IDOT contract 61L84 bid tabulation
Carol Stream, section 24-00071-00-RS. Let by Illinois DOT on April 24, 2026, Dupage, District 01. 7 bids received; low bid $2,324,754 by K-Five Construction Corporation.
- Owner
- Illinois DOT
- Letting
- 24 APR 2026
- Pay items
- 127
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | K-Five Construction Corporation | $2,324,754 | Low |
| 2 | Plote Construction, Inc. | $2,375,252 | +2.0% |
| 3 | D'Land Construction, LLC | $2,508,636 | +8.0% |
| 4 | R. W. Dunteman Company | $2,554,000 | +10% |
| 5 | Alliance Contractors, Inc. | $2,558,467 | +10% |
| 6 | A Lamp Concrete Contractors, Inc. | $2,744,970 | +18% |
| 7 | Schroeder Asphalt Services, Inc. | $2,924,087 | +26% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. K-Five Construction Corporation | 2. Plote Construction, Inc. | 3. D'Land Construction, LLC | 4. R. W. Dunteman Company | 5. Alliance Contractors, Inc. | 6. A Lamp Concrete Contractors, Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Weed cont aquatic (K0029614) | GAL | 0.25 | $5,000.00 | $5,000.00 | $9,200.00 | $5,000.00 | $5,000.00 | $5,000.00 |
| 2 | Washout basin (X0326806) | LS | 1 | $1,000.00 | $2,000.00 | $4,500.00 | $2,000.00 | $1,500.00 | $1,000.00 |
| 3 | Power pedestals (X1400088) | EACH | 2 | $3,660.00 | $3,700.00 | $4,209.00 | $3,660.00 | $3,660.00 | $3,660.00 |
| 4 | Luminaire LED special (X1400238) | EACH | 16 | $1,350.90 | $1,400.00 | $1,553.53 | $1,350.90 | $1,350.90 | $1,350.90 |
| 5 | Explor trench SPL (X2130010) | LF | 100 | $50.00 | $44.00 | $75.00 | $46.00 | $44.00 | $50.60 |
| 6 | Seeding CL 5A mod (X2500322) | ACRE | 0.25 | $3,000.00 | $3,000.00 | $6,900.00 | $3,000.00 | $3,000.00 | $3,000.00 |
| 7 | Seeding CL 4A mod (X2502014) | ACRE | 0.25 | $3,000.00 | $3,000.00 | $6,900.00 | $3,000.00 | $3,000.00 | $3,000.00 |
| 8 | Temp access- com ent (X4022000) | EACH | 16 | $350.00 | $50.00 | $200.00 | $224.03 | $1.00 | $500.00 |
| 9 | HMA driveway pavt 10 (X4060294) | SY | 200 | $110.00 | $125.00 | $122.00 | $92.13 | $105.00 | $109.00 |
| 10 | HMA surf rem var DP (X4401198) | SY | 21,648 | $5.95 | $6.50 | $6.50 | $9.09 | $5.80 | $6.85 |
| 11 | Pro SS conn to EX man (X5510011) | EACH | 2 | $2,100.00 | $3,300.00 | $500.00 | $950.00 | $3,280.00 | $1,045.00 |
| 12 | Pro man/CB con OV SS (X6025604) | EACH | 3 | $5,500.00 | $3,700.00 | $1,500.00 | $8,150.00 | $3,679.00 | $8,965.00 |
| 13 | FR & lids adjust SPL (X6030310) | EACH | 5 | $975.00 | $2,100.00 | $1,350.00 | $2,125.00 | $2,010.00 | $2,337.50 |
| 14 | Wood posts (X6300235) | EACH | 1 | $1,000.00 | $500.00 | $1,000.00 | $320.00 | $500.00 | $250.00 |
| 15 | Engrs FLD ofc TY A D1 (X6700407) | CAL MO | 7 | $3,500.00 | $3,650.00 | $5,500.00 | $4,000.00 | $500.00 | $1,500.00 |
| 16 | Maint lighting systm (X8000003) | CAL MO | 4 | $910.00 | $910.00 | $1,047.00 | $910.00 | $910.00 | $910.00 |
| 17 | Det loop repl (X8860105) | LF | 975 | $60.00 | $60.00 | $69.00 | $60.00 | $60.00 | $60.00 |
| 18 | Construction layout (Z0013798) | LS | 1 | $91,000 | $15,500 | $23,000 | $19,000 | $15,500 | $15,500 |
| 19 | Drain util STR adj (Z0017400) | EACH | 31 | $485.00 | $1,300.00 | $550.00 | $1,125.00 | $1,278.00 | $1,237.50 |
| 20 | RR prot liability ins (Z0048665) | LS | 1 | $15,000 | $1,500.00 | $25,000 | $4,000.00 | $500.00 | $5,000.00 |
| 21 | Trainees (Z0076600) | HR | 500 | $0.80 | $0.80 | $0.80 | $0.80 | $0.80 | $0.80 |
| 22 | Trainees TPG (Z0076604) | HR | 500 | $15.00 | $15.00 | $15.00 | $15.00 | $15.00 | $15.00 |
| 23 | Temporary fence (20101000) | LF | 597 | $5.00 | $4.50 | $25.00 | $8.00 | $4.50 | $4.50 |
| 24 | Earth excavation (20200100) | CY | 888 | $44.00 | $35.00 | $52.00 | $43.29 | $40.00 | $74.50 |
| 25 | Rem & disp uns matl (20201200) | CY | 498 | $55.00 | $35.00 | $52.00 | $65.72 | $40.00 | $53.00 |
| 26 | Trench backfill (20800150) | CY | 74 | $42.00 | $86.00 | $38.00 | $23.00 | $86.00 | $25.30 |
| 27 | Geotech fab F/GR stab (21001000) | SY | 60 | $7.50 | $10.00 | $4.00 | $4.13 | $10.00 | $4.35 |
| 28 | Topsoil F & P 1 (21101601) | SY | 968 | $3.00 | $3.00 | $7.00 | $3.00 | $3.00 | $3.00 |
| 29 | Topsoil F & P 4 (21101615) | SY | 3,929 | $5.00 | $5.00 | $7.00 | $5.00 | $5.00 | $5.00 |
| 30 | Seeding CL 1A (25000110) | ACRE | 1.25 | $4,840.00 | $4,900.00 | $4,600.00 | $4,840.00 | $4,840.00 | $4,840.00 |
| 31 | Nitrogen fert nutr (25000400) | LB | 77 | $1.00 | $1.00 | $2.30 | $1.00 | $1.00 | $1.00 |
| 32 | Phosphorus fert nutr (25000500) | LB | 77 | $1.00 | $1.00 | $2.30 | $1.00 | $1.00 | $1.00 |
| 33 | Potassium fert nutr (25000600) | LB | 77 | $1.00 | $1.00 | $2.30 | $1.00 | $1.00 | $1.00 |
| 34 | Erosion contr blanket (25100630) | SY | 4,857 | $1.25 | $1.25 | $3.45 | $1.25 | $1.25 | $1.25 |
| 35 | Temp eros contr seed (28000250) | LB | 249 | $0.10 | $0.10 | $1.15 | $0.10 | $0.10 | $0.10 |
| 36 | Temp ditch checks (28000305) | LF | 80 | $12.00 | $12.00 | $23.00 | $12.00 | $12.00 | $12.00 |
| 37 | Perimeter eros bar (28000400) | LF | 200 | $10.00 | $10.00 | $7.00 | $10.00 | $10.00 | $10.00 |
| 38 | Inlet & pipe protect (28000500) | EACH | 10 | $250.00 | $150.00 | $290.00 | $200.00 | $50.00 | $150.00 |
| 39 | Inlet filters (28000510) | EACH | 47 | $70.00 | $250.00 | $290.00 | $200.00 | $50.00 | $15.00 |
| 40 | Stone riprap CL A3 (28100105) | SY | 37 | $95.00 | $100.00 | $115.00 | $225.00 | $100.00 | $247.50 |
| 41 | Filter fabric (28200200) | SY | 37 | $5.00 | $10.00 | $15.00 | $5.00 | $1.00 | $5.50 |
| 42 | Agg subgrade improve (30300001) | CY | 20 | $45.00 | $70.00 | $95.00 | $69.81 | $65.00 | $80.00 |
| 43 | Agg base cse B 6 (35101800) | SY | 5,013 | $14.50 | $15.00 | $6.00 | $12.09 | $9.00 | $15.25 |
| 44 | PCC bse cse var DP (35301400) | SY | 594 | $95.00 | $150.00 | $10.00 | $108.42 | $66.00 | $102.00 |
| 45 | Bit matls tack CT (40600290) | LB | 14,661 | $0.01 | $0.01 | $0.01 | $0.93 | $0.01 | $0.01 |
| 46 | Long joint sealant (40600370) | LF | 6,576 | $3.15 | $4.50 | $4.30 | $3.48 | $2.87 | $2.87 |
| 47 | Mix CR JTS flangewys (40600400) | TON | 5 | $1,000.00 | $1,400.00 | $1,150.00 | $413.14 | $1,000.00 | $330.00 |
| 48 | HMA surf rem butt JT (40600982) | SY | 222 | $0.01 | $25.00 | $0.01 | $29.54 | $0.01 | $23.00 |
| 49 | HMA BC IL-19.0 N50 (40603080) | TON | 2,799 | $80.00 | $87.00 | $88.00 | $84.76 | $80.00 | $96.00 |
| 50 | HMA SC IL-9.5 D N50 (40604060) | TON | 2,130 | $110.00 | $88.00 | $105.00 | $89.05 | $95.00 | $98.00 |
| 51 | Protective coat (42001300) | SY | 3,916 | $0.01 | $1.10 | $0.50 | $0.10 | $0.01 | $1.00 |
| 52 | PCC driveway pavt 8 (42300400) | SY | 1,136 | $95.00 | $100.00 | $88.00 | $79.93 | $101.00 | $133.00 |
| 53 | PC conc sidewalk 5 (42400200) | SF | 13,512 | $7.25 | $10.00 | $9.50 | $8.92 | $9.00 | $8.25 |
| 54 | PC conc sidewalk 6 (42400300) | SF | 1,547 | $10.00 | $12.00 | $10.00 | $10.75 | $9.75 | $10.75 |
| 55 | Detectable warnings (42400800) | SF | 149 | $38.00 | $35.00 | $35.00 | $37.49 | $30.00 | $35.00 |
| 56 | Pavement rem (44000100) | SY | 498 | $20.00 | $10.00 | $18.00 | $48.70 | $20.00 | $38.25 |
| 57 | Drive pavement rem (44000200) | SY | 1,269 | $17.00 | $16.00 | $15.00 | $18.66 | $40.00 | $33.00 |
| 58 | Comb curb gutter rem (44000500) | LF | 4,949 | $7.00 | $9.00 | $8.00 | $13.67 | $40.00 | $9.00 |
| 59 | Sidewalk rem (44000600) | SF | 1,978 | $1.80 | $2.50 | $1.75 | $5.38 | $4.00 | $1.85 |
| 60 | CL D patch T1 10 (44201761) | SY | 179 | $40.00 | $25.00 | $92.00 | $135.05 | $80.00 | $88.50 |
| 61 | CL D patch T2 10 (44201765) | SY | 179 | $40.00 | $25.00 | $92.00 | $127.66 | $80.00 | $81.50 |
| 62 | CL D patch T3 10 (44201769) | SY | 179 | $40.00 | $25.00 | $92.00 | $120.27 | $80.00 | $79.00 |
| 63 | CL D patch T4 10 (44201771) | SY | 179 | $40.00 | $25.00 | $92.00 | $113.16 | $80.00 | $76.00 |
| 64 | Pipe culvert remov (50105220) | LF | 147 | $25.00 | $15.00 | $15.00 | $10.00 | $10.00 | $11.00 |
| 65 | Pipe handrail (50901760) | LF | 84 | $179.51 | $150.00 | $206.00 | $225.00 | $179.51 | $179.51 |
| 66 | PRC flar end sec 18 (54213663) | EACH | 1 | $2,100.00 | $2,300.00 | $1,940.00 | $1,825.00 | $2,239.00 | $2,007.50 |
| 67 | Storm sew CL A 1 12 (550A0050) | LF | 79 | $90.00 | $100.00 | $108.00 | $165.00 | $97.00 | $181.50 |
| 68 | Storm sew CL A 1 18 (550A0090) | LF | 134 | $98.00 | $115.00 | $136.00 | $185.00 | $111.00 | $203.50 |
| 69 | Storm sew CL A 1 24 (550A0120) | LF | 13 | $150.00 | $140.00 | $444.00 | $225.00 | $138.00 | $247.50 |
| 70 | Storm sewer rem 8 (55100300) | LF | 8 | $11.00 | $32.00 | $20.00 | $10.00 | $32.00 | $11.00 |
| 71 | Storm sewer rem 10 (55100400) | LF | 14 | $14.00 | $32.00 | $25.00 | $10.00 | $32.00 | $11.00 |
| 72 | Storm sewer rem 21 (55101100) | LF | 2 | $25.00 | $45.00 | $30.00 | $10.00 | $41.00 | $11.00 |
| 73 | Storm sewer rem 24 (55101200) | LF | 5 | $25.00 | $50.00 | $40.00 | $10.00 | $41.00 | $11.00 |
| 74 | Fire hydnts to BE MVD (56400100) | EACH | 1 | $7,500.00 | $6,400.00 | $12,000 | $9,950.00 | $6,316.00 | $10,945 |
| 75 | CB TA 4 dia T8G (60200805) | EACH | 1 | $5,500.00 | $4,200.00 | $4,175.00 | $4,750.00 | $4,135.00 | $5,225.00 |
| 76 | CB TA 4 dia T11V F&G (60201110) | EACH | 1 | $7,000.00 | $4,600.00 | $4,511.00 | $5,150.00 | $4,545.00 | $5,665.00 |
| 77 | CB TC T8G (60207605) | EACH | 3 | $2,650.00 | $2,300.00 | $3,330.00 | $3,685.00 | $2,212.00 | $4,053.50 |
| 78 | CB TC T11F&G (60207905) | EACH | 1 | $2,900.00 | $2,700.00 | $2,700.00 | $3,850.00 | $2,623.00 | $4,235.00 |
| 79 | Man TA 4 dia T1F CL (60218400) | EACH | 1 | $5,300.00 | $4,200.00 | $5,100.00 | $4,925.00 | $4,197.00 | $5,417.50 |
| 80 | Man TA 5 dia T1F CL (60221100) | EACH | 6 | $8,100.00 | $7,000.00 | $6,400.00 | $6,985.00 | $6,918.00 | $7,683.50 |
| 81 | Man TA 6 dia T1F CL (60223800) | EACH | 1 | $12,100 | $12,000 | $8,967.00 | $8,650.00 | $11,114 | $9,515.00 |
| 82 | Man TA 6 dia T11F&G (60224020) | EACH | 1 | $12,900 | $12,000 | $9,231.00 | $8,825.00 | $11,376 | $9,707.50 |
| 83 | Remov manholes (60500040) | EACH | 2 | $450.00 | $1,300.00 | $500.00 | $340.00 | $1,226.00 | $374.00 |
| 84 | Remov inlets (60500060) | EACH | 1 | $450.00 | $415.00 | $500.00 | $100.00 | $412.00 | $110.00 |
| 85 | Comb CC&G TB6.12 (60603800) | LF | 5,011 | $28.00 | $35.00 | $34.00 | $32.05 | $57.50 | $46.50 |
| 86 | Non SPL waste disposl (66900200) | CY | 200 | $124.00 | $90.00 | $105.00 | $110.00 | $93.00 | $90.00 |
| 87 | Soil disposal analy (66900530) | EACH | 2 | $1,065.00 | $1,100.00 | $1,668.00 | $1,065.00 | $900.00 | $1,065.00 |
| 88 | Reg sub P-const plan (66901001) | LS | 1 | $4,200.00 | $4,200.00 | $3,565.00 | $4,200.00 | $5,000.00 | $4,200.00 |
| 89 | Reg sub F con report (66901003) | LS | 1 | $500.00 | $500.00 | $1,380.00 | $500.00 | $500.00 | $500.00 |
| 90 | Reg sub mon (66901006) | CAL DAY | 10 | $715.00 | $600.00 | $782.00 | $715.00 | $1,750.00 | $715.00 |
| 91 | Mobilization (67100100) | LS | 1 | $137,000 | $127,000 | $120,000 | $150,013 | $164,754 | $106,198 |
| 92 | TR cont & prot 701501 (70102620) | LS | 1 | $8,000.00 | $53,000 | $67,100 | $60,925 | $8,000.00 | $1.00 |
| 93 | TR cont & prot 701502 (70102622) | LS | 1 | $1.00 | $500.00 | $1.00 | $1.00 | $1.00 | $237,350 |
| 94 | TR cont & prot 701701 (70102635) | LS | 1 | $1.00 | $500.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 95 | TR cont & prot 701801 (70102640) | LS | 1 | $1.00 | $500.00 | $57,100 | $1.00 | $1.00 | $1.00 |
| 96 | Changeable message SN (70107025) | CAL DAY | 180 | $35.00 | $30.00 | $34.50 | $35.00 | $35.00 | $10.00 |
| 97 | Short term pavt mking (70300100) | LF | 7,602 | $1.00 | $0.10 | $1.00 | $1.12 | $1.00 | $0.01 |
| 98 | SHRT TRM pavt MK rem (70300150) | SF | 1,901 | $2.00 | $0.10 | $2.00 | $1.56 | $1.00 | $0.01 |
| 99 | Temp PVT MK LTR & sym paint (70300211) | SF | 391 | $1.75 | $0.10 | $1.15 | $1.75 | $1.75 | $0.01 |
| 100 | Temp PVT MK line 4 - paint (70300221) | LF | 26,500 | $0.50 | $0.10 | $0.28 | $0.50 | $0.50 | $0.01 |
| 101 | Temp PVT MK line 24 - paint (70300281) | LF | 72 | $3.00 | $0.10 | $1.15 | $3.00 | $3.00 | $0.01 |
| 102 | Sign panel T1 (72000100) | SF | 10 | $37.50 | $26.00 | $57.50 | $37.50 | $37.50 | $35.00 |
| 103 | Rem & rel sign panel asmbly TA (72400205) | EACH | 10 | $375.00 | $150.00 | $172.50 | $375.00 | $375.00 | $150.00 |
| 104 | Teles STL sin support (72800100) | LF | 20 | $25.00 | $38.00 | $25.30 | $25.00 | $25.00 | $35.00 |
| 105 | THPL PVT MK LTR & sym (78000100) | SF | 1,139 | $5.00 | $5.00 | $5.75 | $5.00 | $5.00 | $5.50 |
| 106 | THPL PVT MK line 4 (78000200) | LF | 12,748 | $0.65 | $0.78 | $0.75 | $0.65 | $0.65 | $0.86 |
| 107 | THPL PVT MK line 6 (78000400) | LF | 2,035 | $1.10 | $1.35 | $1.27 | $1.10 | $1.10 | $1.49 |
| 108 | THPL PVT MK line 12 (78000600) | LF | 669 | $2.50 | $2.25 | $2.90 | $2.50 | $2.50 | $2.48 |
| 109 | THPL PVT MK line 24 (78000650) | LF | 175 | $4.80 | $5.00 | $5.50 | $4.80 | $4.80 | $5.50 |
| 110 | Elect serv install (80400100) | EACH | 2 | $5,340.00 | $5,340.00 | $6,244.00 | $5,340.00 | $5,340.00 | $5,340.00 |
| 111 | Elect util serv conn (80400200) | LS | 1 | $7,500.00 | $7,500.00 | $7,500.00 | $7,500.00 | $7,500.00 | $7,500.00 |
| 112 | Undrgrd C galvs 2 (81028200) | LF | 795 | $65.51 | $70.00 | $75.34 | $65.51 | $65.51 | $65.51 |
| 113 | Undrgrd C galvs 4 (81028240) | LF | 143 | $110.88 | $115.00 | $127.50 | $110.88 | $110.88 | $110.88 |
| 114 | Handhole (81400100) | EACH | 4 | $3,258.60 | $3,300.00 | $3,747.40 | $3,258.60 | $3,258.60 | $3,258.60 |
| 115 | UD 4#10#10GXLPUSE 3/4 (81603022) | LF | 4,345 | $12.12 | $13.00 | $13.94 | $12.12 | $12.12 | $12.12 |
| 116 | EC C XLP use 1C 2 (81702150) | LF | 160 | $4.15 | $4.15 | $4.77 | $4.15 | $4.15 | $4.15 |
| 117 | LT P A 30MH 8MA (83006300) | EACH | 16 | $4,407.20 | $4,500.00 | $5,068.30 | $4,407.20 | $4,407.20 | $4,407.20 |
| 118 | LP F M 11.5BC 8 5/8X6 (83600352) | EACH | 19 | $1,518.52 | $1,520.00 | $1,746.30 | $1,518.52 | $1,518.52 | $1,518.52 |
| 119 | Bkwy dev TR B 11.5BC (83800105) | EACH | 19 | $935.10 | $950.00 | $1,075.37 | $935.10 | $935.10 | $935.10 |
| 120 | Rem pole FDN (84200804) | EACH | 3 | $780.00 | $780.00 | $897.00 | $780.00 | $780.00 | $780.00 |
| 121 | Reloc EX LT unit (84400105) | EACH | 3 | $2,940.00 | $3,000.00 | $3,381.00 | $2,940.00 | $2,940.00 | $2,940.00 |
| 122 | Remov lighting contr (84500110) | EACH | 1 | $1,820.00 | $1,820.00 | $2,093.00 | $1,820.00 | $1,820.00 | $1,820.00 |
| 123 | Remov elect serv inst (84500120) | EACH | 1 | $2,160.00 | $2,160.00 | $2,484.00 | $2,160.00 | $2,160.00 | $2,160.00 |
| 124 | Remov LTG contr FDN (84500130) | EACH | 1 | $900.00 | $900.00 | $1,035.00 | $900.00 | $900.00 | $900.00 |
| 125 | Main EX TR sig instal (85000200) | EACH | 2 | $2,670.00 | $2,670.00 | $3,071.00 | $2,670.00 | $2,670.00 | $2,670.00 |
| 126 | Elcbl C lead 14 1PR (87301305) | LF | 1,426 | $1.94 | $2.00 | $2.23 | $1.94 | $1.94 | $1.94 |
| 127 | Rem elcbl FR con (89502300) | LF | 1,488 | $0.63 | $0.65 | $0.72 | $0.63 | $0.63 | $0.63 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of April 24, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.