Areatha Construction Co., Inc.: IDOT bid record
Areatha Construction Co., Inc. submitted 140 bids on Illinois DOT contracts in the data, from 15 JAN 2021 to 18 SEP 2026, and was the low bidder on 7 of them (5%). When it was not low, its total sat a median +15% above the low bid.
- Owner
- Illinois DOT
- Low bid volume
- $19,256,705
- Latest bid
- 18 SEP 2026
- Data through
- 18 SEP 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2021 | 25 | 1 | 4% |
| 2022 | 22 | 0 | 0% |
| 2023 | 25 | 1 | 4% |
| 2024 | 33 | 2 | 6% |
| 2025 | 17 | 2 | 12% |
| 2026 | 18 | 1 | 6% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Trainees TPG | Z0076604 | HR | 71 | 71 (100%) | $15.00 | $15.00 |
| Trainees | Z0076600 | HR | 66 | 66 (100%) | $0.80 | $0.80 |
| Changeable message SN | 70107025 | CAL DAY | 106 | 61 (58%) | $30.00 | $55.00 |
| THPL PVT MK line 4 | 78000200 | LF | 100 | 50 (50%) | $1.33 | $0.88 |
| Bit matls tack CT | 40600290 | LB | 109 | 48 (44%) | $0.10 | $0.01 |
| Mod ureth PM line 4 | 78009004 | LF | 98 | 44 (45%) | $3.05 | $1.69 |
| Temp info signing | Z0030850 | SF | 100 | 40 (40%) | $20.00 | $18.00 |
| Temp PVT MK L4 T4 tape | 70307120 | LF | 89 | 40 (45%) | $1.25 | $1.25 |
| Reg sub mon | 66901006 | CAL DAY | 72 | 39 (54%) | $700.00 | $820.00 |
| Soil disposal analy | 66900530 | EACH | 68 | 35 (51%) | $1,450.00 | $1,470.00 |
| THPL PVT MK line 6 | 78000400 | LF | 57 | 35 (61%) | $1.80 | $1.40 |
| HMA surf rem butt JT | 40600982 | SY | 74 | 34 (46%) | $22.00 | $16.50 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Lorig Construction Company | 123 | 75 of 123 |
| Martam Construction Incorporated | 88 | 62 of 88 |
| Rausch Infrastructure, LLC | 58 | 14 of 58 |
| Herlihy Mid-Continent Company | 57 | 32 of 57 |
| D. Construction, Inc. | 55 | 45 of 55 |
| MYS, Incorporated | 53 | 26 of 53 |
| Alliance Contractors, Inc. | 49 | 21 of 49 |
| ERA-Valdivia Contractors, Inc. | 26 | 9 of 26 |
| Dunnet Bay Construction Company | 23 | 15 of 23 |
| Copenhaver Construction, Inc. | 20 | 10 of 20 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 18 SEP 2026 | 80B49 | District 01 | Section (CIP-617) | 4 of 6 | $976,446 | +29% |
| 31 JUL 2026 | 62W20 | District 01 | Section FAI | 3 of 6 | $7,919,020 | +11% |
| 31 JUL 2026 | 62X43 | District 01 | Section 68B-1 | 2 of 4 | $321,880 | +11% |
| 31 JUL 2026 | 62Y20 | District 01 | Section 2025-1070-BDR,BJR | 3 of 5 | $1,462,965 | +18% |
| 12 JUN 2026 | 80B47 | District 01 | Section (267-1212.2-15D) | 1 of 2 | $641,982 | Low, 0.0% under the second |
| 12 JUN 2026 | 80B66 | District 01 | Section (3233-211-VB) | 2 of 4 | $457,975 | +15% |
| 12 JUN 2026 | 80C97 | District 01 | Section 2025-2134-I | 3 of 3 | $1,666,129 | +129% |
| 24 APR 2026 | 62Y30 | District 01 | Section (60B&C-NRM)BDR,BJR | 4 of 4 | $892,383 | +13% |
| 24 APR 2026 | 80B46 | District 01 | Section (99-5HB-3) | 2 of 4 | $626,330 | +7.0% |
| 24 APR 2026 | 80B48 | District 01 | Section (1010B-89) | 4 of 4 | $1,314,393 | +19% |
| 24 APR 2026 | 80B62 | District 01 | Section (0404.2-1B) | 3 of 3 | $1,682,524 | +16% |
| 27 FEB 2026 | 61M25 | District 01 | Project Number: H406-985 / /, section 16-11107-01-BR | 6 of 7 | $2,133,324 | +37% |
| 27 FEB 2026 | 62Y17 | District 01 | Section (551X-B)BDR,BJR | 5 of 6 | $1,567,874 | +23% |
| 27 FEB 2026 | 62Y26 | District 01 | Section (143VB-R-1(90))BR | 3 of 7 | $1,320,397 | +11% |
| 16 JAN 2026 | 62R76 | District 01 | Section FAI | 4 of 5 | $942,204 | +46% |
| 16 JAN 2026 | 62U12 | District 01 | Section FAI | 2 of 6 | $11,875,408 | +7.0% |
| 16 JAN 2026 | 62Y05 | District 01 | Section (111-BI)BDR,BJR | 3 of 4 | $892,051 | +20% |
| 16 JAN 2026 | 62Y14 | District 01 | Section (1976-165-WRS)BDR,BJR | 4 of 4 | $957,295 | +29% |
| 07 NOV 2025 | 62R63 | District 01 | 4 of 6 | $17,368,760 | +11% | |
| 19 SEP 2025 | 62Y12 | District 01 | Section (21B-NRM-4)BR | 4 of 5 | $1,269,133 | +33% |
| 19 SEP 2025 | 62Y13 | District 01 | Section (1293-BR)BDR,BJR | 2 of 6 | $975,645 | +1.0% |
| 01 AUG 2025 | 62W21 | District 01 | Section FAI | 6 of 6 | $2,322,805 | +30% |
| 13 JUN 2025 | 62T22 | District 01 | Section FAP | 2 of 6 | $1,754,826 | 0.0% |
| 13 JUN 2025 | 62U39 | District 01 | Section FAI | 2 of 2 | $5,767,097 | +8.0% |
| 13 JUN 2025 | 62X29 | District 01 | Section (T1-4)BR | 4 of 4 | $1,152,967 | +31% |
How this record was read
IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
- Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.