Plote Construction, Inc.: IDOT bid record

Plote Construction, Inc. submitted 265 bids on Illinois DOT contracts in the data, from 15 JAN 2021 to 18 SEP 2026, and was the low bidder on 62 of them (23%). When it was not low, its total sat a median +10% above the low bid.

Owner
Illinois DOT
Low bid volume
$451,351,138
Latest bid
18 SEP 2026
Data through
18 SEP 2026
265Bids
62Low bids
23Win rate, percent
+10%Median gap to the low bid when not low, 203 bids

By year

YearBidsLow bidsWin rate
2021511020%
2022381026%
2023391333%
202435823%
2025481531%
202654611%
Plote Construction, Inc., IDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 012525923%
District 03800%
District 023133%
District 0922100%
Plote Construction, Inc., IDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Bit matls tack CT40600290LB249223 (90%)$0.01$0.01
Trainees TPGZ0076604HR181181 (100%)$15.00$15.00
TraineesZ0076600HR177177 (100%)$0.80$0.80
THPL PVT MK line 2478000650LF222144 (65%)$5.00$6.00
THPL PVT MK LTR & sym78000100SF218141 (65%)$5.00$5.75
THPL PVT MK line 478000200LF231138 (60%)$0.75$0.88
THPL PVT MK line 1278000600LF215133 (62%)$2.50$3.10
THPL PVT MK line 678000400LF222130 (59%)$1.12$1.40
Raised refl pavt MKR78100100EACH168109 (65%)$36.25$48.00
Temp info signingZ0030850SF163105 (64%)$15.00$18.00
Main EX TR sig instal85000200EACH13293 (70%)$2,121.07$2,600.00
Sodding salt tolerant25200110SY16882 (49%)$14.75$18.00
Plote Construction, Inc., IDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Plote Construction, Inc., IDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
18 SEP 202662L58District 01Section 2020-080-RS&SW4 of 4$4,698,972+11%
18 SEP 202662V85District 01Section FAP3 of 3$9,751,187+20%
18 SEP 202662V90District 01Section FAU3 of 4$3,177,671+8.0%
18 SEP 202662W73District 01Section 2024-951-RS,SW3 of 3$5,408,187+15%
31 JUL 202661K19District 01Elk Grove Village, section 22-00078-00-RS2 of 4$1,638,000+3.0%
31 JUL 202661K67District 01Aurora, section 23-00367-00-RS3 of 3$1,637,370+6.0%
31 JUL 202661K85District 01Rolling Meadows, section 21-00126-00-PV1 of 10$2,813,311Low, 3.0% under the second
31 JUL 202662J64District 01Section 2019-122-RS&SW2 of 4$3,645,000+25%
12 JUN 202661L30District 01Campton Hills, section 24-00012-00-FP3 of 4$3,097,914+7.0%
12 JUN 202662U72District 01Section FAP3 of 5$54,499,655+3.0%
12 JUN 202662W99District 01Section (0404-316-HB)4 of 5$27,971,000+9.0%
12 JUN 202666T39District 03Section (50-3,4,5,8)PP-22 of 2$3,976,471+41%
12 JUN 202666T45District 03Section (50-6)PP-13 of 3$777,492+22%
12 JUN 202680B22District 01Section 2025-2001-RS2 of 4$7,931,346+7.0%
12 JUN 202680B23District 01Section 2025-2002-RS1 of 3$3,171,166Low, 8.0% under the second
12 JUN 202680B28District 01Section 2025-2009-RS3 of 5$4,191,499+7.0%
12 JUN 202680B35District 01Section 2025-2003-RS4 of 4$2,934,000+2.0%
12 JUN 202680B87District 01Section 2025-2046-RS3 of 4$3,747,000+20%
12 JUN 202680C45District 01Section 2025-2102-RS4 of 4$1,741,374+8.0%
12 JUN 202680D00District 01Section 2025-2137-RS,SW1 of 3$2,322,000Low, 26% under the second
24 APR 202661L48District 01Huntley, section 20-00050-00-PV2 of 2$13,151,363+7.0%
24 APR 202661L84District 01Carol Stream, section 24-00071-00-RS2 of 7$2,375,252+2.0%
24 APR 202661M17District 01Algonquin, section 22-00093-00-PV2 of 6$3,721,740+1.0%
24 APR 202662K33District 01Section 2019-161-W1 of 4$31,680,000Low, 5.0% under the second
24 APR 202680B09District 01Section 2025-1097-RS3 of 3$4,891,091+10%
Plote Construction, Inc.: latest IDOT bids in the data

How this record was read

IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

  • Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy