Acura Inc.: IDOT bid record

Acura Inc. submitted 84 bids on Illinois DOT contracts in the data, from 15 JAN 2021 to 31 JUL 2026, and was the low bidder on 8 of them (10%). When it was not low, its total sat a median +18% above the low bid.

Owner
Illinois DOT
Low bid volume
$15,902,200
Latest bid
31 JUL 2026
Data through
18 SEP 2026
84Bids
8Low bids
10Win rate, percent
+18%Median gap to the low bid when not low, 75 bids

By year

YearBidsLow bidsWin rate
20211000%
202212217%
20231200%
202419526%
20251800%
20261318%
Acura Inc., IDOT: bids and low bids by year of letting

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Trainees TPGZ0076604HR5151 (100%)$15.00$15.00
TraineesZ0076600HR4545 (100%)$0.80$0.80
Bit matls tack CT40600290LB5430 (56%)$0.01$0.01
Earth excavation20200100CY7024 (34%)$45.00$48.00
THPL PVT MK line 2478000650LF6221 (34%)$7.25$6.00
SHRT TRM pavt MK rem70300150SF4021 (53%)$1.00$1.20
Ped SH LED 1F BM CDT88102717EACH3421 (62%)$687.00$724.00
THPL PVT MK line 1278000600LF6120 (33%)$3.80$3.10
Remov EX TS equip89502375EACH3520 (57%)$2,800.00$2,720.00
Conc FDN TY A87800100LF2820 (71%)$326.40$350.00
Agg subgrade improve30300001CY4719 (40%)$40.00$55.00
Undrgrd C galvs 281028200LF4719 (40%)$40.00$38.08
Acura Inc., IDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Acura Inc., IDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
31 JUL 202661K19District 01Elk Grove Village, section 22-00078-00-RS3 of 4$1,674,517+5.0%
12 JUN 202680B28District 01Section 2025-2009-RS5 of 5$4,626,241+18%
12 JUN 202680B66District 01Section (3233-211-VB)3 of 4$498,576+25%
12 JUN 202680D00District 01Section 2025-2137-RS,SW3 of 3$2,958,849+27%
12 JUN 202680D46District 01Section 2026-2181-C,HBK3 of 7$1,260,823+16%
24 APR 202661M35District 01Harvard, section 21-00067-00-SW2 of 5$333,3410.0%
24 APR 202662X44District 01Section 2024-1009-BDS4 of 4$1,818,433+296%
24 APR 202680B05District 01Section 2025-2018-RS,SW5 of 5$1,890,295+32%
24 APR 202680B20District 01Section 2025-1094-RS3 of 4$2,436,086+35%
16 JAN 202661K16District 01Franklin Park, section 17-00083-02-PV3 of 10$3,887,541+1.0%
16 JAN 202661L36District 01Downers Grove, section 23-00121-00-CH1 of 10$2,105,861Low, 2.0% under the second
16 JAN 202662P93District 01Section 2021-172-SW3 of 5$3,100,313+18%
16 JAN 202662W47District 01Section 2023-925-N-TS(L)2 of 4$3,998,919+4.0%
07 NOV 202561K01District 01Elmhurst, section 17-00188-00-SW2 of 7$2,669,368+1.0%
07 NOV 202561L77District 01Hanover Park, section 23-00079-00-SW3 of 9$429,697+19%
07 NOV 202561L92District 01Lincolnwood, section 16-00061-00-LS2 of 5$5,488,0480.0%
07 NOV 202561L98District 01Mount Prospect, section 23-00179-00-RS5 of 6$2,082,267+17%
19 SEP 202561K93District 01Elk Grove Village, section 20-00073-01-PV6 of 7$16,097,435+28%
19 SEP 202561L70District 01Barrington, section 24-00093-00-SW8 of 10$333,180+51%
19 SEP 202561L74District 01Hampshire, section 24-00021-00-SW7 of 8$658,433+86%
01 AUG 202561K77District 01Wood Dale, section 22-00055-00-BT3 of 8$569,722+3.0%
01 AUG 202561L37District 01Schaumburg, section 22-00142-01-PV9 of 9$6,437,050+12%
01 AUG 202561L46District 01Hanover Park, section 19-00070-00-BT5 of 7$1,615,000+13%
01 AUG 202562V91District 01Section FAI3 of 4$1,247,866+26%
13 JUN 202561J86District 01Round Lake Beach, section 17-00080-00-PV5 of 5$6,505,854+48%
Acura Inc.: latest IDOT bids in the data

How this record was read

IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

  • Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy