IDOT contract 80B23 bid tabulation
Section 2025-2002-RS. Let by Illinois DOT on June 12, 2026, Kane, District 01. 3 bids received; low bid $3,171,166 by Plote Construction, Inc..
- Owner
- Illinois DOT
- Letting
- 12 JUN 2026
- Pay items
- 69
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Plote Construction, Inc. | $3,171,166 | Low |
| 2 | Builders Paving, LLC | $3,428,288 | +8.0% |
| 3 | Curran Contracting Company | $3,464,641 | +9.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Plote Construction, Inc. | 2. Builders Paving, LLC | 3. Curran Contracting Company |
|---|---|---|---|---|---|---|
| 1 | Grading & shap SHLDRS (X2020110) | UNIT | 288 | $120.00 | $100.00 | $50.00 |
| 2 | Temp access- priv ent (X4021000) | EACH | 9 | $100.00 | $100.00 | $125.00 |
| 3 | Temp access- com ent (X4022000) | EACH | 3 | $100.00 | $200.00 | $250.00 |
| 4 | CC&G RMVL repl < = 10 (X4400501) | LF | 30 | $50.00 | $150.00 | $200.65 |
| 5 | CC&G RMVL repl > 10FT (X4400503) | LF | 90 | $49.00 | $100.00 | $200.65 |
| 6 | Centerln rum strip 16 (X6420114) | LF | 9,718 | $0.60 | $1.00 | $1.00 |
| 7 | Engrs FLD ofc TY A D1 (X6700407) | CAL MO | 12 | $3,750.00 | $4,000.00 | $4,500.00 |
| 8 | Temp info signing (X7200061) | SF | 204 | $17.00 | $17.00 | $17.00 |
| 9 | HS THPL PM LN 4 (X7800815) | LF | 9,502 | $0.50 | $0.50 | $0.50 |
| 10 | Det loop repl (X8860105) | LF | 1,558 | $21.00 | $21.00 | $20.14 |
| 11 | Earth excavation (20200100) | CY | 5,190 | $40.00 | $70.00 | $60.00 |
| 12 | Rem & disp uns matl (20201200) | CY | 649 | $40.00 | $35.00 | $60.00 |
| 13 | Geotech fab F/GR stab (21001000) | SY | 1,947 | $3.00 | $2.00 | $2.25 |
| 14 | Topsoil F & P 4 (21101615) | SY | 27 | $30.00 | $30.00 | $85.00 |
| 15 | Sodding salt tolerant (25200110) | SY | 27 | $30.00 | $40.00 | $165.00 |
| 16 | Perimeter eros bar (28000400) | LF | 1,135 | $8.00 | $5.00 | $3.80 |
| 17 | Agg subgrade improve (30300001) | CY | 649 | $60.00 | $35.00 | $45.00 |
| 18 | Agg subgrade impr 12 (30300112) | SY | 7,785 | $30.00 | $35.00 | $28.00 |
| 19 | HMA BC wid 8 (35600708) | SY | 7,785 | $60.00 | $50.00 | $50.00 |
| 20 | Bit matls PR CT (40600275) | LB | 17,517 | $0.01 | $0.01 | $0.01 |
| 21 | Bit matls tack CT (40600290) | LB | 28,293 | $0.01 | $0.01 | $1.00 |
| 22 | Long joint sealant (40600370) | LF | 26,872 | $2.65 | $3.00 | $3.00 |
| 23 | Mix CR JTS flangewys (40600400) | TON | 89 | $150.00 | $350.00 | $350.00 |
| 24 | HMA surf rem butt JT (40600982) | SY | 211 | $11.00 | $30.00 | $15.00 |
| 25 | HMA SC IL-9.5 D N70 (40604062) | TON | 5,609 | $90.00 | $90.00 | $86.50 |
| 26 | Protective coat (42001300) | SY | 40 | $3.00 | $3.00 | $0.01 |
| 27 | Pavement rem (44000100) | SY | 7,785 | $1.20 | $1.00 | $12.00 |
| 28 | HMA surf rem 1 1/2 (44000155) | SY | 58,979 | $3.50 | $3.50 | $3.50 |
| 29 | CL D patch T1 17 (44201847) | SY | 161 | $60.00 | $100.00 | $415.00 |
| 30 | CL D patch T2 17 (44201851) | SY | 955 | $60.00 | $100.00 | $155.00 |
| 31 | CL D patch T3 17 (44201855) | SY | 1,147 | $60.00 | $80.00 | $140.00 |
| 32 | CL D patch T4 17 (44201857) | SY | 1,008 | $60.00 | $80.00 | $115.00 |
| 33 | Saw cuts (44213200) | LF | 28,785 | $0.20 | $2.50 | $2.00 |
| 34 | Agg wedge SHLD type B (48102100) | TON | 410 | $50.00 | $55.00 | $75.00 |
| 35 | FR & lids adjust (60300305) | EACH | 1 | $450.00 | $500.00 | $1,200.00 |
| 36 | Shoulder rum strip 8 (64200108) | LF | 28,785 | $0.29 | $1.00 | $0.60 |
| 37 | Non SPL waste disposl (66900200) | CY | 5,190 | $90.00 | $25.00 | $50.00 |
| 38 | Soil disposal analy (66900530) | EACH | 5 | $870.00 | $870.00 | $900.00 |
| 39 | Reg sub P-const plan (66901001) | LS | 1 | $5,700.00 | $5,700.00 | $5,500.00 |
| 40 | Reg sub F con report (66901003) | LS | 1 | $500.00 | $500.00 | $500.00 |
| 41 | Reg sub mon (66901006) | CAL DAY | 20 | $935.00 | $715.00 | $750.00 |
| 42 | Mobilization (67100100) | LS | 1 | $185,000 | $633,755 | $275,000 |
| 43 | Traf cont-prot 701201 (70100450) | LS | 1 | $1.00 | $500.00 | $1.00 |
| 44 | Traf cont-prot 701306 (70100460) | LS | 1 | $1.00 | $500.00 | $1.00 |
| 45 | Traf cont-prot 701326 (70100500) | LS | 1 | $225,000 | $500.00 | $10,000 |
| 46 | Traf cont-prot 701336 (70100600) | LS | 1 | $1.00 | $500.00 | $1.00 |
| 47 | TR cont & prot 701501 (70102620) | LS | 1 | $10,000 | $25,000 | $100,000 |
| 48 | TR cont & prot 701502 (70102622) | LS | 1 | $1.00 | $500.00 | $1.00 |
| 49 | TR cont & prot 701701 (70102635) | LS | 1 | $1.00 | $500.00 | $1.00 |
| 50 | TR cont surveillance (70103815) | CAL DAY | 20 | $300.00 | $500.00 | $300.00 |
| 51 | Short term pavt mking (70300100) | LF | 24,163 | $0.10 | $1.50 | $0.30 |
| 52 | SHRT TRM pavt MK rem (70300150) | SF | 2,014 | $0.10 | $0.01 | $2.50 |
| 53 | Temp PVT MK LTR & sym paint (70300211) | SF | 328 | $0.10 | $0.01 | $0.10 |
| 54 | Temp PVT MK line 4 - paint (70300221) | LF | 54,221 | $0.01 | $0.01 | $0.10 |
| 55 | Temp PVT MK line 6 - paint (70300241) | LF | 1,573 | $0.01 | $0.01 | $0.10 |
| 56 | Temp PVT MK line 12 - paint (70300261) | LF | 815 | $0.01 | $0.01 | $0.10 |
| 57 | Temp PVT MK line 24 - paint (70300281) | LF | 614 | $0.01 | $0.01 | $0.10 |
| 58 | Temp PVT MK L4 T4 tape (70307120) | LF | 6,041 | $0.10 | $1.00 | $0.10 |
| 59 | THPL PVT MK LTR & sym (78000100) | SF | 328 | $5.50 | $5.50 | $5.50 |
| 60 | THPL PVT MK line 4 (78000200) | LF | 54,221 | $0.60 | $0.60 | $0.60 |
| 61 | THPL PVT MK line 6 (78000400) | LF | 1,573 | $0.75 | $0.75 | $0.75 |
| 62 | THPL PVT MK line 12 (78000600) | LF | 815 | $2.00 | $2.00 | $2.00 |
| 63 | THPL PVT MK line 24 (78000650) | LF | 307 | $5.50 | $5.50 | $5.50 |
| 64 | Mod ureth PM LTR-sym (78009000) | SF | 37 | $10.00 | $10.00 | $10.00 |
| 65 | Mod ureth PM line 4 (78009004) | LF | 1,624 | $2.20 | $2.20 | $2.20 |
| 66 | Mod ureth PM line 6 (78009006) | LF | 181 | $5.40 | $5.40 | $5.40 |
| 67 | Mod ureth PM line 12 (78009012) | LF | 150 | $10.50 | $10.50 | $10.50 |
| 68 | Raised refl pavt MKR (78100100) | EACH | 1,044 | $30.00 | $30.00 | $30.00 |
| 69 | Raised ref PVT MK rem (78300200) | EACH | 836 | $7.00 | $15.00 | $25.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of June 12, 2026. Compiled by Mirage Metrics.