IDOT contract 61K92 bid tabulation
Project Number: Cugb-890 / /, section 18-00481-00-BR. Let by Illinois DOT on January 17, 2025, Mchenry, District 01. 5 bids received; low bid $2,789,285 by Dunnet Bay Construction Company.
- Owner
- Illinois DOT
- Letting
- 17 JAN 2025
- Pay items
- 61
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Dunnet Bay Construction Company | $2,789,285 | Low |
| 2 | Copenhaver Construction, Inc. | $2,893,292 | +4.0% |
| 3 | Martam Construction Incorporated | $3,160,905 | +13% |
| 4 | Sjostrom & Sons, Inc. | $3,271,830 | +17% |
| 5 | Alliance Contractors, Inc. | $3,943,520 | +41% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Dunnet Bay Construction Company | 2. Copenhaver Construction, Inc. | 3. Martam Construction Incorporated | 4. Sjostrom & Sons, Inc. | 5. Alliance Contractors, Inc. |
|---|---|---|---|---|---|---|---|---|
| 1 | Outfall structure (XX007061) | EACH | 2 | $5,000.00 | $3,500.00 | $82,000 | $5,000.00 | $3,600.00 |
| 2 | Washout basin (X0326806) | LS | 1 | $2,500.00 | $1,600.00 | $3,500.00 | $4,500.00 | $750.00 |
| 3 | Eros cont blanket SPL (X2511630) | SY | 6,941 | $1.60 | $2.00 | $1.80 | $1.60 | $1.50 |
| 4 | Dewatering (X5021507) | LS | 1 | $25,000 | $10,000 | $60,000 | $50,000 | $1.00 |
| 5 | Cofferdam typ 1 IS WW (X5021512) | EACH | 2 | $1.00 | $15,000 | $28,000 | $260,000 | $1.00 |
| 6 | 3-sided PCC STR 54 SP (X5042254) | LF | 86 | $16,250 | $14,000 | $14,600 | $12,000 | $26,235 |
| 7 | Memb WTRPRF sys B STR (X5810103) | SY | 564.50 | $50.00 | $77.00 | $36.00 | $60.00 | $50.00 |
| 8 | Engr FLD off A mod (X6700405) | CAL MO | 12 | $3,500.00 | $1,500.00 | $3,200.00 | $3,000.00 | $250.00 |
| 9 | Traf cont & prot SPL (X7010216) | LS | 1 | $15,000 | $89,000 | $147,000 | $25,000 | $14,000 |
| 10 | Asb bearing pad remov (Z0001900) | EACH | 9 | $500.00 | $500.00 | $125.00 | $150.00 | $250.00 |
| 11 | Stab constr entrance (Z0013797) | SY | 244 | $0.01 | $10.00 | $36.00 | $60.00 | $1.00 |
| 12 | Construction layout (Z0013798) | LS | 1 | $18,000 | $19,000 | $67,300 | $25,000 | $8,500.00 |
| 13 | Temp info signing (Z0030850) | SF | 241 | $16.00 | $20.00 | $18.00 | $13.00 | $13.00 |
| 14 | Earth excavation (20200100) | CY | 190 | $150.00 | $45.00 | $45.00 | $40.00 | $10.00 |
| 15 | Rem & disp uns matl (20201200) | CY | 2,210 | $37.00 | $37.00 | $45.00 | $40.00 | $15.00 |
| 16 | Channel excavation (20300100) | CY | 920 | $56.00 | $60.00 | $63.00 | $40.00 | $1.00 |
| 17 | Furnished excavation (20400800) | CY | 1,965 | $39.10 | $0.01 | $23.00 | $40.00 | $5.00 |
| 18 | Porous gran embank (20700220) | CY | 162 | $79.00 | $50.00 | $56.00 | $85.00 | $65.00 |
| 19 | Geotech fab F/GR stab (21001000) | SY | 2,217 | $2.50 | $3.00 | $2.00 | $3.00 | $3.00 |
| 20 | Topsoil exc & plac (21101505) | CY | 875 | $27.33 | $10.00 | $27.00 | $30.00 | $20.00 |
| 21 | Topsoil F & P 6 (21101625) | SY | 360 | $9.00 | $9.00 | $12.00 | $25.00 | $10.00 |
| 22 | Seeding CL 2A (25000210) | ACRE | 0.25 | $2,383.00 | $4,000.00 | $2,600.00 | $2,400.00 | $5,500.00 |
| 23 | Seeding CL 4A (25000312) | ACRE | 1.25 | $2,233.00 | $5,000.00 | $2,500.00 | $2,400.00 | $5,000.00 |
| 24 | Seeding CL 4B (25000314) | ACRE | 0.50 | $3,471.00 | $7,000.00 | $3,800.00 | $2,500.00 | $7,000.00 |
| 25 | Nitrogen fert nutr (25000400) | LB | 16 | $3.00 | $1.00 | $4.00 | $3.00 | $3.00 |
| 26 | Potassium fert nutr (25000600) | LB | 16 | $3.00 | $1.00 | $4.00 | $3.00 | $3.00 |
| 27 | Temp eros contr seed (28000250) | LB | 600 | $3.00 | $0.01 | $4.00 | $3.00 | $3.00 |
| 28 | Temp ditch checks (28000305) | LF | 182 | $3.80 | $15.00 | $4.00 | $4.00 | $10.00 |
| 29 | Perimeter eros bar (28000400) | LF | 2,482 | $1.90 | $3.00 | $2.00 | $3.00 | $3.00 |
| 30 | Temp eros contr blank (28001100) | SY | 22,431 | $0.90 | $1.00 | $1.00 | $0.90 | $0.01 |
| 31 | Stone riprap CL A3 (28100105) | SY | 88 | $91.00 | $150.00 | $132.00 | $65.00 | $140.00 |
| 32 | Filter fabric (28200200) | SY | 897 | $7.00 | $4.00 | $3.00 | $5.00 | $1.00 |
| 33 | Articul block rev mat (28500400) | SY | 809 | $241.00 | $405.00 | $265.00 | $250.00 | $445.00 |
| 34 | Agg subgrade improve (30300001) | CY | 930 | $50.00 | $49.00 | $54.00 | $65.00 | $75.00 |
| 35 | Agg subgrade impr 12 (30300112) | SY | 2,563 | $26.33 | $17.00 | $16.00 | $25.00 | $25.00 |
| 36 | Bit matls PR CT (40600275) | LB | 5,153 | $0.01 | $0.10 | $0.10 | $0.01 | $0.10 |
| 37 | Bit matls tack CT (40600290) | LB | 2,199 | $0.01 | $0.10 | $0.10 | $0.01 | $0.10 |
| 38 | Long joint sealant (40600370) | LF | 1,350 | $11.57 | $14.00 | $12.00 | $12.00 | $12.00 |
| 39 | HMA surf rem butt JT (40600982) | SY | 12 | $1.00 | $120.00 | $1.00 | $1.00 | $112.40 |
| 40 | HMA BC IL-9.5 N50 (40602978) | TON | 12 | $131.00 | $750.00 | $150.00 | $135.00 | $508.00 |
| 41 | HMA BC IL-19.0 N50 (40603080) | TON | 9 | $152.00 | $750.00 | $170.00 | $155.00 | $385.00 |
| 42 | HMA SC IL-9.5 D N50 (40604060) | TON | 19 | $103.00 | $950.00 | $120.00 | $105.00 | $457.00 |
| 43 | HMA pavt FD 8 (40701841) | SY | 1,430 | $49.00 | $75.00 | $52.00 | $50.00 | $37.00 |
| 44 | Pavement rem (44000100) | SY | 1,479 | $17.00 | $19.00 | $16.00 | $15.00 | $20.00 |
| 45 | HMA surf rem 3 1/2 (44000163) | SY | 165 | $34.00 | $107.00 | $37.00 | $34.00 | $29.00 |
| 46 | HMA shoulders 8 (48203029) | SY | 860 | $35.00 | $89.00 | $38.00 | $35.00 | $38.00 |
| 47 | Rem exist struct (50100100) | EACH | 1 | $50,000 | $152,000 | $140,000 | $190,650 | $474,500 |
| 48 | Cofferdam excavation (50200300) | CY | 1,034 | $52.00 | $20.00 | $63.00 | $40.00 | $1.00 |
| 49 | Rem/disp uns matl-STR (50200450) | CY | 22 | $100.00 | $55.00 | $96.00 | $85.00 | $1.00 |
| 50 | Name plates (51500100) | EACH | 1 | $850.00 | $1,200.00 | $1,200.00 | $1,000.00 | $1,000.00 |
| 51 | Granular backfill STR (58600101) | CY | 1,119 | $56.00 | $55.00 | $58.00 | $75.00 | $1.00 |
| 52 | Conc HDWL for P drain (60100060) | EACH | 8 | $700.00 | $800.00 | $550.00 | $800.00 | $850.00 |
| 53 | Pipe underdrain 4 SP (60108100) | LF | 286 | $38.00 | $30.00 | $32.00 | $40.00 | $40.00 |
| 54 | Pipe underdr T 2 4 (60108204) | LF | 1,392 | $33.50 | $19.00 | $23.00 | $40.00 | $40.00 |
| 55 | Guardrail remov (63200310) | LF | 486 | $0.01 | $10.00 | $10.00 | $10.00 | $15.00 |
| 56 | Fur erect row markers (66600105) | EACH | 13 | $825.00 | $500.00 | $900.00 | $650.00 | $1,500.00 |
| 57 | Mobilization (67100100) | LS | 1 | $167,357 | $189,000 | $186,000 | $281,000 | $236,000 |
| 58 | Changeable message SN (70107025) | CAL DAY | 270 | $30.00 | $45.00 | $33.00 | $30.00 | $30.00 |
| 59 | Pref PL PM TD STD L4 (78004620) | LF | 2,580 | $7.25 | $5.00 | $8.00 | $6.00 | $4.50 |
| 60 | GRV RCSD PVT MRKG 5 (78011025) | LF | 2,580 | $0.95 | $3.00 | $1.00 | $2.00 | $1.95 |
| 61 | Raised ref PVT MK rem (78300200) | EACH | 7 | $25.00 | $100.00 | $30.00 | $1.00 | $50.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of January 17, 2025. Compiled by Mirage Metrics.