IDOT contract 80B66 bid tabulation
Section (3233-211-VB). Let by Illinois DOT on June 12, 2026, Cook, District 01. 4 bids received; low bid $397,833 by Lorig Construction Company.
- Owner
- Illinois DOT
- Letting
- 12 JUN 2026
- Pay items
- 7
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Lorig Construction Company | $397,833 | Low |
| 2 | Areatha Construction Co., Inc. | $457,975 | +15% |
| 3 | Acura Inc. | $498,576 | +25% |
| 4 | Martam Construction Incorporated | $588,491 | +48% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Lorig Construction Company | 2. Areatha Construction Co., Inc. | 3. Acura Inc. | 4. Martam Construction Incorporated |
|---|---|---|---|---|---|---|---|
| 1 | Protec shield perm (X5017305) | SY | 2,737 | $100.00 | $121.55 | $70.00 | $127.00 |
| 2 | Rem EX protec shield (X5017311) | SY | 109 | $80.00 | $99.05 | $40.00 | $112.00 |
| 3 | Engrs FLD ofc TY A D1 (X6700407) | CAL MO | 12 | $2,500.00 | $3,000.00 | $4,000.00 | $4,800.00 |
| 4 | TR C-prot expressways (X7011015) | LS | 1 | $63,000 | $45,000 | $200,000 | $126,000 |
| 5 | Temp info signing (X7200061) | SF | 154.20 | $15.00 | $15.00 | $30.00 | $20.00 |
| 6 | Mobilization (67100100) | LS | 1 | $20,000 | $27,440 | $30,000 | $34,000 |
| 7 | Night work zone light (70200100) | LS | 1 | $100.00 | $3,742.75 | $20,000 | $8,000.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of June 12, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.