IDOT contract 66K63 bid tabulation

Section (125BR)BR. Let by Illinois DOT on June 13, 2025, Dekalb, District 03. 3 bids received; low bid $3,866,805 by Civil Constructors, Inc. d/b/a/ Helm Civil.

Owner
Illinois DOT
Letting
13 JUN 2025
Pay items
130
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Civil Constructors, Inc. d/b/a/ Helm Civil$3,866,805Low
2Martin & Company Excavating$3,871,0280.0%
3Sjostrom & Sons, Inc.$5,001,579+29%
IDOT contract 66K63: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Civil Constructors, Inc. d/b/a/ Helm Civil2. Martin & Company Excavating3. Sjostrom & Sons, Inc.
1Temporary ramp SPL (X4060995)SY372$17.50$30.00$50.00
2Bar terminators (X5080530)EACH54$19.00$28.00$50.00
3HLMRB disc fixed 200K (X5211410)EACH12$3,400.00$4,000.00$5,000.00
4HLMRB disc G exp 100K (X5211605)EACH12$3,550.00$4,100.00$5,000.00
5Drainage scuppr DS-11 (X5230174)EACH1$2,000.00$3,500.00$3,500.00
6Remov EX flar end sec (X5427602)EACH2$250.00$785.00$1,000.00
7Delineator removal (X6350120)EACH11$15.00$18.00$16.00
8Linear delin panels 4 (X6350204)EACH24$88.00$33.00$30.00
9Linear delin panels 6 (X6350206)EACH6$105.00$95.00$85.00
10Wov W fence rem & RPL (X6650208)LF515$50.00$25.00$22.00
11Traf cont-prot BLR 21 (X7011800)LS1$500.00$575.00$500.00
12Temp info signing (X7200061)SF84$16.00$18.00$17.00
13RRPM reflector removl (X7830050)EACH8$10.00$12.00$10.00
14RRPM reflector replac (X7830052)EACH8$100.00$115.00$10.00
15BR approach SHLD rem (Z0001495)SY32$72.00$40.00$40.00
16Approach slab rem (Z0004552)SY174$140.00$30.00$50.00
17STR rep con DP = < 5 (Z0012754)SF2$580.00$1,000.00$1,800.00
18Construction layout (Z0013798)LS1$14,500$15,000$25,000
19Temp pavement (Z0062456)SY462$131.00$40.00$140.00
20Trainees (Z0076600)HR500$0.80$0.80$0.80
21Trainees TPG (Z0076604)HR500$15.00$15.00$15.00
22Tree remov 6-15 (20100110)UNIT222$28.00$32.00$28.00
23Tree remov over 15 (20100210)UNIT183$32.00$36.00$32.00
24Temporary fence (20101000)LF738$7.00$10.00$12.00
25Earth excavation (20200100)CY2,070$32.00$20.00$25.00
26Rem & disp uns matl (20201200)CY110$45.00$30.00$35.00
27Furnished excavation (20400800)CY895$29.00$30.00$30.00
28Trench backfill (20800150)CY293$61.00$35.00$45.00
29Topsoil exc & plac (21101505)CY805$38.00$35.00$25.00
30Seeding CL 2A (25000210)ACRE0.25$6,000.00$6,600.00$4,000.00
31Seeding CL 3 (25000300)ACRE0.75$3,333.33$3,750.00$2,000.00
32Nitrogen fert nutr (25000400)LB78$5.00$7.00$1.00
33Phosphorus fert nutr (25000500)LB78$5.00$7.00$1.00
34Potassium fert nutr (25000600)LB78$5.00$7.00$1.00
35Erosion contr blanket (25100630)SY773$1.50$1.75$3.00
36HD eros contr blanket (25100635)SY3,404$1.75$2.00$3.00
37Temp eros contr seed (28000250)LB259$3.50$4.00$1.00
38Temp ditch checks (28000305)LF53$10.00$12.00$15.00
39Perimeter eros bar (28000400)LF2,199$2.25$2.75$4.00
40Inlet & pipe protect (28000500)EACH2$200.00$225.00$250.00
41Stone riprap CL A4 (28100107)SY1,106$70.00$64.00$65.00
42Filter fabric (28200200)SY1,106$5.00$5.00$5.00
43Agg subgrade impr 12 (30300112)SY4,993$18.00$16.00$22.00
44Agg base cse B 12 (35102400)SY425$22.00$18.00$20.00
45Agg surf course TY B (40200800)TON41$40.00$24.00$25.00
46Aggregate-temp access (40201000)TON24$48.00$24.00$25.00
47Bit matls PR CT (40600275)LB12,189$0.01$0.25$0.45
48Bit matls tack CT (40600290)LB3,122$0.01$0.25$0.85
49Long joint sealant (40600370)LF1,118$14.25$16.00$19.00
50Temporary ramp (40600990)SY32$25.00$60.00$120.00
51HMA BC IL-19.0 N50 (40603080)TON46$90.00$100.00$150.00
52HMA SC IL-9.5 C N50 (40604050)TON30$115.00$102.00$185.00
53HMA pavt FD 9 3/4 (40701876)SY2,977$60.00$51.00$70.00
54PVT con HMA BR app SL (42000070)SY186$85.00$106.00$90.00
55Pavement rem (44000100)SY3,394$20.00$14.00$40.00
56Paved SHLD removal (44004250)SY603$12.00$18.00$35.00
57Aggregate SHLDS B9.75 (48101618)SY275$50.00$13.00$40.00
58HMA shoulders 9 3/4 (48203036)SY1,424$60.00$54.00$72.00
59Rem exist sup-STR (50101500)EACH1$240,000$140,000$400,000
60Conc rem (50102400)CY29$1,850.00$1,700.00$1,500.00
61Pipe culvert remov (50105220)LF86$30.00$30.00$50.00
62Structure excavation (50200100)CY40$75.00$38.00$95.00
63Conc struct (50300225)CY60.90$1,960.00$1,575.00$4,500.00
64Conc sup-STR (50300255)CY205.90$2,130.00$1,875.00$3,200.00
65BR deck grooving (50300260)SY707$11.00$22.00$15.00
66Protective coat (50300300)SY968$3.20$5.00$1.00
67Conc supstr app slab (50301350)CY98.90$700.00$750.00$1,200.00
68F & E struct steel (50500105)LS1$880,000$1,135,000$1,100,000
69Stud shear connectors (50500505)EACH3,960$6.20$7.00$7.00
70Reinf bars, epoxy CTD (50800205)LB95,340$2.50$2.22$2.00
71Bar splicers (50800515)EACH723$47.00$35.00$45.00
72Name plates (51500100)EACH1$600.00$950.00$1,500.00
73Pref JT strip seal (52000110)LF95$410.00$300.00$520.00
74Anchor bolts 3/4 (52100510)EACH96$90.00$250.00$265.00
75Temp SHT piling (52200010)SF178$120.00$92.00$130.00
76P cul CL D 2 15 (542D1060)LF61$70.00$85.00$100.00
77P cul CL D 2 36 (542D1081)LF64$135.00$145.00$175.00
78PRC flar end sec 36 (54213681)EACH2$2,250.00$7,500.00$5,000.00
79Slop met ES 15", 1:4 (54260415)EACH1$1,020.00$885.00$5,000.00
80SLP MT ES WG 15",1:4 (54260615)EACH1$1,175.00$1,100.00$5,000.00
81Granular backfill STR (58600101)CY40$110.00$35.00$220.00
82Concrete sealer (58700300)SF1,122$2.70$6.50$2.00
83Epoxy crack injection (59000200)LF21$80.00$150.00$145.00
84Contr low-streng matl (59300100)CY0.70$890.00$3,500.00$5,000.00
85Conc HDWL for P drain (60100060)EACH2$500.00$500.00$750.00
86Pipe underdrain 4 SP (60108100)LF30$65.00$50.00$35.00
87Pipe underdr T 3 (60108501)LF1,035$15.00$30.00$35.00
88Remov inlets (60500060)EACH2$730.00$1,250.00$1,000.00
89SPBGR TY A 9FT posts (63000003)LF800$50.00$45.00$40.00
90Traf bar term T6 (63100085)EACH4$4,000.00$4,950.00$4,500.00
91TR bar TRM T1 SPL tan (63100167)EACH5$3,500.00$3,600.00$3,300.00
92TR bar TRM T1 SPL FLR (63100169)EACH1$3,500.00$3,500.00$3,200.00
93Guardrail remov (63200310)LF1,427$9.00$7.00$6.00
94Delineators (63500105)EACH21$75.00$56.00$55.00
95Shoulder rum strip 8 (64200108)LF2,144$2.43$1.75$7.00
96Non SPL waste disposl (66900200)CY444$67.58$105.00$80.00
97Soil disposal analy (66900530)EACH1$1,350.00$1,500.00$2,000.00
98Reg sub P-const plan (66901001)LS1$3,900.00$4,400.00$5,000.00
99Reg sub F con report (66901003)LS1$1,000.00$1,250.00$1,000.00
100Reg sub mon (66901006)CAL DAY15$900.00$1,000.00$900.00
101Engr field office A (67000400)CAL MO12$2,500.00$4,000.00$3,000.00
102Mobilization (67100100)LS1$232,008$220,000$300,000
103Traf cont-prot 701321 (70100405)EACH1$58,500$65,000$65,000
104Traf cont-prot 701306 (70100460)LS1$1.00$2.00$1.00
105Traf cont-prot 701326 (70100500)LS1$3,000.00$3,500.00$5,000.00
106TR cont surveillance (70103815)CAL DAY111$1.00$2.00$1.00
107Temp BR traf signals (70106500)EACH1$46,500$72,000$60,000
108Temp rumble strips (70106700)EACH15$100.00$125.00$100.00
109Short term pavt mking (70300100)LF606$0.50$1.75$6.20
110SHRT TRM pavt MK rem (70300150)SF226$0.55$0.62$0.60
111Temp PVT MK L24 T4 tape (70307210)LF23$7.20$9.00$8.00
112Temp conc barrier (70400100)LF1,625$24.50$27.00$35.00
113Pin temp conc barrier (70400125)EACH624$25.00$28.00$30.00
114Rel temp conc barrier (70400200)LF1,575$2.90$3.40$6.00
115Imp attn temp FRN TL3 (70600260)EACH2$6,500.00$7,250.00$5,000.00
116Imp attn rel FRN TL3 (70600332)EACH2$2,000.00$2,300.00$3,000.00
117Sign panel T1 (72000100)SF52$28.00$33.00$28.00
118Remov sin pan assy TA (72400100)EACH4$100.00$115.00$100.00
119Remov sign panel T1 (72400310)SF26$12.00$15.00$12.00
120Terminal marker - DA (72501000)EACH6$40.00$40.00$40.00
121Wood sin support (73000100)LF131$33.00$38.00$35.00
122Mod ureth PM line 4 (78009004)LF15,051$1.15$1.50$1.20
123Mod ureth PM line 6 (78009006)LF218$2.00$2.00$1.80
124GRV RCSD PVT MRKG 5 (78011025)LF7,526$0.85$0.75$0.60
125GRV RCSD PVT MRKG 7 (78011035)LF109$1.00$1.00$0.80
126Raised refl pavt MKR (78100100)EACH18$325.00$245.00$210.00
127Grdrail ref type A (78200005)EACH21$25.00$15.00$12.00
128Barr wall ref type C (78200011)EACH12$20.00$25.00$20.00
129Raised ref PVT MK rem (78300200)EACH18$28.00$35.00$150.00
130PVT MKG rem WTR blast (78300202)SF1,169$3.85$5.00$5.00
IDOT contract 66K63: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of June 13, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy