IDOT contract 62Y20 bid tabulation
Section 2025-1070-BDR,BJR. Let by Illinois DOT on July 31, 2026, Cook, District 01. 5 bids received; low bid $1,236,716 by Martam Construction Incorporated.
- Owner
- Illinois DOT
- Letting
- 31 JUL 2026
- Pay items
- 74
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Martam Construction Incorporated | $1,236,716 | Low |
| 2 | D. Construction, Inc. | $1,392,514 | +13% |
| 3 | Areatha Construction Co., Inc. | $1,462,965 | +18% |
| 4 | Lorig Construction Company | $1,530,482 | +24% |
| 5 | MYS, Incorporated | $1,802,882 | +46% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Martam Construction Incorporated | 2. D. Construction, Inc. | 3. Areatha Construction Co., Inc. | 4. Lorig Construction Company | 5. MYS, Incorporated |
|---|---|---|---|---|---|---|---|---|
| 1 | Clearing & grubbing (X2010512) | SY | 153 | $38.00 | $30.80 | $28.00 | $28.00 | $39.92 |
| 2 | BR deck grooving long (X5030250) | SY | 1,103 | $11.00 | $6.60 | $8.65 | $11.50 | $13.31 |
| 3 | Engrs FLD ofc TY A D1 (X6700407) | CAL MO | 12 | $4,200.00 | $5,000.00 | $3,000.00 | $3,800.00 | $3,163.89 |
| 4 | Traf cont & prot SPL (X7010216) | LS | 1 | $100,000 | $35,000 | $28,149 | $230,000 | $108,189 |
| 5 | Temp info signing (X7200061) | SF | 51.40 | $20.00 | $30.00 | $18.00 | $22.00 | $19.96 |
| 6 | RRPM reflector removl (X7830050) | EACH | 80 | $16.00 | $20.00 | $15.00 | $12.00 | $7.87 |
| 7 | RRPM reflector replac (X7830052) | EACH | 80 | $22.00 | $27.50 | $15.00 | $10.00 | $27.72 |
| 8 | Temp TR signal timing (X8900104) | EACH | 3 | $800.00 | $825.00 | $750.00 | $700.00 | $2,102.48 |
| 9 | Appr slab repair (PD) (Z0001800) | SY | 19 | $950.00 | $1,250.00 | $968.70 | $1,000.00 | $1,128.68 |
| 10 | BR DK LTX C oly 2 3/4 (Z0006016) | SY | 1,128 | $135.00 | $160.00 | $248.15 | $181.00 | $281.75 |
| 11 | Cleaning bridge seats (Z0010400) | SF | 336 | $10.00 | $10.00 | $4.05 | $12.00 | $12.40 |
| 12 | BR deck scar 3/4 (Z0012130) | SY | 1,128 | $54.00 | $75.00 | $148.00 | $111.00 | $96.23 |
| 13 | Conc pavt scar (Z0012800) | SY | 753 | $8.00 | $15.00 | $6.40 | $65.00 | $44.59 |
| 14 | Construction layout (Z0013798) | LS | 1 | $4,000.00 | $61,500 | $12,000 | $5,000.00 | $5,543.96 |
| 15 | Deck slab rep (FD-T2) (Z0016002) | SY | 12 | $2,800.00 | $2,000.00 | $1,382.50 | $2,200.00 | $2,051.27 |
| 16 | Diamond grind BR sec (Z0029090) | SY | 1,103 | $13.00 | $9.35 | $17.15 | $14.00 | $21.07 |
| 17 | Reloc name plates (Z0049790) | EACH | 1 | $600.00 | $2,000.00 | $386.15 | $375.00 | $1,933.53 |
| 18 | Tree remov 6-15 (20100110) | UNIT | 18 | $340.00 | $132.00 | $120.00 | $50.00 | $343.73 |
| 19 | Topsoil F & P 2 (21101605) | SY | 153 | $12.00 | $14.30 | $13.00 | $12.00 | $12.20 |
| 20 | Seeding CL 2A (25000210) | ACRE | 0.25 | $9,800.00 | $6,160.00 | $5,600.00 | $9,000.00 | $9,757.37 |
| 21 | Seeding CL 3 (25000300) | ACRE | 0.25 | $10,600 | $7,040.00 | $6,400.00 | $10,250 | $2,841.28 |
| 22 | Nitrogen fert nutr (25000400) | LB | 45 | $6.00 | $6.60 | $6.00 | $5.00 | $5.54 |
| 23 | Potassium fert nutr (25000600) | LB | 45 | $6.00 | $6.60 | $6.00 | $5.00 | $5.54 |
| 24 | Erosion contr blanket (25100630) | SY | 306 | $4.00 | $6.60 | $6.00 | $3.00 | $3.33 |
| 25 | Perimeter eros bar (28000400) | LF | 105 | $22.00 | $9.90 | $9.00 | $15.00 | $5.54 |
| 26 | Inlet filters (28000510) | EACH | 27 | $350.00 | $250.00 | $290.00 | $325.00 | $354.82 |
| 27 | Bit matls tack CT (40600290) | LB | 594 | $0.10 | $0.01 | $0.01 | $0.01 | $0.01 |
| 28 | Long joint sealant (40600370) | LF | 785 | $5.00 | $11.64 | $4.75 | $28.00 | $6.08 |
| 29 | PCC surf rem butt JT (40600985) | SY | 569 | $10.00 | $0.01 | $0.10 | $80.00 | $46.57 |
| 30 | P HMA SC SMA 9.5 F N80 (40605026) | TON | 147 | $330.00 | $185.00 | $290.00 | $565.00 | $371.29 |
| 31 | Protective coat (42001300) | SY | 65 | $2.00 | $1.00 | $2.90 | $4.00 | $8.00 |
| 32 | PC conc sidewalk 5 (42400200) | SF | 803 | $14.00 | $15.00 | $16.20 | $15.00 | $24.24 |
| 33 | Curb rem (44000300) | LF | 63 | $15.00 | $20.00 | $15.50 | $27.00 | $29.95 |
| 34 | Comb curb gutter rem (44000500) | LF | 220 | $15.00 | $15.00 | $31.45 | $30.00 | $29.95 |
| 35 | Sidewalk rem (44000600) | SF | 803 | $4.00 | $5.00 | $5.15 | $4.00 | $3.58 |
| 36 | Relief joint 2 (45000110) | LF | 171 | $48.00 | $0.01 | $277.80 | $75.00 | $105.34 |
| 37 | Conc rem (50102400) | CY | 41.10 | $2,100.00 | $3,000.00 | $2,140.65 | $2,500.00 | $2,795.89 |
| 38 | Protective shield (50157300) | SY | 1,323 | $42.00 | $80.00 | $50.00 | $1.00 | $150.29 |
| 39 | Conc sup-STR (50300255) | CY | 48.70 | $2,800.00 | $3,500.00 | $3,253.75 | $3,000.00 | $2,522.50 |
| 40 | Protective coat (50300300) | SY | 1,390 | $1.00 | $1.00 | $2.95 | $2.25 | $2.74 |
| 41 | Reinf bars, epoxy CTD (50800205) | LB | 10,370 | $4.00 | $4.00 | $3.25 | $4.00 | $6.88 |
| 42 | Bar splicers (50800515) | EACH | 60 | $63.00 | $55.00 | $62.70 | $57.00 | $46.81 |
| 43 | Pref JT strip seal (52000110) | LF | 188 | $325.00 | $300.00 | $407.25 | $245.00 | $328.11 |
| 44 | Concrete sealer (58700300) | SF | 336 | $5.00 | $1.00 | $3.95 | $12.00 | $2.99 |
| 45 | FR & lids adjust (60300305) | EACH | 1 | $800.00 | $1,000.00 | $850.00 | $3,000.00 | $380.13 |
| 46 | Grates T24 (60402640) | EACH | 1 | $650.00 | $1,000.00 | $850.00 | $550.00 | $1,130.11 |
| 47 | Conc curb TB (60600605) | LF | 63 | $72.00 | $60.00 | $118.75 | $91.00 | $74.47 |
| 48 | Comb CC&G TY B-6.24 (60605000) | LF | 220 | $99.00 | $50.00 | $118.75 | $110.00 | $75.61 |
| 49 | R&R rail elem EX GDRL (63300575) | LF | 75 | $45.00 | $77.00 | $39.85 | $45.00 | $44.16 |
| 50 | Mobilization (67100100) | LS | 1 | $72,000 | $80,000 | $87,780 | $75,000 | $141,429 |
| 51 | Changeable message SN (70107025) | CAL DAY | 45 | $35.00 | $100.00 | $30.00 | $30.00 | $44.35 |
| 52 | Night work zone light (70200100) | LS | 1 | $5,000.00 | $10,000 | $0.01 | $100.00 | $19,887 |
| 53 | SHRT TRM pavt MK rem (70300150) | SF | 7,621 | $1.00 | $1.00 | $1.00 | $0.40 | $0.44 |
| 54 | Temp PVT MK LTR & sym T4 tape (70307100) | SF | 110 | $4.00 | $7.75 | $3.75 | $10.00 | $4.05 |
| 55 | Temp PVT MK L4 T4 tape (70307120) | LF | 21,890 | $1.30 | $1.20 | $1.20 | $1.30 | $1.33 |
| 56 | Temp PVT MK L6 T4 tape (70307130) | LF | 559 | $2.00 | $2.95 | $1.80 | $2.00 | $2.05 |
| 57 | Temp PVT MK L12 T4 tape (70307160) | LF | 127 | $4.00 | $4.25 | $3.60 | $4.00 | $4.44 |
| 58 | Temp PVT MK L24 T4 tape (70307210) | LF | 186 | $8.00 | $7.75 | $7.20 | $10.00 | $7.87 |
| 59 | Temp conc barrier (70400100) | LF | 800 | $32.00 | $41.80 | $48.50 | $29.00 | $38.81 |
| 60 | Pin temp conc barrier (70400125) | EACH | 288 | $20.00 | $22.00 | $19.85 | $25.00 | $21.07 |
| 61 | Rel temp conc barrier (70400200) | LF | 1,200 | $12.00 | $8.25 | $8.90 | $6.00 | $7.76 |
| 62 | Imp attn temp FRD TL2 (70600235) | EACH | 5 | $4,800.00 | $7,150.00 | $4,416.00 | $1,000.00 | $4,896.42 |
| 63 | Imp attn rel FRD TL2 (70600320) | EACH | 5 | $2,500.00 | $3,080.00 | $2,241.00 | $500.00 | $2,484.80 |
| 64 | Pref PL PM TD STD L 7 (78004635) | LF | 902 | $9.00 | $9.68 | $8.75 | $11.00 | $9.76 |
| 65 | Mod ureth PM LTR-sym (78009000) | SF | 400 | $7.00 | $6.82 | $6.00 | $6.50 | $6.87 |
| 66 | Mod ureth PM line 4 (78009004) | LF | 3,711 | $1.80 | $1.76 | $0.90 | $1.10 | $1.77 |
| 67 | Mod ureth PM line 6 (78009006) | LF | 1,703 | $2.00 | $1.98 | $1.50 | $1.75 | $2.00 |
| 68 | Mod ureth PM line 12 (78009012) | LF | 185 | $3.80 | $3.74 | $3.00 | $4.25 | $3.77 |
| 69 | Mod ureth PM line 24 (78009024) | LF | 186 | $7.00 | $7.59 | $6.00 | $7.00 | $7.65 |
| 70 | GRV RCSD PVT MRKG 8 (78011040) | LF | 902 | $2.80 | $2.75 | $5.00 | $3.25 | $2.77 |
| 71 | Raised refl pavt MKR (78100100) | EACH | 20 | $30.00 | $269.50 | $225.00 | $250.00 | $271.66 |
| 72 | Barr wall ref type C (78200011) | EACH | 128 | $16.00 | $20.00 | $15.00 | $8.00 | $8.87 |
| 73 | Raised ref PVT MK rem (78300200) | EACH | 28 | $25.00 | $30.00 | $25.00 | $15.00 | $55.44 |
| 74 | PVT MKG rem WTR blast (78300202) | SF | 2,310 | $3.80 | $3.30 | $3.50 | $1.75 | $2.77 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of July 31, 2026. Compiled by Mirage Metrics.