IDOT contract 61M37 bid tabulation
Lombard, section 24-00170-00-RS. Let by Illinois DOT on April 24, 2026, Dupage, District 01. 4 bids received; low bid $1,684,000 by R. W. Dunteman Company.
- Owner
- Illinois DOT
- Letting
- 24 APR 2026
- Pay items
- 99
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | R. W. Dunteman Company | $1,684,000 | Low |
| 2 | K-Five Construction Corporation | $1,803,722 | +7.0% |
| 3 | Schroeder Asphalt Services, Inc. | $1,870,131 | +11% |
| 4 | A Lamp Concrete Contractors, Inc. | $2,078,943 | +23% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. R. W. Dunteman Company | 2. K-Five Construction Corporation | 3. Schroeder Asphalt Services, Inc. | 4. A Lamp Concrete Contractors, Inc. |
|---|---|---|---|---|---|---|---|
| 1 | T-ginkgo bil AG 2 (A2004512) | EACH | 2 | $1,000.00 | $1,000.00 | $1,825.00 | $1,000.00 |
| 2 | T-gymnocla dioe 2 (A2005037) | EACH | 2 | $600.00 | $600.00 | $1,625.00 | $600.00 |
| 3 | T-malus JFS KW213MX 2 (A2005470) | EACH | 5 | $450.00 | $450.00 | $1,625.00 | $450.00 |
| 4 | T-tilia tomen 2 (A2008316) | EACH | 1 | $550.00 | $550.00 | $1,625.00 | $550.00 |
| 5 | T-amelan laev CL 5' (B2000964) | EACH | 6 | $375.00 | $375.00 | $1,650.00 | $375.00 |
| 6 | T-syrg P WFH2 GRT W 2 (B2006135) | EACH | 4 | $500.00 | $500.00 | $1,650.00 | $500.00 |
| 7 | Preconstruct vid tap (XX003668) | LS | 1 | $1,745.00 | $6,385.00 | $1,200.00 | $1,745.00 |
| 8 | HMA drive rem & rep (XX006947) | SY | 185 | $70.50 | $90.00 | $40.00 | $86.00 |
| 9 | Relocate EX mailbox (X0327301) | EACH | 9 | $260.00 | $950.00 | $300.00 | $350.00 |
| 10 | PCC driveway PVT 6 SP (X4230710) | SY | 360 | $73.00 | $75.00 | $90.00 | $119.00 |
| 11 | PC conc sidewalk 5 SP (X4240430) | SF | 18,825 | $8.40 | $9.00 | $10.00 | $9.00 |
| 12 | PC conc sidewalk 6 SP (X4240440) | SF | 1,650 | $9.40 | $12.00 | $11.00 | $12.00 |
| 13 | FR & lids adjust SPL (X6030310) | EACH | 14 | $1,000.00 | $1,000.00 | $1,115.00 | $1,000.00 |
| 14 | FR & lids CL B (X6040610) | EACH | 6 | $1,700.00 | $450.00 | $1,900.00 | $1,700.00 |
| 15 | Temp info signing (X7200061) | SF | 50 | $25.00 | $25.00 | $16.50 | $35.00 |
| 16 | Construction layout (Z0013798) | LS | 1 | $40,250 | $96,000 | $9,000.00 | $6,500.00 |
| 17 | Drain util STR adj SP (Z0017500) | EACH | 45 | $1,000.00 | $1,000.00 | $1,125.00 | $1,000.00 |
| 18 | Drain util STR recon (Z0017700) | EACH | 10 | $1,400.00 | $1,800.00 | $1,600.00 | $1,400.00 |
| 19 | Sed cont DR ST inl CL (Z0023202) | EACH | 58 | $25.00 | $30.00 | $150.00 | $5.00 |
| 20 | Sed cont DR ST inl FR (Z0023203) | EACH | 58 | $175.00 | $180.00 | $170.00 | $15.00 |
| 21 | RR prot liability ins (Z0048665) | LS | 1 | $4,100.00 | $15,000 | $3,800.00 | $5,000.00 |
| 22 | Trainees (Z0076600) | HR | 500 | $0.80 | $0.80 | $0.80 | $0.80 |
| 23 | Trainees TPG (Z0076604) | HR | 500 | $15.00 | $15.00 | $15.00 | $15.00 |
| 24 | Tree remov 6-15 (20100110) | UNIT | 35 | $24.00 | $24.00 | $32.00 | $31.00 |
| 25 | Tree remov over 15 (20100210) | UNIT | 427 | $26.00 | $26.00 | $36.00 | $47.00 |
| 26 | Temporary fence (20101000) | LF | 750 | $3.20 | $3.20 | $8.00 | $4.00 |
| 27 | Tree root pruning (20101200) | EACH | 10 | $105.00 | $105.00 | $140.00 | $150.00 |
| 28 | Tree prun 1-10 (20101300) | EACH | 20 | $45.00 | $45.00 | $23.00 | $75.00 |
| 29 | Tree prun over 10 (20101350) | EACH | 20 | $95.00 | $95.00 | $140.00 | $200.00 |
| 30 | Earth excavation (20200100) | CY | 75 | $100.00 | $45.00 | $80.00 | $74.00 |
| 31 | Rem & disp uns matl (20201200) | CY | 265 | $10.00 | $75.00 | $70.00 | $10.00 |
| 32 | Trench backfill (20800150) | CY | 68 | $110.00 | $48.00 | $123.00 | $110.00 |
| 33 | Geotech fab F/GR stab (21001000) | SY | 176 | $3.50 | $7.50 | $4.00 | $3.00 |
| 34 | Topsoil F & P 4 (21101615) | SY | 3,388 | $0.10 | $0.10 | $0.15 | $0.10 |
| 35 | Seeding CL 1A (25000110) | ACRE | 1 | $4,840.00 | $4,840.00 | $2,500.00 | $4,840.00 |
| 36 | Nitrogen fert nutr (25000400) | LB | 63 | $1.00 | $1.00 | $2.00 | $1.00 |
| 37 | Potassium fert nutr (25000600) | LB | 63 | $1.00 | $1.00 | $2.00 | $1.00 |
| 38 | Erosion contr blanket (25100630) | SY | 3,388 | $8.00 | $8.00 | $12.50 | $8.00 |
| 39 | Supple watering (25200200) | UNIT | 60 | $0.10 | $0.10 | $28.00 | $0.10 |
| 40 | Perimeter eros bar (28000400) | LF | 533 | $6.50 | $6.50 | $4.45 | $6.50 |
| 41 | Agg subgrade improve (30300001) | CY | 176 | $10.00 | $85.00 | $70.00 | $20.00 |
| 42 | Agg base cse B 4 (35101600) | SY | 1,849 | $7.50 | $5.80 | $7.85 | $11.00 |
| 43 | Agg base cse B 6 (35101800) | SY | 180 | $13.50 | $40.00 | $14.00 | $18.50 |
| 44 | Agg base cse B 8 (35102000) | SY | 93 | $21.00 | $11.50 | $16.50 | $24.00 |
| 45 | Aggregate-temp access (40201000) | TON | 72 | $45.00 | $90.00 | $28.00 | $28.50 |
| 46 | Bit matls tack CT (40600290) | LB | 19,190 | $1.00 | $0.01 | $0.01 | $0.01 |
| 47 | Long joint sealant (40600370) | LF | 10,886 | $3.10 | $3.14 | $3.55 | $2.95 |
| 48 | Mix CR JTS flangewys (40600400) | TON | 18 | $400.00 | $50.00 | $300.00 | $150.00 |
| 49 | HMA surf rem butt JT (40600982) | SY | 539 | $15.00 | $0.01 | $16.50 | $23.00 |
| 50 | P HMA BC IL-4.75 N50 (40603200) | TON | 1,173 | $105.00 | $90.00 | $113.00 | $132.50 |
| 51 | HMA SC IL-9.5 D N50 (40604060) | TON | 3,184 | $92.00 | $90.00 | $92.50 | $101.00 |
| 52 | Protective coat (42001300) | SY | 3,744 | $0.10 | $1.00 | $1.20 | $2.00 |
| 53 | Detectable warnings (42400800) | SF | 460 | $35.00 | $36.00 | $39.00 | $35.00 |
| 54 | HMA surf rem 3 (44000161) | SY | 28,427 | $4.25 | $0.01 | $3.60 | $4.35 |
| 55 | Drive pavement rem (44000200) | SY | 360 | $23.50 | $17.00 | $17.00 | $21.75 |
| 56 | Comb curb gutter rem (44000500) | LF | 1,820 | $28.50 | $7.00 | $10.00 | $7.25 |
| 57 | Sidewalk rem (44000600) | SF | 16,200 | $2.90 | $2.00 | $1.70 | $1.85 |
| 58 | CL D patch T1 13 (44201798) | SY | 159 | $45.00 | $51.00 | $148.00 | $100.00 |
| 59 | CL D patch T2 13 (44201803) | SY | 440 | $35.00 | $51.00 | $142.00 | $90.00 |
| 60 | CL D patch T3 13 (44201807) | SY | 510 | $35.00 | $51.00 | $138.00 | $80.00 |
| 61 | CL D patch T4 13 (44201809) | SY | 651 | $35.00 | $51.00 | $138.00 | $70.00 |
| 62 | Storm sew CL A 1 12 (550A0050) | LF | 515 | $75.00 | $120.00 | $84.00 | $75.00 |
| 63 | Storm sewer rem 12 (55100500) | LF | 482 | $72.00 | $12.00 | $80.00 | $72.00 |
| 64 | Dom wat ser box adj (56500600) | EACH | 11 | $250.00 | $350.00 | $285.00 | $250.00 |
| 65 | Inlets TB T3F&G (60240220) | EACH | 2 | $3,500.00 | $2,900.00 | $3,900.00 | $3,500.00 |
| 66 | Man adj new T3F&G (60255900) | EACH | 1 | $1,300.00 | $1,250.00 | $1,475.00 | $1,300.00 |
| 67 | Valve box adj (60266600) | EACH | 2 | $250.00 | $300.00 | $285.00 | $250.00 |
| 68 | FR & grates T3 (60404300) | EACH | 17 | $750.00 | $475.00 | $840.00 | $750.00 |
| 69 | Conc curb TB (60600605) | LF | 95 | $41.50 | $20.00 | $51.00 | $52.50 |
| 70 | Comb CC&G TY B-6.24 (60605000) | LF | 1,820 | $10.00 | $39.50 | $56.00 | $70.00 |
| 71 | Non SPL waste disposl (66900200) | CY | 70 | $100.00 | $125.00 | $105.00 | $90.00 |
| 72 | Soil disposal analy (66900530) | EACH | 1 | $1,625.00 | $1,450.00 | $1,700.00 | $1,625.00 |
| 73 | Reg sub P-const plan (66901001) | LS | 1 | $3,400.00 | $3,100.00 | $3,500.00 | $3,400.00 |
| 74 | Reg sub F con report (66901003) | LS | 1 | $500.00 | $1,200.00 | $1,350.00 | $500.00 |
| 75 | Reg sub mon (66901006) | CAL DAY | 5 | $715.00 | $680.00 | $800.00 | $715.00 |
| 76 | Mobilization (67100100) | LS | 1 | $110,000 | $108,000 | $22,000 | $124,725 |
| 77 | TR cont & prot 701501 (70102620) | LS | 1 | $67,681 | $229,000 | $28,000 | $296,500 |
| 78 | TR cont & prot 701502 (70102622) | LS | 1 | $2,500.00 | $500.00 | $1,800.00 | $1.00 |
| 79 | TR cont & prot 701606 (70102625) | LS | 1 | $500.00 | $500.00 | $6,500.00 | $1.00 |
| 80 | TR cont & prot 701611 (70102634) | LS | 1 | $500.00 | $500.00 | $1.00 | $1.00 |
| 81 | TR cont & prot 701701 (70102635) | LS | 1 | $500.00 | $500.00 | $1.00 | $1.00 |
| 82 | TR cont & prot 701801 (70102640) | LS | 1 | $6,000.00 | $6,000.00 | $3,000.00 | $1.00 |
| 83 | Short term pavt mking (70300100) | LF | 7,485 | $1.00 | $1.00 | $2.00 | $0.01 |
| 84 | SHRT TRM pavt MK rem (70300150) | SF | 2,495 | $1.50 | $2.00 | $3.00 | $0.01 |
| 85 | Temp PVT MK LTR & sym paint (70300211) | SF | 440 | $1.80 | $1.80 | $1.15 | $0.01 |
| 86 | Temp PVT MK line 4 - paint (70300221) | LF | 35,610 | $0.40 | $0.40 | $0.36 | $0.01 |
| 87 | Temp PVT MK line 6 - paint (70300241) | LF | 8,655 | $0.60 | $0.60 | $0.43 | $0.01 |
| 88 | Temp PVT MK line 12 - paint (70300261) | LF | 2,355 | $0.80 | $0.80 | $1.15 | $0.01 |
| 89 | Temp PVT MK line 24 - paint (70300281) | LF | 600 | $1.80 | $1.80 | $2.05 | $0.01 |
| 90 | Sign panel T1 (72000100) | SF | 88 | $35.00 | $35.00 | $26.75 | $35.00 |
| 91 | Reloc sin pan assy TA (72400500) | EACH | 15 | $250.00 | $250.00 | $160.00 | $250.00 |
| 92 | Teles STL sin support (72800100) | LF | 200 | $20.00 | $20.00 | $20.00 | $35.00 |
| 93 | THPL PVT MK LTR & sym (78000100) | SF | 440 | $6.00 | $6.00 | $6.00 | $6.00 |
| 94 | THPL PVT MK line 4 (78000200) | LF | 11,870 | $1.00 | $1.00 | $0.96 | $1.00 |
| 95 | THPL PVT MK line 6 (78000400) | LF | 2,885 | $1.50 | $1.50 | $1.68 | $1.50 |
| 96 | THPL PVT MK line 12 (78000600) | LF | 785 | $3.00 | $3.00 | $2.55 | $3.00 |
| 97 | THPL PVT MK line 24 (78000650) | LF | 200 | $6.00 | $6.00 | $5.85 | $6.00 |
| 98 | PVT MKG rem WTR blast (78300202) | SF | 19,634 | $1.00 | $1.00 | $1.45 | $1.00 |
| 99 | Rebuild EX handhole (89502376) | EACH | 2 | $4,950.75 | $4,950.75 | $4,500.00 | $4,000.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of April 24, 2026. Compiled by Mirage Metrics.