Sjostrom & Sons, Inc.: IDOT bid record

Sjostrom & Sons, Inc. submitted 110 bids on Illinois DOT contracts in the data, from 15 JAN 2021 to 12 JUN 2026, and was the low bidder on 25 of them (23%). When it was not low, its total sat a median +17% above the low bid.

Owner
Illinois DOT
Low bid volume
$36,838,915
Latest bid
12 JUN 2026
Data through
18 SEP 2026
110Bids
25Low bids
23Win rate, percent
+17%Median gap to the low bid when not low, 85 bids

By year

YearBidsLow bidsWin rate
202118422%
202231516%
202312433%
202432928%
202511218%
20266117%
Sjostrom & Sons, Inc., IDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 02631422%
District 0328621%
District 0119526%
Sjostrom & Sons, Inc., IDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Bit matls tack CT40600290LB5732 (56%)$0.56$0.01
Protective coat50300300SY4226 (62%)$1.00$3.00
Bit matls PR CT40600275LB3221 (66%)$0.01$0.01
Reinf bars, epoxy CTD50800205LB6720 (30%)$2.30$2.50
Changeable message SN70107025CAL DAY3820 (53%)$40.00$55.00
SHRT TRM pavt MK rem70300150SF3819 (50%)$1.20$1.20
Trainees TPGZ0076604HR1919 (100%)$15.00$15.00
TraineesZ0076600HR1818 (100%)$0.80$0.80
Pavement rem44000100SY4016 (40%)$15.95$20.30
Terminal marker - DA72501000EACH3416 (47%)$40.00$47.85
Perimeter eros bar28000400LF4715 (32%)$4.00$3.50
Temp eros contr seed28000250LB3914 (36%)$5.00$5.00
Sjostrom & Sons, Inc., IDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Sjostrom & Sons, Inc., IDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
12 JUN 202661M49District 01Maywood, section 23-00142-00-LT1 of 4$1,709,017Low, 4.0% under the second
12 JUN 202664U86District 02Section D22 of 4$741,371+2.0%
24 APR 202661M35District 01Harvard, section 21-00067-00-SW3 of 5$350,725+5.0%
27 FEB 202685769District 02Loves Park, section 21-00078-01-SW3 of 6$4,333,755+9.0%
16 JAN 202661L99District 01University Park, section 05-00017-00-LS6 of 6$2,703,709+48%
16 JAN 202662P93District 01Section 2021-172-SW4 of 5$3,260,975+24%
13 JUN 202561L34District 01Skokie, section 13-00295-00-BT6 of 7$2,545,064+21%
13 JUN 202566K63District 03Section (125BR)BR3 of 3$5,001,579+29%
25 APR 202585773District 02Project Number: 7Zx7-897 / /, section 22-00351-00-BR3 of 3$1,713,964+80%
07 MAR 202561L05District 01Lake Forest, section 19-00093-00-SW2 of 5$3,942,650+32%
07 MAR 202561L16District 01Lake Forest, section 23-00099-00-SW4 of 6$309,229+26%
07 MAR 202564S33District 02Section (1063 of 3$659,969+47%
17 JAN 202561K43District 01Cary, section 22-00074-00-MS1 of 4$1,190,661Low, 1.0% under the second
17 JAN 202561K92District 01Project Number: Cugb-890 / /, section 18-00481-00-BR4 of 5$3,271,830+17%
17 JAN 202564S59District 02Section (30,30Y)DR2 of 4$488,076+6.0%
17 JAN 202566P34District 03Section (140B)BRR2 of 2$677,346+45%
17 JAN 202585758District 02Project Number: 90Wr-052 / /, section 19-06126-00-BR1 of 4$3,005,217Low, 10% under the second
08 NOV 202461K54District 01Project Number: Orel-643 / /, section 17-00034-05-BT2 of 3$3,561,098+3.0%
08 NOV 202461K76District 01Project Number: 4Idq-698 / /, section 19-00508-00-BR1 of 2$1,739,696Low, 12% under the second
08 NOV 202461K80District 01Project Number: 0Zis-467 / /, section 18-00489-00-BR1 of 2$1,503,245Low, 16% under the second
08 NOV 202464P06District 02Section 111BR1 of 3$3,998,708Low, 7.0% under the second
08 NOV 202466P35District 03Section (26VBR-1)SCR3 of 3$146,813+7.0%
08 NOV 202487868District 03Oswego, section 21-00053-00-BR3 of 3$2,935,741+17%
20 SEP 202461J74District 01Niles, section 18-00131-00-SW2 of 3$5,367,232+17%
20 SEP 202462T07District 01Section FAP6 of 6$1,401,456+46%
Sjostrom & Sons, Inc.: latest IDOT bids in the data

How this record was read

IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

  • Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy