IDOT contract 80B25 bid tabulation
Section 2025-2006-RS. Let by Illinois DOT on February 27, 2026, Dupage, District 01. 4 bids received; low bid $3,330,985 by R. W. Dunteman Company.
- Owner
- Illinois DOT
- Letting
- 27 FEB 2026
- Pay items
- 127
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | R. W. Dunteman Company | $3,330,985 | Low |
| 2 | K-Five Construction Corporation | $3,654,603 | +10% |
| 3 | Schroeder Asphalt Services, Inc. | $3,919,769 | +18% |
| 4 | Plote Construction, Inc. | $4,721,112 | +42% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. R. W. Dunteman Company | 2. K-Five Construction Corporation | 3. Schroeder Asphalt Services, Inc. | 4. Plote Construction, Inc. |
|---|---|---|---|---|---|---|---|
| 1 | Constructn layout SPL (X0320050) | LS | 1 | $5,000.00 | $1.00 | $15,000 | $3,187.00 |
| 2 | Ped signal post 5 FT (X1400378) | EACH | 2 | $1,086.66 | $1,870.00 | $2,100.00 | $1,086.66 |
| 3 | Rebld EX HD handhole (X1400450) | EACH | 2 | $3,188.91 | $3,450.00 | $3,900.00 | $3,188.91 |
| 4 | Grading & shap SHLDRS (X2020110) | UNIT | 71 | $97.50 | $70.28 | $30.00 | $370.00 |
| 5 | CC&G RMVL repl < = 10 (X4400501) | LF | 553 | $99.25 | $54.00 | $54.00 | $75.00 |
| 6 | CC&G RMVL repl > 10FT (X4400503) | LF | 150 | $92.25 | $55.00 | $55.00 | $83.00 |
| 7 | PCC SFC rem CM var D (X4406802) | SY | 195 | $10.00 | $2.11 | $10.00 | $31.00 |
| 8 | SS cleaned 12 (X5537800) | LF | 750 | $1.00 | $1.00 | $1.00 | $1.00 |
| 9 | FR & lids adjust SPL (X6030310) | EACH | 14 | $900.00 | $900.00 | $325.00 | $900.00 |
| 10 | Engrs FLD ofc TY A D1 (X6700407) | CAL MO | 12 | $3,200.00 | $3,500.00 | $3,500.00 | $4,000.00 |
| 11 | Temp info signing (X7200061) | SF | 205.60 | $17.00 | $17.00 | $21.00 | $25.00 |
| 12 | Accessible ped signal (X8760200) | EACH | 8 | $2,414.46 | $2,634.00 | $3,000.00 | $2,414.46 |
| 13 | Conc FDN TY A 12D (X8780012) | LF | 8 | $395.86 | $425.00 | $480.00 | $395.86 |
| 14 | Rem aerial cable (X8951011) | LF | 143 | $8.18 | $5.73 | $7.00 | $8.18 |
| 15 | Construction layout (Z0013798) | LS | 1 | $3,000.00 | $1.00 | $15,000 | $21,000 |
| 16 | Drainage STR cleaned (Z0018500) | EACH | 50 | $320.00 | $320.00 | $359.00 | $320.00 |
| 17 | RE-optimize TR sig sys 1 (Z0033044) | EACH | 2 | $792.00 | $755.00 | $900.00 | $792.00 |
| 18 | RR prot liability ins (Z0048665) | LS | 1 | $4,000.00 | $3,776.00 | $3,500.00 | $6,000.00 |
| 19 | Trainees (Z0076600) | HR | 500 | $0.80 | $0.80 | $0.80 | $0.80 |
| 20 | Trainees TPG (Z0076604) | HR | 500 | $15.00 | $15.00 | $15.00 | $15.00 |
| 21 | Earth excavation (20200100) | CY | 4,185 | $36.50 | $65.12 | $58.00 | $54.00 |
| 22 | Trench backfill (20800150) | CY | 5 | $175.00 | $175.00 | $150.00 | $175.00 |
| 23 | Geotech fab F/GR stab (21001000) | SY | 320 | $3.05 | $1.96 | $2.50 | $6.00 |
| 24 | Topsoil F & P 4 (21101615) | SY | 115 | $3.00 | $8.75 | $5.00 | $3.00 |
| 25 | Grading & shap ditch (21400100) | LF | 2,520 | $6.00 | $4.83 | $15.50 | $13.60 |
| 26 | Seeding CL 2A (25000210) | ACRE | 0.25 | $5,000.00 | $10,890 | $6,000.00 | $5,000.00 |
| 27 | Nitrogen fert nutr (25000400) | LB | 0.25 | $5.00 | $4.00 | $6.00 | $5.00 |
| 28 | Potassium fert nutr (25000600) | LB | 0.25 | $5.00 | $4.00 | $6.00 | $5.00 |
| 29 | Erosion contr blanket (25100630) | SY | 1,125 | $4.00 | $0.96 | $4.80 | $4.00 |
| 30 | Sodding salt tolerant (25200110) | SY | 115 | $30.00 | $22.00 | $35.00 | $30.00 |
| 31 | Supple watering (25200200) | UNIT | 1.15 | $1.00 | $150.00 | $2.00 | $1.00 |
| 32 | Temp ditch checks (28000305) | LF | 150 | $15.00 | $8.00 | $18.00 | $15.00 |
| 33 | Inlet & pipe protect (28000500) | EACH | 10 | $275.00 | $250.00 | $300.00 | $275.00 |
| 34 | Temp eros contr blank (28001100) | SY | 1,125 | $1.00 | $0.96 | $1.50 | $1.00 |
| 35 | Agg subgrade impr 12 (30300112) | SY | 6,925 | $16.60 | $24.15 | $20.50 | $44.00 |
| 36 | PCC base cse W 6 (35400100) | SY | 105 | $67.75 | $112.97 | $115.00 | $72.00 |
| 37 | HMA base cse 6 (35501308) | SY | 20 | $83.50 | $18.33 | $80.00 | $170.00 |
| 38 | HMA BC wid 8 (35600708) | SY | 5,920 | $38.10 | $40.79 | $40.50 | $56.00 |
| 39 | Bit matls tack CT (40600290) | LB | 46,055 | $0.01 | $0.01 | $0.01 | $0.01 |
| 40 | Long joint sealant (40600370) | LF | 27,720 | $3.20 | $3.50 | $3.55 | $3.69 |
| 41 | Mix CR JTS flangewys (40600400) | TON | 95 | $381.00 | $50.00 | $300.00 | $100.00 |
| 42 | HMA surf rem butt JT (40600982) | SY | 307 | $26.50 | $28.00 | $15.00 | $19.00 |
| 43 | P HMA BC IL-4.75 N50 (40603200) | TON | 2,895 | $102.25 | $124.00 | $112.00 | $150.00 |
| 44 | HMA SC IL-9.5 D N50 (40604060) | TON | 2 | $482.50 | $54.63 | $150.00 | $1,000.00 |
| 45 | P HMA SC IL-9.5 E N70 (40604172) | TON | 6,849 | $108.50 | $102.00 | $110.00 | $125.00 |
| 46 | Protective coat (42001300) | SY | 615 | $1.05 | $2.00 | $2.00 | $0.01 |
| 47 | PC conc sidewalk 5 (42400200) | SF | 1,560 | $8.50 | $9.75 | $9.75 | $12.00 |
| 48 | Detectable warnings (42400800) | SF | 125 | $36.50 | $34.51 | $35.00 | $28.00 |
| 49 | Pavement rem (44000100) | SY | 665 | $39.75 | $56.46 | $20.00 | $115.00 |
| 50 | HMA surf rem 2 1/2 (44000159) | SY | 62,495 | $3.35 | $3.55 | $2.55 | $3.30 |
| 51 | Drive pavement rem (44000200) | SY | 20 | $50.00 | $19.48 | $30.00 | $15.00 |
| 52 | Sidewalk rem (44000600) | SF | 1,560 | $2.50 | $3.00 | $3.00 | $2.00 |
| 53 | Median removal (44003100) | SF | 2,705 | $6.50 | $2.11 | $5.00 | $3.90 |
| 54 | Paved SHLD removal (44004250) | SY | 2,800 | $9.35 | $12.21 | $8.00 | $26.50 |
| 55 | CL D patch T2 10 (44201765) | SY | 160 | $34.00 | $37.00 | $105.00 | $60.00 |
| 56 | CL D patch T3 10 (44201769) | SY | 795 | $34.00 | $37.00 | $105.00 | $60.00 |
| 57 | CL D patch T4 10 (44201771) | SY | 640 | $34.00 | $37.00 | $104.00 | $60.00 |
| 58 | CL D patch T1 11 (44201773) | SY | 25 | $34.00 | $40.00 | $118.00 | $63.00 |
| 59 | CL D patch T2 11 (44201777) | SY | 255 | $34.00 | $40.00 | $117.00 | $63.00 |
| 60 | CL D patch T3 11 (44201781) | SY | 1,260 | $34.00 | $40.00 | $113.00 | $63.00 |
| 61 | CL D patch T4 11 (44201783) | SY | 1,005 | $34.00 | $40.00 | $113.00 | $63.00 |
| 62 | CL D patch T2 15 (44201827) | SY | 125 | $39.00 | $55.00 | $159.00 | $72.00 |
| 63 | CL D patch T3 15 (44201831) | SY | 620 | $39.00 | $55.00 | $155.00 | $72.00 |
| 64 | CL D patch T4 15 (44201833) | SY | 495 | $39.00 | $55.00 | $155.00 | $72.00 |
| 65 | Aggregate SHLDS B (48101202) | CY | 265 | $68.75 | $92.75 | $59.00 | $215.00 |
| 66 | Agg wedge SHLD type B (48102100) | TON | 160 | $39.50 | $97.22 | $59.00 | $115.00 |
| 67 | Temp soil reten systm (52200020) | SF | 1,695 | $1.00 | $1.00 | $10.00 | $1.00 |
| 68 | Storm sew CL A 1 12 (550A0050) | LF | 10 | $100.00 | $100.00 | $65.00 | $100.00 |
| 69 | Storm sew CL A 1 15 (550A0070) | LF | 190 | $114.50 | $83.00 | $65.00 | $83.00 |
| 70 | CB TA 4 dia T1F OL (60200105) | EACH | 1 | $3,100.00 | $3,100.00 | $2,800.00 | $3,100.00 |
| 71 | Man TA 4 dia T1F CL (60218400) | EACH | 1 | $3,075.00 | $3,075.00 | $2,825.00 | $3,075.00 |
| 72 | Man adjust (60255500) | EACH | 5 | $450.00 | $450.00 | $450.00 | $450.00 |
| 73 | Man reconst (60257900) | EACH | 1 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| 74 | FR & grates adjust (60300105) | EACH | 5 | $450.00 | $450.00 | $450.00 | $450.00 |
| 75 | FR & lids T1 CL (60406100) | EACH | 1 | $470.00 | $470.00 | $470.00 | $470.00 |
| 76 | Comb CC&G TY B-6.24 (60605000) | LF | 300 | $44.50 | $55.00 | $62.00 | $60.00 |
| 77 | Pipe culv cleaned 18 (60920018) | LF | 100 | $4.00 | $4.00 | $4.00 | $4.00 |
| 78 | Non SPL waste disposl (66900200) | CY | 2,300 | $84.75 | $69.08 | $108.00 | $75.00 |
| 79 | Soil disposal analy (66900530) | EACH | 3 | $700.00 | $1,450.00 | $800.00 | $1,450.00 |
| 80 | Reg sub P-const plan (66901001) | LS | 1 | $6,400.00 | $3,100.00 | $7,000.00 | $3,100.00 |
| 81 | Reg sub F con report (66901003) | LS | 1 | $500.00 | $1,200.00 | $550.00 | $1,200.00 |
| 82 | Reg sub mon (66901006) | CAL DAY | 20 | $715.00 | $680.00 | $800.00 | $680.00 |
| 83 | Mobilization (67100100) | LS | 1 | $188,200 | $225,639 | $175,000 | $283,000 |
| 84 | Traf cont-prot 701201 (70100450) | LS | 1 | $38,200 | $1.00 | $1.00 | $250.00 |
| 85 | Traf cont-prot 701306 (70100460) | LS | 1 | $1.00 | $1.00 | $1.00 | $250.00 |
| 86 | TR cont & prot 701501 (70102620) | LS | 1 | $153,625 | $289,130 | $15,000 | $569,000 |
| 87 | TR cont & prot 701502 (70102622) | LS | 1 | $1.00 | $1.00 | $1.00 | $250.00 |
| 88 | TR cont & prot 701606 (70102625) | LS | 1 | $1.00 | $1.00 | $35,000 | $4,000.00 |
| 89 | TR cont & prot 701602 (70102632) | LS | 1 | $2,165.00 | $1,600.00 | $1.00 | $250.00 |
| 90 | TR cont & prot 701701 (70102635) | LS | 1 | $675.00 | $500.00 | $1.00 | $250.00 |
| 91 | TR cont & prot 701801 (70102640) | LS | 1 | $4,750.00 | $3,500.00 | $2,500.00 | $3,500.00 |
| 92 | TR cont surveillance (70103815) | CAL DAY | 1 | $600.00 | $600.00 | $2,500.00 | $1,250.00 |
| 93 | Changeable message SN (70107025) | CAL DAY | 28 | $38.00 | $38.00 | $55.00 | $80.00 |
| 94 | Short term pavt mking (70300100) | LF | 25,365 | $0.01 | $1.00 | $2.25 | $0.01 |
| 95 | SHRT TRM pavt MK rem (70300150) | SF | 2,850 | $5.85 | $2.00 | $3.00 | $0.01 |
| 96 | Temp PVT MK LTR & sym paint (70300211) | SF | 1,250 | $4.00 | $4.00 | $1.40 | $3.00 |
| 97 | Temp PVT MK line 4 - paint (70300221) | LF | 105,450 | $0.30 | $0.30 | $0.43 | $0.25 |
| 98 | Temp PVT MK line 6 - paint (70300241) | LF | 5,310 | $0.45 | $0.45 | $0.80 | $0.50 |
| 99 | Temp PVT MK line 8 - paint (70300251) | LF | 300 | $0.60 | $0.60 | $0.92 | $1.00 |
| 100 | Temp PVT MK line 12 - paint (70300261) | LF | 4,600 | $0.90 | $0.90 | $1.35 | $1.25 |
| 101 | Temp PVT MK line 24 - paint (70300281) | LF | 920 | $2.00 | $2.00 | $1.70 | $3.00 |
| 102 | Temp PVT MK L4 T4 tape (70307120) | LF | 6,345 | $1.30 | $1.30 | $1.55 | $0.01 |
| 103 | THPL PVT MK LTR & sym (78000100) | SF | 625 | $4.75 | $4.75 | $6.75 | $4.75 |
| 104 | THPL PVT MK line 4 (78000200) | LF | 52,725 | $0.79 | $0.79 | $0.82 | $0.79 |
| 105 | THPL PVT MK line 6 (78000400) | LF | 2,655 | $1.00 | $1.00 | $1.70 | $1.00 |
| 106 | THPL PVT MK line 8 (78000500) | LF | 150 | $1.75 | $1.75 | $2.10 | $1.75 |
| 107 | THPL PVT MK line 12 (78000600) | LF | 2,300 | $2.50 | $2.50 | $3.45 | $2.50 |
| 108 | THPL PVT MK line 24 (78000650) | LF | 460 | $4.75 | $4.75 | $7.00 | $4.75 |
| 109 | Mod ureth PM LTR-sym (78009000) | SF | 190 | $6.25 | $6.25 | $13.50 | $6.25 |
| 110 | Mod ureth PM line 4 (78009004) | LF | 1,120 | $2.00 | $2.00 | $2.00 | $2.00 |
| 111 | Mod ureth PM line 6 (78009006) | LF | 215 | $2.75 | $2.75 | $3.45 | $2.75 |
| 112 | Mod ureth PM line 12 (78009012) | LF | 430 | $4.00 | $4.00 | $6.75 | $4.00 |
| 113 | Mod ureth PM line 24 (78009024) | LF | 100 | $6.25 | $6.25 | $13.20 | $6.25 |
| 114 | Raised refl pavt MKR (78100100) | EACH | 650 | $36.00 | $36.00 | $54.00 | $36.00 |
| 115 | Raised ref PVT MK rem (78300200) | EACH | 650 | $12.25 | $10.63 | $18.00 | $20.00 |
| 116 | Undrgrd C galvs 2 (81028200) | LF | 55 | $130.85 | $65.50 | $73.00 | $130.85 |
| 117 | Handhole (81400100) | EACH | 1 | $1,959.05 | $3,200.00 | $3,600.00 | $1,959.05 |
| 118 | HD handhole (81400200) | EACH | 1 | $5,891.78 | $4,750.00 | $5,200.00 | $5,891.78 |
| 119 | Main EX TR sig instal (85000200) | EACH | 3 | $3,059.89 | $3,500.00 | $3,950.00 | $3,059.89 |
| 120 | Elcbl C signal 14 2C (87301215) | LF | 231 | $10.95 | $3.56 | $4.00 | $10.95 |
| 121 | Elcbl C lead 14 1PR (87301305) | LF | 163 | $11.14 | $4.50 | $5.10 | $11.14 |
| 122 | Elcbl C egrdc 6 1C (87301900) | LF | 168 | $11.72 | $4.25 | $4.75 | $11.72 |
| 123 | Drill EX handhole (87900200) | EACH | 2 | $451.29 | $650.00 | $725.00 | $451.29 |
| 124 | Det loop T1 (88600100) | LF | 1,468 | $31.78 | $32.54 | $36.50 | $31.78 |
| 125 | Remov EX TS equip (89502375) | EACH | 2 | $106.28 | $405.00 | $460.00 | $106.28 |
| 126 | Rebuild EX handhole (89502376) | EACH | 1 | $2,543.52 | $1,725.00 | $2,000.00 | $2,543.52 |
| 127 | Remov EX handhole (89502380) | EACH | 1 | $1,333.18 | $1,650.00 | $1,950.00 | $1,333.18 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of February 27, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.