IDOT contract 62X29 bid tabulation

Section (T1-4)BR. Let by Illinois DOT on June 13, 2025, Cook, District 01. 4 bids received; low bid $882,083 by MYS, Incorporated.

Owner
Illinois DOT
Letting
13 JUN 2025
Pay items
62
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1MYS, Incorporated$882,083Low
2Martam Construction Incorporated$905,206+3.0%
3D. Construction, Inc.$994,953+13%
4Areatha Construction Co., Inc.$1,152,967+31%
IDOT contract 62X29: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. MYS, Incorporated2. Martam Construction Incorporated3. D. Construction, Inc.4. Areatha Construction Co., Inc.
1Clean reseal RLF JNT (X0326766)LF242$81.16$46.00$65.00$221.40
2PCC surf rem var DP (X4400100)SY290$2.20$48.00$20.00$29.00
3CC&G RMVL repl < = 10 (X4400501)LF20$125.73$165.00$95.00$1,250.15
4CC&G RMVL repl > 10FT (X4400503)LF30$89.17$145.00$80.00$1,370.25
5CLN BRDG scups/DNSPTS (X5230154)EACH14$671.71$700.00$660.00$705.85
6Class SI conc (misc) (X6060095)CY2.10$3,337.98$3,550.00$1,000.00$11,010
7Engrs FLD ofc TY A D1 (X6700407)CAL MO6$4,497.02$3,200.00$5,000.00$2,500.00
8Traf cont & prot SPL (X7010216)LS1$79,562$95,500$105,200$12,500
9Temp info signing (X7200061)SF116$16.79$28.00$30.00$30.00
10RRPM reflector removl (X7830050)EACH289$8.96$10.00$10.00$5.00
11RRPM reflector replac (X7830052)EACH289$20.15$25.00$14.30$10.00
12Appr slab repair (PD) (Z0001800)SY15.30$1,399.40$1,550.00$700.00$3,328.80
13STR rep con DP = < 5 (Z0012754)SF39$335.85$350.00$160.00$425.10
14Deck slab rep (part) (Z0016200)SY1.40$1,679.27$2,800.00$2,000.00$4,869.95
15Polymer concrete (Z0041895)CF63.60$1,063.55$1,150.00$1,000.00$1,320.80
16Tree remov 6-15 (20100110)UNIT29$113.88$81.00$3,245.00$125.00
17Earth excavation (20200100)CY25$98.76$126.00$100.00$340.40
18Bit matls tack CT (40600290)LB738$0.01$0.10$0.01$2.00
19Long joint sealant (40600370)LF455$44.47$44.00$23.52$28.00
20PCC surf rem butt JT (40600985)SY445$32.39$30.00$0.01$23.00
21HMA SC IL-9.5 D N70 (40604062)TON138$269.86$270.00$140.00$225.00
22Protective coat (42001300)SY17$4.05$20.00$2.00$77.45
23HMA surf rem 1 (44000153)SY1,021$14.90$15.00$5.25$21.00
24HMA surf rem 1 1/2 (44000155)SY296$26.36$28.00$15.00$30.00
25Sidewalk rem (44000600)SF100$2.85$3.00$7.75$38.45
26CL D patch T1 10 (44201761)SY50$246.55$248.00$111.00$250.00
27CL D patch T2 10 (44201765)SY50$243.57$218.00$111.00$250.00
28CL D patch T3 10 (44201769)SY50$243.57$218.00$111.00$250.00
29Conc rem (50102400)CY12$2,798.79$2,600.00$6,000.00$5,730.15
30Conc struct (50300225)CY15.90$2,798.79$3,600.00$6,000.00$5,709.85
31Protective coat (50300300)SY87$4.05$5.00$3.00$60.75
32Reinf bars, epoxy CTD (50800205)LB2,330$4.85$4.00$10.00$6.80
33Pref joint seal 1 (52000005)LF222$84.94$95.00$200.00$173.15
34Pref joint seal 2 (52000025)LF142$93.90$115.00$260.00$215.30
35Pref joint seal 2 1/2 (52000030)LF148$103.97$125.00$300.00$193.25
36Contr low-streng matl (59300100)CY7$900.73$320.00$400.00$3,745.40
37SPBGR TY A 6FT posts (63000001)LF50$34.87$75.00$70.52$30.00
38Traf bar term T2 (63100045)EACH2$1,500.16$2,200.00$2,021.43$1,900.00
39Traf bar term T6 (63100085)EACH6$5,016.56$4,400.00$4,169.26$4,300.00
40TR bar TRM T1 SPL tan (63100167)EACH2$3,706.72$4,300.00$4,008.25$4,000.00
41Guardrail remov (63200310)LF333$17.16$15.00$13.71$6.00
42Non SPL waste disposl (66900200)CY25$124.63$325.00$125.00$401.85
43Soil disposal analy (66900530)EACH2$1,880.79$1,500.00$1,925.00$1,680.00
44Reg sub P-const plan (66901001)LS1$3,806.37$3,500.00$2,475.00$3,400.00
45Reg sub F con report (66901003)LS1$559.75$1,500.00$2,475.00$500.00
46Reg sub mon (66901006)CAL DAY40$783.66$1.00$1,000.00$700.00
47Mobilization (67100100)LS1$49,356$54,000$49,502$69,100
48Pavt MK blkout tape 4 (70107004)LF9,340$2.80$2.00$0.01$1.85
49Changeable message SN (70107025)CAL DAY240$33.58$45.00$45.00$30.00
50SHRT TRM pavt MK rem (70300150)SF10,540$0.54$1.00$0.01$1.25
51Temp PVT MK line 4 - paint (70300221)LF2,142$0.39$0.50$0.01$0.40
52Temp PVT MK L4 T4 tape (70307120)LF22,270$1.34$1.50$0.01$1.45
53Temp conc barrier (70400100)LF1,512.50$33.58$32.00$25.00$54.20
54Rel temp conc barrier (70400200)LF687.50$12.31$10.00$16.00$12.60
55Imp attn temp FRN TL3 (70600260)EACH4$6,057.72$8,600.00$8,500.00$5,500.00
56Imp attn rel FRD TL3 (70600330)EACH2$2,816.70$4,000.00$2,500.00$2,500.00
57Terminal marker - DA (72501000)EACH2$39.18$50.00$46.35$50.00
58THPL PVT MK line 4 (78000200)LF1,814$5.60$4.60$1.38$1.25
59Mod ureth PM line 4 (78009004)LF327$33.58$25.00$6.05$5.50
60Raised refl pavt MKR (78100100)EACH20$503.78$420.00$88.00$80.00
61Raised ref PVT MK rem (78300200)EACH20$45.00$25.00$10.00$25.00
62PVT MKG rem WTR blast (78300202)SF1,440$3.92$4.00$2.20$2.00
IDOT contract 62X29: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of June 13, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy