R. W. Dunteman Company: IDOT bid record

R. W. Dunteman Company submitted 236 bids on Illinois DOT contracts in the data, from 15 JAN 2021 to 18 SEP 2026, and was the low bidder on 42 of them (18%). When it was not low, its total sat a median +9.0% above the low bid.

Owner
Illinois DOT
Low bid volume
$240,679,463
Latest bid
18 SEP 2026
Data through
18 SEP 2026
236Bids
42Low bids
18Win rate, percent
+9.0%Median gap to the low bid when not low, 194 bids

By year

YearBidsLow bidsWin rate
20215248%
202240615%
202334515%
2024471226%
2025361028%
202627519%
R. W. Dunteman Company, IDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 012314118%
District 034125%
District 02100%
R. W. Dunteman Company, IDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Trainees TPGZ0076604HR158158 (100%)$15.00$15.00
TraineesZ0076600HR155155 (100%)$0.80$0.80
THPL PVT MK line 2478000650LF204125 (61%)$5.50$6.00
THPL PVT MK line 478000200LF203119 (59%)$0.76$0.88
THPL PVT MK LTR & sym78000100SF187114 (61%)$5.25$5.75
THPL PVT MK line 1278000600LF205111 (54%)$2.77$3.10
PC conc sidewalk 542400200SF182108 (59%)$8.29$10.00
THPL PVT MK line 678000400LF202107 (53%)$1.25$1.40
Temp info signingZ0030850SF16683 (50%)$15.12$18.00
Soil disposal analy66900530EACH17082 (48%)$1,350.00$1,470.00
Sodding salt tolerant25200110SY15378 (51%)$13.00$18.00
Topsoil F & P 421101615SY15972 (45%)$6.00$6.60
R. W. Dunteman Company, IDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

R. W. Dunteman Company, IDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
18 SEP 202662V85District 01Section FAP2 of 3$8,847,947+9.0%
18 SEP 202662V90District 01Section FAU4 of 4$3,645,714+24%
18 SEP 202662X84District 01Section 2024-1043-RS2 of 3$4,448,800+7.0%
31 JUL 202661K19District 01Elk Grove Village, section 22-00078-00-RS1 of 4$1,589,589Low, 3.0% under the second
31 JUL 202661K85District 01Rolling Meadows, section 21-00126-00-PV4 of 10$2,962,000+5.0%
12 JUN 202661M49District 01Maywood, section 23-00142-00-LT2 of 4$1,776,250+4.0%
12 JUN 202662L30District 01Section 2020-142-C&DR6 of 6$16,856,570+21%
12 JUN 202662W99District 01Section (0404-316-HB)3 of 5$27,543,000+8.0%
12 JUN 202680B28District 01Section 2025-2009-RS4 of 5$4,397,730+12%
12 JUN 202680B35District 01Section 2025-2003-RS2 of 4$2,889,889+1.0%
12 JUN 202680B87District 01Section 2025-2046-RS4 of 4$3,924,190+26%
24 APR 202661L84District 01Carol Stream, section 24-00071-00-RS4 of 7$2,554,000+10%
24 APR 202661M36District 01Glendale Heights, section 23-00077-00-RS5 of 6$1,115,950+14%
24 APR 202661M37District 01Lombard, section 24-00170-00-RS1 of 4$1,684,000Low, 7.0% under the second
24 APR 202680B07District 01Section 2025-1095-RS5 of 5$1,775,000+12%
24 APR 202680B09District 01Section 2025-1097-RS2 of 3$4,779,100+8.0%
24 APR 202680B39District 01Section 2025-2015-RS,SW3 of 3$6,593,500+2.0%
27 FEB 202661L93District 01Arlington Heights, section 23-00221-00-RS4 of 4$7,247,595+6.0%
27 FEB 202661M28District 01Schaumburg, section 25-00149-02-RS2 of 7$4,068,800+3.0%
27 FEB 202680B08District 01Section 2025-1096-RS3 of 4$2,391,900+10%
27 FEB 202680B15District 01Section 2025-1089-RS1 of 4$4,255,555Low, 11% under the second
27 FEB 202680B25District 01Section 2025-2006-RS1 of 4$3,330,985Low, 10% under the second
16 JAN 202661J01District 01Project Number: X6Uk-066 / /, section 16-00232-00-CH1 of 5$9,341,000Low, 1.0% under the second
16 JAN 202661K16District 01Franklin Park, section 17-00083-02-PV4 of 10$3,972,919+4.0%
16 JAN 202661L36District 01Downers Grove, section 23-00121-00-CH4 of 10$2,193,985+4.0%
R. W. Dunteman Company: latest IDOT bids in the data

How this record was read

IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

  • Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy