IDOT contract 62Y20 bid tabulation

Section 2025-1070-BDR,BJR. Let by Illinois DOT on July 31, 2026, Cook, District 01. 5 bids received; low bid $1,236,716 by Martam Construction Incorporated.

Owner
Illinois DOT
Letting
31 JUL 2026
Pay items
74
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Martam Construction Incorporated$1,236,716Low
2D. Construction, Inc.$1,392,514+13%
3Areatha Construction Co., Inc.$1,462,965+18%
4Lorig Construction Company$1,530,482+24%
5MYS, Incorporated$1,802,882+46%
IDOT contract 62Y20: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Martam Construction Incorporated2. D. Construction, Inc.3. Areatha Construction Co., Inc.4. Lorig Construction Company5. MYS, Incorporated
1Clearing & grubbing (X2010512)SY153$38.00$30.80$28.00$28.00$39.92
2BR deck grooving long (X5030250)SY1,103$11.00$6.60$8.65$11.50$13.31
3Engrs FLD ofc TY A D1 (X6700407)CAL MO12$4,200.00$5,000.00$3,000.00$3,800.00$3,163.89
4Traf cont & prot SPL (X7010216)LS1$100,000$35,000$28,149$230,000$108,189
5Temp info signing (X7200061)SF51.40$20.00$30.00$18.00$22.00$19.96
6RRPM reflector removl (X7830050)EACH80$16.00$20.00$15.00$12.00$7.87
7RRPM reflector replac (X7830052)EACH80$22.00$27.50$15.00$10.00$27.72
8Temp TR signal timing (X8900104)EACH3$800.00$825.00$750.00$700.00$2,102.48
9Appr slab repair (PD) (Z0001800)SY19$950.00$1,250.00$968.70$1,000.00$1,128.68
10BR DK LTX C oly 2 3/4 (Z0006016)SY1,128$135.00$160.00$248.15$181.00$281.75
11Cleaning bridge seats (Z0010400)SF336$10.00$10.00$4.05$12.00$12.40
12BR deck scar 3/4 (Z0012130)SY1,128$54.00$75.00$148.00$111.00$96.23
13Conc pavt scar (Z0012800)SY753$8.00$15.00$6.40$65.00$44.59
14Construction layout (Z0013798)LS1$4,000.00$61,500$12,000$5,000.00$5,543.96
15Deck slab rep (FD-T2) (Z0016002)SY12$2,800.00$2,000.00$1,382.50$2,200.00$2,051.27
16Diamond grind BR sec (Z0029090)SY1,103$13.00$9.35$17.15$14.00$21.07
17Reloc name plates (Z0049790)EACH1$600.00$2,000.00$386.15$375.00$1,933.53
18Tree remov 6-15 (20100110)UNIT18$340.00$132.00$120.00$50.00$343.73
19Topsoil F & P 2 (21101605)SY153$12.00$14.30$13.00$12.00$12.20
20Seeding CL 2A (25000210)ACRE0.25$9,800.00$6,160.00$5,600.00$9,000.00$9,757.37
21Seeding CL 3 (25000300)ACRE0.25$10,600$7,040.00$6,400.00$10,250$2,841.28
22Nitrogen fert nutr (25000400)LB45$6.00$6.60$6.00$5.00$5.54
23Potassium fert nutr (25000600)LB45$6.00$6.60$6.00$5.00$5.54
24Erosion contr blanket (25100630)SY306$4.00$6.60$6.00$3.00$3.33
25Perimeter eros bar (28000400)LF105$22.00$9.90$9.00$15.00$5.54
26Inlet filters (28000510)EACH27$350.00$250.00$290.00$325.00$354.82
27Bit matls tack CT (40600290)LB594$0.10$0.01$0.01$0.01$0.01
28Long joint sealant (40600370)LF785$5.00$11.64$4.75$28.00$6.08
29PCC surf rem butt JT (40600985)SY569$10.00$0.01$0.10$80.00$46.57
30P HMA SC SMA 9.5 F N80 (40605026)TON147$330.00$185.00$290.00$565.00$371.29
31Protective coat (42001300)SY65$2.00$1.00$2.90$4.00$8.00
32PC conc sidewalk 5 (42400200)SF803$14.00$15.00$16.20$15.00$24.24
33Curb rem (44000300)LF63$15.00$20.00$15.50$27.00$29.95
34Comb curb gutter rem (44000500)LF220$15.00$15.00$31.45$30.00$29.95
35Sidewalk rem (44000600)SF803$4.00$5.00$5.15$4.00$3.58
36Relief joint 2 (45000110)LF171$48.00$0.01$277.80$75.00$105.34
37Conc rem (50102400)CY41.10$2,100.00$3,000.00$2,140.65$2,500.00$2,795.89
38Protective shield (50157300)SY1,323$42.00$80.00$50.00$1.00$150.29
39Conc sup-STR (50300255)CY48.70$2,800.00$3,500.00$3,253.75$3,000.00$2,522.50
40Protective coat (50300300)SY1,390$1.00$1.00$2.95$2.25$2.74
41Reinf bars, epoxy CTD (50800205)LB10,370$4.00$4.00$3.25$4.00$6.88
42Bar splicers (50800515)EACH60$63.00$55.00$62.70$57.00$46.81
43Pref JT strip seal (52000110)LF188$325.00$300.00$407.25$245.00$328.11
44Concrete sealer (58700300)SF336$5.00$1.00$3.95$12.00$2.99
45FR & lids adjust (60300305)EACH1$800.00$1,000.00$850.00$3,000.00$380.13
46Grates T24 (60402640)EACH1$650.00$1,000.00$850.00$550.00$1,130.11
47Conc curb TB (60600605)LF63$72.00$60.00$118.75$91.00$74.47
48Comb CC&G TY B-6.24 (60605000)LF220$99.00$50.00$118.75$110.00$75.61
49R&R rail elem EX GDRL (63300575)LF75$45.00$77.00$39.85$45.00$44.16
50Mobilization (67100100)LS1$72,000$80,000$87,780$75,000$141,429
51Changeable message SN (70107025)CAL DAY45$35.00$100.00$30.00$30.00$44.35
52Night work zone light (70200100)LS1$5,000.00$10,000$0.01$100.00$19,887
53SHRT TRM pavt MK rem (70300150)SF7,621$1.00$1.00$1.00$0.40$0.44
54Temp PVT MK LTR & sym T4 tape (70307100)SF110$4.00$7.75$3.75$10.00$4.05
55Temp PVT MK L4 T4 tape (70307120)LF21,890$1.30$1.20$1.20$1.30$1.33
56Temp PVT MK L6 T4 tape (70307130)LF559$2.00$2.95$1.80$2.00$2.05
57Temp PVT MK L12 T4 tape (70307160)LF127$4.00$4.25$3.60$4.00$4.44
58Temp PVT MK L24 T4 tape (70307210)LF186$8.00$7.75$7.20$10.00$7.87
59Temp conc barrier (70400100)LF800$32.00$41.80$48.50$29.00$38.81
60Pin temp conc barrier (70400125)EACH288$20.00$22.00$19.85$25.00$21.07
61Rel temp conc barrier (70400200)LF1,200$12.00$8.25$8.90$6.00$7.76
62Imp attn temp FRD TL2 (70600235)EACH5$4,800.00$7,150.00$4,416.00$1,000.00$4,896.42
63Imp attn rel FRD TL2 (70600320)EACH5$2,500.00$3,080.00$2,241.00$500.00$2,484.80
64Pref PL PM TD STD L 7 (78004635)LF902$9.00$9.68$8.75$11.00$9.76
65Mod ureth PM LTR-sym (78009000)SF400$7.00$6.82$6.00$6.50$6.87
66Mod ureth PM line 4 (78009004)LF3,711$1.80$1.76$0.90$1.10$1.77
67Mod ureth PM line 6 (78009006)LF1,703$2.00$1.98$1.50$1.75$2.00
68Mod ureth PM line 12 (78009012)LF185$3.80$3.74$3.00$4.25$3.77
69Mod ureth PM line 24 (78009024)LF186$7.00$7.59$6.00$7.00$7.65
70GRV RCSD PVT MRKG 8 (78011040)LF902$2.80$2.75$5.00$3.25$2.77
71Raised refl pavt MKR (78100100)EACH20$30.00$269.50$225.00$250.00$271.66
72Barr wall ref type C (78200011)EACH128$16.00$20.00$15.00$8.00$8.87
73Raised ref PVT MK rem (78300200)EACH28$25.00$30.00$25.00$15.00$55.44
74PVT MKG rem WTR blast (78300202)SF2,310$3.80$3.30$3.50$1.75$2.77
IDOT contract 62Y20: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of July 31, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way