Martam Construction Incorporated: IDOT bid record

Martam Construction Incorporated submitted 270 bids on Illinois DOT contracts in the data, from 15 JAN 2021 to 18 SEP 2026, and was the low bidder on 73 of them (27%). When it was not low, its total sat a median +14% above the low bid.

Owner
Illinois DOT
Low bid volume
$222,359,202
Latest bid
18 SEP 2026
Data through
18 SEP 2026
270Bids
73Low bids
27Win rate, percent
+14%Median gap to the low bid when not low, 196 bids

By year

YearBidsLow bidsWin rate
2021541528%
202249612%
202339615%
2024502142%
2025441330%
2026341235%
Martam Construction Incorporated, IDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 012517229%
District 021816%
District 03100%
Martam Construction Incorporated, IDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Trainees TPGZ0076604HR164164 (100%)$15.00$15.00
TraineesZ0076600HR153153 (100%)$0.80$0.80
Bit matls tack CT40600290LB20298 (49%)$0.10$0.01
Protective coat50300300SY11758 (50%)$1.00$3.00
Bit matls PR CT40600275LB7858 (74%)$0.01$0.01
Comb curb gutter rem44000500LF15855 (35%)$8.00$11.61
Sidewalk rem44000600SF15749 (31%)$2.54$3.00
Conc rem50102400CY10348 (47%)$1,800.00$2,400.00
BR deck scar 3/4Z0012130SY7048 (69%)$46.00$70.53
Agg subgrade impr 1230300112SY10840 (37%)$16.69$21.00
Temp conc barrier70400100LF13638 (28%)$28.00$31.73
Drive pavement rem44000200SY11636 (31%)$14.72$20.00
Martam Construction Incorporated, IDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Martam Construction Incorporated, IDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
18 SEP 202680B49District 01Section (CIP-617)1 of 6$759,267Low, 9.0% under the second
31 JUL 202661K85District 01Rolling Meadows, section 21-00126-00-PV8 of 10$3,177,667+13%
31 JUL 202662Y20District 01Section 2025-1070-BDR,BJR1 of 5$1,236,716Low, 13% under the second
31 JUL 202680B42District 01Section 2025-2020-I4 of 4$3,275,849+137%
31 JUL 202680B44District 01Section (1313VB-VC-WPGM)2 of 5$2,383,504+16%
12 JUN 202661M51District 01Project Number:, section 23-P4062-00-BT1 of 3$3,179,237Low, 5.0% under the second
12 JUN 202662L30District 01Section 2020-142-C&DR2 of 6$15,122,173+8.0%
12 JUN 202662T46District 01Section FAU2 of 4$639,954+6.0%
12 JUN 202662U72District 01Section FAP1 of 5$52,825,490Low, 0.0% under the second
12 JUN 202662V08District 01Section 20232 of 3$2,921,524+57%
12 JUN 202680B66District 01Section (3233-211-VB)4 of 4$588,491+48%
12 JUN 202680D46District 01Section 2026-2181-C,HBK6 of 7$1,361,632+25%
24 APR 202661L54District 01Berwyn, section 17-00175-00-LS1 of 2$10,340,904Low, 14% under the second
24 APR 202661M17District 01Algonquin, section 22-00093-00-PV6 of 6$4,510,343+22%
24 APR 202661M41District 01Highland Park, section 19-00137-00-BT3 of 3$3,987,858+30%
24 APR 202662K33District 01Section 2019-161-W2 of 4$33,268,523+5.0%
24 APR 202662P51District 01Section 2021-133-N1 of 3$6,339,172Low, 30% under the second
24 APR 202662Y30District 01Section (60B&C-NRM)BDR,BJR1 of 4$786,723Low, 2.0% under the second
24 APR 202664U89District 02Section (17R-1BR-1)BDR2 of 3$732,811+40%
24 APR 202664U90District 02Section (102BR-4)BJR3 of 3$2,455,466+47%
24 APR 202680B20District 01Section 2025-1094-RS2 of 4$2,342,896+30%
24 APR 202680B21District 01Section 2025-2000-RS2 of 3$5,356,450+17%
24 APR 202680B48District 01Section (1010B-89)1 of 4$1,108,954Low, 9.0% under the second
24 APR 202680B62District 01Section (0404.2-1B)1 of 3$1,446,233Low, 8.0% under the second
27 FEB 202661M26District 01Schaumburg, section 23-00146-00-PV4 of 4$13,868,053+10%
Martam Construction Incorporated: latest IDOT bids in the data

How this record was read

IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

  • Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy