IDOT contract 61L98 bid tabulation
Mount Prospect, section 23-00179-00-RS. Let by Illinois DOT on November 7, 2025, Cook, District 01. 6 bids received; low bid $1,778,510 by PirTano Construction Co., LLC.
- Owner
- Illinois DOT
- Letting
- 07 NOV 2025
- Pay items
- 158
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | PirTano Construction Co., LLC | $1,778,510 | Low |
| 2 | D'Land Construction, LLC | $1,780,597 | 0.0% |
| 3 | Everlast Blacktop Inc. | $1,862,312 | +5.0% |
| 4 | Alliance Contractors, Inc. | $1,928,410 | +8.0% |
| 5 | Acura Inc. | $2,082,267 | +17% |
| 6 | Plote Construction, Inc. | $2,102,831 | +18% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. PirTano Construction Co., LLC | 2. D'Land Construction, LLC | 3. Everlast Blacktop Inc. | 4. Alliance Contractors, Inc. | 5. Acura Inc. | 6. Plote Construction, Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 1 | T-celtis occid 2-1/2 (A2002920) | EACH | 1 | $600.00 | $770.00 | $770.00 | $600.00 | $516.00 | $700.00 |
| 2 | T-ginkgo biloba 2-1/2 (A2004420) | EACH | 1 | $1,000.00 | $990.00 | $940.00 | $1,000.00 | $607.00 | $900.00 |
| 3 | T-gymnocla dio 2-1/2 (A2005020) | EACH | 1 | $600.00 | $660.00 | $800.00 | $600.00 | $644.00 | $600.00 |
| 4 | T-amelan laev TF 2" (B2000777) | EACH | 2 | $500.00 | $825.00 | $900.00 | $500.00 | $469.00 | $750.00 |
| 5 | T-cornus alt CL 4' (B2001262) | EACH | 2 | $325.00 | $363.00 | $420.00 | $325.00 | $174.00 | $330.00 |
| 6 | T-crat cru-I TF 2 (B2001616) | EACH | 1 | $500.00 | $660.00 | $700.00 | $500.00 | $478.00 | $600.00 |
| 7 | Prun safety/equip CLR (K1004595) | LS | 1 | $1,500.00 | $1,750.00 | $7,000.00 | $1,500.00 | $1,000.00 | $6,500.00 |
| 8 | Shred bark mulch 4 (K1005482) | SY | 544 | $9.00 | $11.00 | $12.00 | $8.50 | $13.00 | $10.00 |
| 9 | Rod and clean EX cond (X0324599) | LF | 2,387 | $2.00 | $2.44 | $0.30 | $2.22 | $2.22 | $0.20 |
| 10 | Washout basin (X0326806) | LS | 1 | $2,000.00 | $22,500 | $2,000.00 | $1,500.00 | $5,000.00 | $5,902.52 |
| 11 | Ped signal post 10 FT (X1400367) | EACH | 3 | $1,506.00 | $2,656.23 | $1,850.00 | $1,505.66 | $1,505.66 | $1,696.00 |
| 12 | Ped signal post 5 FT (X1400378) | EACH | 3 | $1,262.00 | $2,388.10 | $1,550.00 | $1,261.91 | $1,261.91 | $1,472.00 |
| 13 | Perimeter eros bar SP (X2800400) | LF | 300 | $7.00 | $6.00 | $9.00 | $7.00 | $5.00 | $8.00 |
| 14 | Inlet protection SPL (X2800500) | EACH | 1 | $400.00 | $350.00 | $1,100.00 | $1,000.00 | $166.00 | $200.00 |
| 15 | Temp access- priv ent (X4021000) | EACH | 2 | $858.00 | $500.00 | $200.00 | $1.00 | $750.00 | $3,300.00 |
| 16 | Temp access- road (X4023000) | EACH | 1 | $1,499.00 | $750.00 | $800.00 | $1.00 | $1,500.00 | $3,400.00 |
| 17 | HMA driveway pavt 8 (X4060290) | SY | 126 | $163.00 | $185.00 | $65.00 | $150.00 | $150.00 | $160.00 |
| 18 | Detectable warn SPL (X4240800) | SF | 42 | $66.00 | $55.00 | $69.00 | $60.00 | $60.00 | $30.56 |
| 19 | CC&G RMVL repl < = 10 (X4400501) | LF | 100 | $105.00 | $58.00 | $80.00 | $84.00 | $120.00 | $105.00 |
| 20 | CC&G RMVL repl > 10FT (X4400503) | LF | 167 | $104.00 | $46.00 | $72.00 | $84.00 | $90.00 | $99.00 |
| 21 | Remov EX flar end sec (X5427602) | EACH | 2 | $523.00 | $300.00 | $800.00 | $250.00 | $500.00 | $330.00 |
| 22 | SS cleaned 10 (X5537700) | LF | 54 | $6.00 | $2.20 | $9.00 | $8.00 | $10.00 | $2.00 |
| 23 | SS cleaned 24 (X5538200) | LF | 431 | $8.00 | $3.30 | $15.00 | $15.00 | $10.00 | $3.00 |
| 24 | SS cleaned 30 (X5538400) | LF | 59 | $8.00 | $4.40 | $22.00 | $20.00 | $20.00 | $4.00 |
| 25 | Manhole special (X6020084) | EACH | 2 | $5,989.00 | $8,000.00 | $4,000.00 | $10,000 | $7,500.00 | $6,500.00 |
| 26 | CH LK fence rem & RE (X6640304) | LF | 20 | $90.00 | $100.00 | $185.00 | $165.00 | $200.00 | $165.00 |
| 27 | Engrs FLD ofc TY A D1 (X6700407) | CAL MO | 7 | $3,000.00 | $5,500.00 | $3,200.00 | $500.00 | $4,000.00 | $4,000.00 |
| 28 | Traf cont & prot SPL (X7010216) | LS | 1 | $108,000 | $73,500 | $82,000 | $40,000 | $172,000 | $203,900 |
| 29 | Temp info signing (X7200061) | SF | 45 | $30.00 | $16.50 | $28.00 | $15.00 | $30.00 | $15.00 |
| 30 | Detour signing (X7200203) | LS | 1 | $2,500.00 | $10,450 | $12,000 | $9,500.00 | $2,500.00 | $9,500.00 |
| 31 | RRPM reflector removl (X7830050) | EACH | 18 | $5.00 | $6.60 | $20.00 | $6.00 | $50.00 | $20.00 |
| 32 | RRPM reflector replac (X7830052) | EACH | 18 | $30.00 | $22.00 | $20.00 | $20.00 | $50.00 | $42.00 |
| 33 | Accessible ped signal (X8760200) | EACH | 6 | $1,152.00 | $1,267.26 | $1,550.00 | $1,152.05 | $1,152.05 | $1,445.00 |
| 34 | Conc FDN TY A 12D (X8780012) | LF | 24 | $297.00 | $326.92 | $490.00 | $297.20 | $297.20 | $434.80 |
| 35 | Temp TR signal timing (X8900104) | EACH | 6 | $303.00 | $332.75 | $1,700.00 | $302.50 | $302.50 | $1,520.00 |
| 36 | Construction layout (Z0013798) | LS | 1 | $13,900 | $8,600.00 | $16,000 | $13,900 | $75,000 | $45,500 |
| 37 | Drainage STR cleaned (Z0018500) | EACH | 3 | $250.00 | $1,584.00 | $1,700.00 | $550.00 | $750.00 | $1,440.00 |
| 38 | RE-optimize TR sig sys 1 (Z0033044) | EACH | 1 | $660.00 | $726.00 | $1,900.00 | $660.00 | $660.00 | $1,740.00 |
| 39 | Temp pavemt var depth (Z0062458) | TON | 7 | $533.00 | $145.00 | $1,000.00 | $500.00 | $300.00 | $875.00 |
| 40 | Undr connect to STR (Z0076870) | EACH | 11 | $748.00 | $350.00 | $800.00 | $250.00 | $750.00 | $340.00 |
| 41 | Tree remov 6-15 (20100110) | UNIT | 84 | $30.00 | $36.50 | $33.00 | $33.00 | $35.00 | $30.00 |
| 42 | Tree remov acres (20100500) | ACRE | 0.25 | $15,000 | $36,300 | $53,000 | $33,000 | $20,000 | $48,000 |
| 43 | Tree trunk protection (20101100) | EACH | 6 | $150.00 | $165.00 | $200.00 | $150.00 | $150.00 | $150.00 |
| 44 | Tree root pruning (20101200) | EACH | 6 | $124.00 | $121.00 | $200.00 | $110.00 | $124.00 | $125.00 |
| 45 | Tree prun 1-10 (20101300) | EACH | 2 | $75.00 | $66.00 | $200.00 | $60.00 | $150.00 | $100.00 |
| 46 | Tree prun over 10 (20101350) | EACH | 4 | $125.00 | $193.00 | $240.00 | $175.00 | $250.00 | $200.00 |
| 47 | Supple watering (20101700) | UNIT | 0.70 | $500.00 | $1.10 | $1.00 | $500.00 | $100.00 | $1.00 |
| 48 | Earth excavation (20200100) | CY | 720 | $59.00 | $35.00 | $45.00 | $20.00 | $45.00 | $72.00 |
| 49 | Rem & disp uns matl (20201200) | CY | 1,225 | $40.00 | $45.00 | $45.00 | $20.00 | $55.00 | $45.00 |
| 50 | Trench backfill (20800150) | CY | 36 | $83.00 | $65.00 | $120.00 | $100.00 | $60.00 | $120.00 |
| 51 | Porous gran backfill (20900110) | CY | 14 | $205.00 | $95.00 | $65.00 | $100.00 | $60.00 | $50.00 |
| 52 | Geotech fab F/GR stab (21001000) | SY | 2,030 | $2.00 | $4.00 | $2.00 | $1.00 | $4.50 | $4.00 |
| 53 | Topsoil exc & plac (21101505) | CY | 480 | $40.00 | $25.00 | $24.00 | $10.00 | $15.00 | $79.00 |
| 54 | Explor trench 72 (21301072) | LF | 10 | $38.00 | $95.00 | $80.00 | $100.00 | $150.00 | $75.00 |
| 55 | Seeding CL 2A (25000210) | ACRE | 0.75 | $7,260.00 | $3,850.00 | $4,500.00 | $7,260.00 | $3,787.00 | $3,500.00 |
| 56 | Nitrogen fert nutr (25000400) | LB | 68 | $1.00 | $3.30 | $4.00 | $1.00 | $3.00 | $3.00 |
| 57 | Potassium fert nutr (25000600) | LB | 68 | $1.00 | $3.30 | $4.00 | $1.00 | $3.00 | $3.00 |
| 58 | Mulch method 2 (25100115) | ACRE | 0.75 | $4,000.00 | $4,400.00 | $4,500.00 | $4,000.00 | $2,100.00 | $4,000.00 |
| 59 | Wildlife friendly ecb (25100645) | SY | 3,460 | $2.00 | $1.90 | $2.20 | $1.75 | $2.20 | $1.70 |
| 60 | Supple watering (25200200) | UNIT | 0.60 | $500.00 | $1.10 | $2.00 | $500.00 | $100.00 | $1.00 |
| 61 | Temp eros contr seed (28000250) | LB | 75 | $1.00 | $1.10 | $2.00 | $1.00 | $4.00 | $1.00 |
| 62 | Temp ditch checks (28000305) | LF | 30 | $15.00 | $11.00 | $15.00 | $15.00 | $4.90 | $10.00 |
| 63 | Perimeter eros bar (28000400) | LF | 3,305 | $3.00 | $4.00 | $2.70 | $2.85 | $2.40 | $2.50 |
| 64 | Inlet & pipe protect (28000500) | EACH | 1 | $500.00 | $250.00 | $330.00 | $250.00 | $76.00 | $200.00 |
| 65 | Inlet filters (28000510) | EACH | 27 | $225.00 | $200.00 | $210.00 | $50.00 | $230.00 | $200.00 |
| 66 | Agg subgrade improve (30300001) | CY | 853 | $127.00 | $75.00 | $68.00 | $70.00 | $45.00 | $70.00 |
| 67 | Sub gran mat B 4 (31101200) | SY | 1,150 | $16.00 | $7.00 | $6.50 | $7.00 | $12.00 | $17.00 |
| 68 | Aggregate-temp access (40201000) | TON | 40 | $48.00 | $45.00 | $38.00 | $40.00 | $50.00 | $125.00 |
| 69 | Bit matls PR CT (40600275) | LB | 18,233 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 70 | Bit matls tack CT (40600290) | LB | 1,990 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 71 | Long joint sealant (40600370) | LF | 3,803 | $5.00 | $4.25 | $3.20 | $5.00 | $5.00 | $5.40 |
| 72 | Mix CR JTS flangewys (40600400) | TON | 20 | $650.00 | $395.00 | $300.00 | $650.00 | $650.00 | $500.00 |
| 73 | HMA surf rem butt JT (40600982) | SY | 145 | $30.00 | $15.00 | $32.00 | $30.00 | $30.00 | $31.00 |
| 74 | HMA BC IL-19.0 N50 (40603080) | TON | 1,589 | $95.00 | $108.25 | $105.00 | $95.00 | $95.00 | $110.00 |
| 75 | HMA SC IL-9.5 D N50 (40604060) | TON | 1,164 | $98.00 | $109.00 | $120.20 | $98.00 | $98.00 | $100.00 |
| 76 | HMA SC IL-9.5 D N70 (40604062) | TON | 47 | $240.00 | $111.00 | $160.00 | $240.00 | $240.00 | $135.00 |
| 77 | PC conc sidewalk 5 (42400200) | SF | 10,349 | $9.00 | $10.00 | $10.20 | $9.00 | $12.00 | $9.50 |
| 78 | Detectable warnings (42400800) | SF | 75 | $37.00 | $35.00 | $52.00 | $40.00 | $36.00 | $21.65 |
| 79 | Pavement rem (44000100) | SY | 8,104 | $10.00 | $8.00 | $14.00 | $40.00 | $15.00 | $11.00 |
| 80 | HMA surf rem 2 (44000157) | SY | 419 | $25.00 | $13.00 | $16.00 | $25.00 | $25.00 | $15.00 |
| 81 | HMA surf rem 3 (44000161) | SY | 1,245 | $11.00 | $15.00 | $12.00 | $11.00 | $11.00 | $15.00 |
| 82 | Drive pavement rem (44000200) | SY | 126 | $11.00 | $45.00 | $16.00 | $30.00 | $15.00 | $30.00 |
| 83 | Comb curb gutter rem (44000500) | LF | 2,195 | $6.00 | $9.00 | $8.90 | $30.00 | $10.00 | $9.00 |
| 84 | Sidewalk rem (44000600) | SF | 401 | $2.00 | $5.00 | $2.00 | $3.00 | $4.00 | $3.70 |
| 85 | CL D patch T4 15 (44201833) | SY | 202 | $300.00 | $250.00 | $150.00 | $300.00 | $300.00 | $185.00 |
| 86 | Seg conc block wall (52200800) | SF | 462 | $92.00 | $105.00 | $91.00 | $65.75 | $120.00 | $70.00 |
| 87 | PRC flar end sec 18 (54213663) | EACH | 2 | $2,544.00 | $4,241.00 | $2,600.00 | $1,000.00 | $2,000.00 | $2,500.00 |
| 88 | Storm sew CL A 1 12 (550A0050) | LF | 77 | $143.00 | $103.00 | $65.00 | $175.00 | $105.00 | $110.00 |
| 89 | Storm sew CL A 1 18 (550A0090) | LF | 28 | $224.00 | $202.00 | $91.00 | $225.00 | $120.00 | $118.00 |
| 90 | Storm sew CL A 2 15 (550A0360) | LF | 4 | $157.00 | $424.00 | $240.00 | $200.00 | $250.00 | $750.00 |
| 91 | Storm sew CL A 2 24 (550A0410) | LF | 16 | $300.00 | $223.00 | $166.00 | $250.00 | $150.00 | $165.00 |
| 92 | Storm sew CL A 2 36 (550A0450) | LF | 8 | $232.00 | $400.00 | $185.00 | $300.00 | $300.00 | $215.00 |
| 93 | Storm sewer rem 8 (55100300) | LF | 28 | $10.00 | $25.00 | $28.00 | $10.00 | $10.00 | $24.00 |
| 94 | Storm sewer rem 15 (55100700) | LF | 7 | $10.00 | $35.00 | $51.00 | $10.00 | $15.00 | $52.00 |
| 95 | Storm sewer rem 18 (55100900) | LF | 32 | $10.00 | $45.00 | $69.00 | $10.00 | $15.00 | $68.00 |
| 96 | Storm sewer rem 24 (55101200) | LF | 26 | $10.00 | $55.00 | $70.00 | $10.00 | $20.00 | $66.00 |
| 97 | Storm sewer rem 36 (55101600) | LF | 8 | $10.00 | $65.00 | $700.00 | $10.00 | $30.00 | $658.00 |
| 98 | Pipe underdr T 2 4 (60108204) | LF | 3,769 | $12.00 | $25.00 | $18.00 | $30.00 | $45.00 | $36.00 |
| 99 | P undr for struct 4 (60146304) | LF | 119 | $36.00 | $56.00 | $32.00 | $30.00 | $60.00 | $44.00 |
| 100 | CB TA 4 dia T1F OL (60200105) | EACH | 2 | $4,559.00 | $6,070.00 | $2,900.00 | $8,000.00 | $4,500.00 | $4,500.00 |
| 101 | CB TA 4 dia T8G (60200805) | EACH | 1 | $4,408.00 | $4,300.00 | $2,800.00 | $8,000.00 | $5,000.00 | $4,250.00 |
| 102 | Man TA 4 dia T1F CL (60218400) | EACH | 2 | $4,620.00 | $7,112.00 | $3,500.00 | $8,000.00 | $5,500.00 | $3,250.00 |
| 103 | Inlets TA T1F OL (60234200) | EACH | 2 | $2,126.00 | $4,475.00 | $1,800.00 | $4,500.00 | $2,500.00 | $2,500.00 |
| 104 | FR & grates adjust (60300105) | EACH | 9 | $1,367.00 | $650.00 | $600.00 | $250.00 | $900.00 | $700.00 |
| 105 | FR & lids adjust (60300305) | EACH | 1 | $3,142.00 | $650.00 | $600.00 | $250.00 | $900.00 | $700.00 |
| 106 | Comb CC&G TB6.12 (60603800) | LF | 2,100 | $35.00 | $36.00 | $38.00 | $36.00 | $35.00 | $51.00 |
| 107 | Comb CC&G TY B-6.24 (60605000) | LF | 724 | $45.00 | $45.00 | $44.00 | $54.00 | $45.00 | $65.00 |
| 108 | Pipe culv cleaned 18 (60920018) | LF | 140 | $6.00 | $1.10 | $30.00 | $18.00 | $15.00 | $15.00 |
| 109 | Non SPL waste disposl (66900200) | CY | 145 | $95.00 | $105.00 | $100.00 | $90.00 | $95.00 | $125.00 |
| 110 | Soil disposal analy (66900530) | EACH | 5 | $700.00 | $880.00 | $1,400.00 | $1,250.00 | $2,500.00 | $1,650.00 |
| 111 | Reg sub P-const plan (66901001) | LS | 1 | $6,500.00 | $7,150.00 | $4,200.00 | $3,800.00 | $10,000 | $3,950.00 |
| 112 | Reg sub F con report (66901003) | LS | 1 | $500.00 | $550.00 | $1,200.00 | $900.00 | $1,000.00 | $1,000.00 |
| 113 | Reg sub mon (66901006) | CAL DAY | 13 | $700.00 | $770.00 | $1,100.00 | $1,900.00 | $1,000.00 | $700.00 |
| 114 | Mobilization (67100100) | LS | 1 | $106,000 | $102,350 | $110,000 | $89,553 | $123,400 | $126,300 |
| 115 | TR cont surveillance (70103815) | CAL DAY | 63 | $250.00 | $247.50 | $55.00 | $225.00 | $250.00 | $225.00 |
| 116 | Changeable message SN (70107025) | CAL DAY | 196 | $30.00 | $27.50 | $110.00 | $25.00 | $30.00 | $25.00 |
| 117 | Short term pavt mking (70300100) | LF | 14,960 | $0.39 | $0.25 | $1.00 | $1.00 | $1.00 | $0.01 |
| 118 | SHRT TRM pavt MK rem (70300150) | SF | 3,208 | $0.39 | $0.50 | $1.00 | $0.45 | $0.50 | $2.00 |
| 119 | Temp PVT MK line 4 - paint (70300221) | LF | 15,616 | $1.00 | $0.39 | $1.10 | $0.35 | $0.35 | $0.35 |
| 120 | Temp PVT MK line 6 - paint (70300241) | LF | 263 | $1.00 | $0.44 | $1.70 | $0.40 | $2.00 | $0.40 |
| 121 | Temp PVT MK line 24 - paint (70300281) | LF | 186 | $3.00 | $1.37 | $6.60 | $1.25 | $2.50 | $1.25 |
| 122 | Temp PVT MK L4 T4 tape (70307120) | LF | 1,885 | $1.00 | $1.35 | $2.50 | $1.20 | $1.32 | $1.20 |
| 123 | Temp PVT MK L12 T4 tape (70307160) | LF | 60 | $4.00 | $4.00 | $8.00 | $3.60 | $4.00 | $3.60 |
| 124 | Temp PVT MK L24 T4 tape (70307210) | LF | 13 | $15.00 | $8.00 | $18.00 | $7.20 | $15.00 | $7.20 |
| 125 | Temp conc barrier (70400100) | LF | 288 | $62.00 | $38.50 | $28.00 | $85.00 | $35.00 | $35.00 |
| 126 | Imp attn temp NRN TL3 (70600251) | EACH | 1 | $3,500.00 | $4,350.00 | $4,000.00 | $3,500.00 | $3,500.00 | $3,500.00 |
| 127 | Imp attn temp FRN TL3 (70600260) | EACH | 1 | $4,690.00 | $5,659.00 | $5,500.00 | $4,690.00 | $5,000.00 | $4,690.00 |
| 128 | Sign panel T1 (72000100) | SF | 64 | $35.00 | $27.50 | $33.00 | $25.00 | $35.00 | $25.00 |
| 129 | Remov sign panel T1 (72400310) | SF | 17 | $111.00 | $11.00 | $12.00 | $10.00 | $110.78 | $10.00 |
| 130 | Reloc sin pan assy TA (72400500) | EACH | 1 | $450.00 | $137.50 | $170.00 | $125.00 | $450.00 | $125.00 |
| 131 | Reloc sin pan assy TB (72400600) | EACH | 2 | $500.00 | $165.00 | $270.00 | $150.00 | $500.00 | $150.00 |
| 132 | Reloc sign panel T1 (72400710) | SF | 6 | $35.00 | $20.00 | $125.00 | $18.00 | $35.00 | $18.00 |
| 133 | Metal post TY A (72900100) | LF | 96 | $16.00 | $16.50 | $21.00 | $15.00 | $16.00 | $15.00 |
| 134 | Metal post TY B (72900200) | LF | 248 | $18.00 | $17.60 | $21.00 | $16.00 | $18.00 | $16.00 |
| 135 | THPL PVT MK LTR & sym (78000100) | SF | 276 | $6.00 | $6.32 | $6.20 | $7.50 | $5.00 | $7.50 |
| 136 | THPL PVT MK line 4 (78000200) | LF | 7,763 | $1.00 | $0.88 | $1.00 | $0.79 | $0.83 | $0.79 |
| 137 | THPL PVT MK line 6 (78000400) | LF | 1,178 | $1.00 | $1.05 | $1.75 | $1.18 | $1.35 | $1.18 |
| 138 | THPL PVT MK line 12 (78000600) | LF | 640 | $3.00 | $3.20 | $3.10 | $3.75 | $2.70 | $3.75 |
| 139 | THPL PVT MK line 24 (78000650) | LF | 159 | $6.00 | $6.32 | $6.60 | $7.50 | $5.50 | $7.50 |
| 140 | Raised refl pavt MKR (78100100) | EACH | 11 | $25.00 | $500.00 | $525.00 | $105.00 | $400.00 | $105.00 |
| 141 | Raised ref PVT MK rem (78300200) | EACH | 11 | $5.00 | $50.00 | $70.00 | $50.00 | $50.00 | $110.00 |
| 142 | PVT MKG rem grinding (78300201) | SF | 3,722 | $0.65 | $0.22 | $2.80 | $0.20 | $0.68 | $0.20 |
| 143 | PVT MKG rem WTR blast (78300202) | SF | 7,049 | $1.40 | $0.33 | $4.00 | $0.30 | $1.40 | $0.30 |
| 144 | Undrgrd C galvs 2 (81028200) | LF | 249 | $45.00 | $49.62 | $42.00 | $45.11 | $45.11 | $39.60 |
| 145 | HD handhole (81400200) | EACH | 1 | $4,517.00 | $4,968.80 | $4,600.00 | $4,517.09 | $4,517.09 | $4,203.00 |
| 146 | Main EX TR sig instal (85000200) | EACH | 2 | $8,361.00 | $9,196.55 | $13,500 | $8,360.50 | $8,360.50 | $12,200 |
| 147 | Elcbl C signal 14 2C (87301215) | LF | 1,195 | $3.00 | $2.94 | $3.50 | $2.67 | $2.67 | $3.20 |
| 148 | Elcbl C signal 14 3C (87301225) | LF | 1,220 | $3.00 | $3.17 | $4.00 | $2.88 | $2.88 | $3.70 |
| 149 | Elcbl C lead 14 1PR (87301305) | LF | 2,225 | $3.00 | $3.15 | $4.00 | $2.86 | $2.86 | $3.70 |
| 150 | Elcbl C egrdc 6 1C (87301900) | LF | 289 | $7.00 | $7.49 | $4.75 | $6.81 | $6.81 | $4.30 |
| 151 | Drill EX handhole (87900200) | EACH | 7 | $476.00 | $523.23 | $1,200.00 | $475.66 | $475.66 | $1,097.00 |
| 152 | Ped SH LED 1F BM CDT (88102717) | EACH | 6 | $773.00 | $850.48 | $690.00 | $773.16 | $773.16 | $634.00 |
| 153 | Inductive loop detect (88500100) | EACH | 4 | $175.00 | $192.50 | $230.00 | $175.00 | $175.00 | $204.00 |
| 154 | Det loop T1 (88600100) | LF | 556 | $33.00 | $36.20 | $45.00 | $32.91 | $32.91 | $41.40 |
| 155 | Mod EX contr (89502200) | EACH | 2 | $994.00 | $1,093.85 | $2,250.00 | $994.41 | $994.41 | $2,015.00 |
| 156 | Rem elcbl FR con (89502300) | LF | 4,110 | $1.00 | $1.22 | $1.00 | $1.11 | $1.11 | $0.70 |
| 157 | Remov EX TS equip (89502375) | EACH | 1 | $889.00 | $977.69 | $3,000.00 | $888.81 | $888.81 | $2,880.00 |
| 158 | Rebuild EX handhole (89502376) | EACH | 5 | $2,715.00 | $2,986.65 | $4,250.00 | $2,715.13 | $2,715.13 | $3,973.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of November 7, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.