watering (25200200) | UNIT | 10 | $300.00 | $300.00 |
| 16 | P bit matls tack CT (40600295) | LB | 31,949 | $0.60 | $0.10 |
| 17 | Long joint sealant (40600370) | LF | 7,703 | $3.50 | $4.00 |
| 18 | Matl transfer device (40600405) | TON | 5,178 | $4.50 | $1.00 |
| 19 | HMA BC HM N50 (40600900) | TON | 125 | $120.00 | $150.00 |
| 20 | Temporary ramp (40600990) | SY | 1,178 | $6.00 | $8.00 |
| 21 | HMA BC IL-9.5FG N50 (40602965) | TON | 2,955 | $96.00 | $86.00 |
| 22 | HMA SC IL-9.5 D N50 (40604060) | TON | 3,141 | $96.00 | $82.00 |
| 23 | Incidental HMA surf (40800050) | TON | 471 | $92.00 | $128.00 |
| 24 | PCC driveway pavt 7 (42300300) | SY | 110 | $100.00 | $104.00 |
| 25 | PC conc sidewalk 5 (42400200) | SF | 18,150 | $17.00 | $14.00 |
| 26 | Detectable warnings (42400800) | SF | 1,052 | $44.00 | $50.00 |
| 27 | HMA surf rem 2 3/4 (44000160) | SY | 28,108 | $3.80 | $6.00 |
| 28 | HMA surf rem 3 1/2 (44000163) | SY | 8,428 | $4.90 | $6.50 |
| 29 | Drive pavement rem (44000200) | SY | 81 | $17.00 | $14.00 |
| 30 | Comb curb gutter rem (44000500) | LF | 3,601 | $17.00 | $14.00 |
| 31 | Sidewalk rem (44000600) | SF | 16,894 | $2.40 | $6.50 |
| 32 | Welded wire reinf (44200050) | SY | 455 | $18.00 | $9.00 |
| 33 | CL B patch T3 7 (44200924) | SY | 71 | $110.00 | $190.00 |
| 34 | CL B patch T4 7 (44200926) | SY | 213 | $100.00 | $190.00 |
| 35 | CL B patch T2 10 (44200970) | SY | 155 | $150.00 | $210.00 |
| 36 | CL B patch T3 10 (44200974) | SY | 194 | $150.00 | $210.00 |
| 37 | CL B patch T4 10 (44200976) | SY | 242 | $140.00 | $210.00 |
| 38 | Dowel bars 1 1/2 (44201299) | EACH | 1,510 | $19.00 | $32.00 |
| 39 | Saw cuts (44213200) | LF | 3,580 | $2.46 | $7.00 |
| 40 | Tie bars 3/4 (44213204) | EACH | 36 | $20.00 | $20.00 |
| 41 | Reinforcement bars (50800105) | LB | 15 | $9.00 | $42.00 |
| 42 | Storm sew CL A 1 12 (550A0050) | LF | 153 | $81.00 | $180.00 |
| 43 | SS RG CL A 1 12 (550A2320) | LF | 98 | $82.00 | $180.00 |
| 44 | Storm sewer rem 12 (55100500) | LF | 237 | $37.00 | $18.00 |
| 45 | Man TA 4 dia T1F CL (60218400) | EACH | 1 | $5,500.00 | $4,200.00 |
| 46 | Man TA 5 dia T1F CL (60221100) | EACH | 4 | $7,700.00 | $6,100.00 |
| 47 | Man adjust (60255500) | EACH | 45 | $1,700.00 | $1,720.00 |
| 48 | Inlets adjust (60260100) | EACH | 39 | $300.00 | $1,000.00 |
| 49 | Remov manholes (60500040) | EACH | 5 | $310.00 | $1,300.00 |
| 50 | Remov inlets (60500060) | EACH | 18 | $240.00 | $1,400.00 |
| 51 | Comb CC&G TY B-6.24 (60605000) | LF | 3,360 | $84.00 | $66.50 |
| 52 | Perm surv MKRS T2 (66700305) | EACH | 2 | $3,500.00 | $3,650.00 |
| 53 | Non SPL waste disposl (66900200) | CY | 145 | $100.00 | $112.00 |
| 54 | Soil disposal analy (66900530) | EACH | 8 | $1,300.00 | $1,550.00 |
| 55 | Reg sub P-const plan (66901001) | LS | 1 | $3,700.00 | $4,000.00 |
| 56 | Reg sub F con report (66901003) | LS | 1 | $1,000.00 | $1,300.00 |
| 57 | Reg sub mon (66901006) | CAL DAY | 9 | $1,150.00 | $1,400.00 |
| 58 | Engr field office A (67000400) | CAL MO | 7 | $2,900.00 | $3,000.00 |
| 59 | Mobilization (67100100) | LS | 1 | $160,398 | $162,000 |
| 60 | TR cont & prot 701601 (70102630) | LS | 1 | $25,800 | $65,000 |
| 61 | TR cont & prot 701701 (70102635) | LS | 1 | $100.00 | $250.00 |
| 62 | TR cont & prot 701801 (70102640) | LS | 1 | $2,000.00 | $3,000.00 |
| 63 | TR cont surveillance (70103815) | CAL DAY | 90 | $1.00 | $350.00 |
| 64 | Changeable message SN (70107025) | CAL DAY | 30 | $50.00 | $40.00 |
| 65 | Short term pavt mking (70300100) | LF | 1,151 | $0.70 | $1.00 |
| 66 | SHRT TRM pavt MK rem (70300150) | SF | 384 | $3.00 | $4.00 |
| 67 | Sign panel T1 (72000100) | SF | 603.50 | $33.00 | $35.00 |
| 68 | Remov sign panel T1 (72400310) | SF | 405.50 | $11.00 | $12.50 |
| 69 | Reloc sign panel T1 (72400710) | SF | 171 | $25.00 | $28.00 |
| 70 | Teles STL sin support (72800100) | LF | 768 | $22.00 | $24.00 |
| 71 | Wood sin support (73000100) | LF | 78 | $26.00 | $28.00 |
| 72 | Mod ureth PM LTR-sym (78009000) | SF | 255 | $12.00 | $12.00 |
| 73 | Mod ureth PM line 4 (78009004) | LF | 1,741 | $2.00 | $2.50 |
| 74 | Mod ureth PM line 8 (78009008) | LF | 461 | $4.00 | $4.20 |
| 75 | Mod ureth PM line 12 (78009012) | LF | 810 | $6.00 | $6.00 |
| 76 | Mod ureth PM line 24 (78009024) | LF | 670 | $12.00 | $11.20 |
| 77 | GRV RCSD PM LTR & sym (78011000) | SF | 320 | $9.00 | $10.00 |
| 78 | GRV RCSD PVT MRKG 5 (78011025) | LF | 1,741 | $1.50 | $2.00 |
| 79 | GRV RCSD PVT MRKG 9 (78011045) | LF | 461 | $3.00 | $4.00 |
| 80 | GRV RCSD PVT MRKG 13 (78011065) | LF | 810 | $4.50 | $5.50 |
| 81 | GRV RCSD PVT MRKG 25 (78011125) | LF | 670 | $9.00 | $10.00 |
| 82 | Raised refl pavt MKR (78100100) | EACH | 47 | $95.00 | $98.00 |
| 83 | Raised ref PVT MK rem (78300200) | EACH | 98 | $14.00 | $15.00 |
| 84 | Serv install TY A (80500100) | EACH | 1 | $3,750.00 | $3,950.00 |
| 85 | Undrgrd C PVC 1 1/2 (81028340) | LF | 6 | $12.34 | $13.00 |
| 86 | Undrgrd C PVC 2 1/2 (81028360) | LF | 7 | $18.36 | $19.30 |
| 87 | Undrgrd C PVC 4 (81028390) | LF | 4 | $31.44 | $33.00 |
| 88 | Undrgrd C CNC 1 1/2 (81028740) | LF | 12 | $10.55 | $11.10 |
| 89 | Undrgrd C CNC 2 1/2 (81028760) | LF | 87 | $16.15 | $17.00 |
| 90 | Undrgrd C CNC 4 (81028790) | LF | 177 | $73.92 | $78.00 |
| 91 | Handhole PCC (81400700) | EACH | 3 | $2,970.00 | $3,120.00 |
| 92 | DBL handhole PCC (81400720) | EACH | 1 | $5,160.00 | $5,420.00 |
| 93 | EC C XLP use 1C 10 (81702110) | LF | 391 | $2.04 | $2.20 |
| 94 | Lum LED rdwy G (82110007) | EACH | 1 | $711.40 | $747.00 |
| 95 | Remov elect serv inst (84500120) | EACH | 1 | $900.00 | $950.00 |
| 96 | Fac T3 cab (85700100) | EACH | 1 | $25,368 | $26,700 |
| 97 | Elcbl C signal 14 2C (87301215) | LF | 865 | $1.41 | $1.50 |
| 98 | Elcbl C signal 14 3C (87301225) | LF | 164 | $1.59 | $1.70 |
| 99 | Elcbl C signal 14 5C (87301245) | LF | 937 | $1.97 | $2.10 |
| 100 | Elcbl C egrdc 6 1C (87301900) | LF | 241 | $2.06 | $2.20 |
| 101 | TS post galvs 9 (87502430) | EACH | 2 | $2,870.40 | $3,015.00 |
| 102 | TS post galvs 13 (87502470) | EACH | 2 | $3,372.71 | $3,550.00 |
| 103 | STL comb maa&P 44 (87702950) | EACH | 1 | $25,103 | $26,360 |
| 104 | Conc FDN TY A (87800100) | LF | 12 | $382.25 | $402.00 |
| 105 | Conc FDN TY D (87800200) | LF | 3 | $787.50 | $830.00 |
| 106 | Conc FDN TY E 36D (87800415) | LF | 3 | $2,984.56 | $3,135.00 |
| 107 | SH LED 1F 3S mam (88030020) | EACH | 2 | $883.00 | $928.00 |
| 108 | SH LED 1F 3S BM (88030050) | EACH | 7 | $727.00 | $765.00 |
| 109 | Ped SH LED 1F BM CDT (88102717) | EACH | 8 | $719.80 | $755.00 |
| 110 | TS backplate (88200100) | EACH | 2 | $529.00 | $555.00 |
| 111 | Remov EX TS equip (89502375) | EACH | 1 | $2,750.00 | $2,890.00 |
| 112 | Remov EX handhole (89502380) | EACH | 6 | $840.00 | $885.00 |
| 113 | Remov EX conc FDN (89502385) | EACH | 7 | $660.00 | $695.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of February 27, 2026. Compiled by Mirage Metrics.