IDOT contract 80B07 bid tabulation
Section 2025-1095-RS. Let by Illinois DOT on April 24, 2026, Dupage, District 01. 5 bids received; low bid $1,578,728 by Builders Paving, LLC.
- Owner
- Illinois DOT
- Letting
- 24 APR 2026
- Pay items
- 52
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Builders Paving, LLC | $1,578,728 | Low |
| 2 | K-Five Construction Corporation | $1,583,000 | 0.0% |
| 3 | D. Construction, Inc. | $1,704,810 | +8.0% |
| 4 | P. T. Ferro Construction Co. | $1,774,227 | +12% |
| 5 | R. W. Dunteman Company | $1,775,000 | +12% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Builders Paving, LLC | 2. K-Five Construction Corporation | 3. D. Construction, Inc. | 4. P. T. Ferro Construction Co. | 5. R. W. Dunteman Company |
|---|---|---|---|---|---|---|---|---|
| 1 | CC&G RMVL repl < = 10 (X4400501) | LF | 120 | $75.00 | $100.00 | $60.00 | $80.00 | $94.87 |
| 2 | CC&G RMVL repl > 10FT (X4400503) | LF | 325 | $65.00 | $80.00 | $50.00 | $70.00 | $70.20 |
| 3 | FR & lids adjust SPL (X6030310) | EACH | 65 | $1,500.00 | $1,125.00 | $850.00 | $0.01 | $1,100.00 |
| 4 | Engrs FLD ofc TY A D1 (X6700407) | CAL MO | 12 | $2,600.00 | $3,500.00 | $5,000.00 | $1.00 | $4,500.00 |
| 5 | Temp info signing (X7200061) | SF | 51.40 | $24.00 | $24.00 | $30.00 | $18.00 | $24.00 |
| 6 | Det loop repl (X8860105) | LF | 428 | $28.75 | $28.75 | $31.63 | $28.75 | $28.75 |
| 7 | Drainage STR cleaned (Z0018500) | EACH | 5 | $500.00 | $500.00 | $825.00 | $500.00 | $500.00 |
| 8 | Topsoil F & P 4 (21101615) | SY | 27 | $70.00 | $50.00 | $66.00 | $50.00 | $60.00 |
| 9 | Sodding salt tolerant (25200110) | SY | 27 | $45.00 | $50.00 | $209.00 | $50.00 | $190.00 |
| 10 | Supple watering (25200200) | UNIT | 1 | $350.00 | $446.00 | $44.00 | $500.00 | $40.00 |
| 11 | Perimeter eros bar (28000400) | LF | 60 | $10.00 | $25.00 | $22.00 | $10.00 | $20.00 |
| 12 | Inlet filters (28000510) | EACH | 25 | $200.00 | $200.00 | $275.00 | $0.01 | $175.00 |
| 13 | Bit matls PR CT (40600275) | LB | 25,410 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 14 | Bit matls tack CT (40600290) | LB | 22,866 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 15 | Long joint sealant (40600370) | LF | 18,152 | $2.75 | $2.82 | $2.67 | $3.25 | $2.58 |
| 16 | Mix CR JTS flangewys (40600400) | TON | 68 | $300.00 | $50.00 | $0.01 | $0.01 | $423.19 |
| 17 | HMA surf rem butt JT (40600982) | SY | 114 | $30.00 | $0.01 | $0.01 | $0.01 | $35.95 |
| 18 | HMA SC IL-9.5 D N50 (40604060) | TON | 2,530 | $77.00 | $54.90 | $84.00 | $110.00 | $81.79 |
| 19 | P HMA SC SMA 9.5 F N80 (40605026) | TON | 4,427 | $120.00 | $138.00 | $116.50 | $130.00 | $122.76 |
| 20 | Protective coat (42001300) | SY | 150 | $3.00 | $3.00 | $1.00 | $0.01 | $0.10 |
| 21 | HMA surf rem 1 3/4 (44000156) | SY | 45,167 | $6.00 | $3.25 | $2.00 | $3.00 | $2.90 |
| 22 | Median removal (44003100) | SF | 101,639 | $0.75 | $0.01 | $2.25 | $0.90 | $1.25 |
| 23 | CL D patch T1 14 (44201811) | SY | 113 | $60.00 | $40.00 | $155.00 | $200.00 | $198.51 |
| 24 | CL D patch T2 14 (44201815) | SY | 306 | $52.00 | $40.00 | $155.00 | $160.00 | $178.64 |
| 25 | CL D patch T3 14 (44201819) | SY | 678 | $48.00 | $40.00 | $145.00 | $140.00 | $170.48 |
| 26 | CL D patch T4 14 (44201821) | SY | 565 | $43.00 | $40.00 | $145.00 | $120.00 | $160.01 |
| 27 | Inlets reconst (60262700) | EACH | 2 | $800.00 | $800.00 | $2,000.00 | $1,500.00 | $1,000.00 |
| 28 | FR & lids adjust (60300305) | EACH | 5 | $485.00 | $450.00 | $600.00 | $1,000.00 | $450.00 |
| 29 | FR & lids T1 OL (60406000) | EACH | 1 | $460.00 | $470.00 | $600.00 | $1,500.00 | $470.00 |
| 30 | SPBGR TY A 6FT posts (63000001) | LF | 50 | $52.00 | $52.00 | $54.30 | $50.00 | $69.51 |
| 31 | Guardrail remov (63200310) | LF | 50 | $7.00 | $7.00 | $10.38 | $10.00 | $9.36 |
| 32 | Mobilization (67100100) | LS | 1 | $94,500 | $94,980 | $60,000 | $106,000 | $104,606 |
| 33 | Traf cont-prot 701421 (70100310) | LS | 1 | $750.00 | $500.00 | $71,496 | $33,000 | $23,000 |
| 34 | TR cont & prot 701606 (70102625) | LS | 1 | $1,500.00 | $1,000.00 | $0.01 | $33,000 | $1,000.00 |
| 35 | TR cont & prot 701601 (70102630) | LS | 1 | $13,250 | $219,650 | $0.01 | $33,000 | $8,500.00 |
| 36 | TR cont & prot 701611 (70102634) | LS | 1 | $150.00 | $100.00 | $0.01 | $33,000 | $100.00 |
| 37 | TR cont & prot 701701 (70102635) | LS | 1 | $375.00 | $250.00 | $0.01 | $33,000 | $250.00 |
| 38 | Short term pavt mking (70300100) | LF | 4,918 | $1.25 | $1.00 | $0.01 | $0.01 | $1.66 |
| 39 | SHRT TRM pavt MK rem (70300150) | SF | 1,640 | $0.01 | $2.00 | $0.01 | $0.01 | $1.81 |
| 40 | Temp PVT MK LTR & sym paint (70300211) | SF | 310 | $0.01 | $2.40 | $0.01 | $1.75 | $2.40 |
| 41 | Temp PVT MK line 4 - paint (70300221) | LF | 49,029 | $0.01 | $0.30 | $0.01 | $0.35 | $0.30 |
| 42 | Temp PVT MK line 6 - paint (70300241) | LF | 1,436 | $0.01 | $0.45 | $0.01 | $0.53 | $0.45 |
| 43 | Temp PVT MK line 12 - paint (70300261) | LF | 140 | $0.01 | $1.20 | $0.01 | $1.06 | $1.20 |
| 44 | Temp PVT MK line 24 - paint (70300281) | LF | 115 | $0.01 | $2.40 | $0.01 | $1.60 | $2.40 |
| 45 | THPL PVT MK LTR & sym (78000100) | SF | 310 | $5.75 | $5.50 | $7.15 | $6.00 | $5.75 |
| 46 | THPL PVT MK line 4 (78000200) | LF | 19,047 | $0.81 | $0.76 | $0.94 | $1.05 | $0.81 |
| 47 | THPL PVT MK line 6 (78000400) | LF | 1,436 | $1.25 | $1.25 | $1.32 | $1.30 | $1.25 |
| 48 | THPL PVT MK line 12 (78000600) | LF | 140 | $3.25 | $2.25 | $2.75 | $3.40 | $3.25 |
| 49 | THPL PVT MK line 24 (78000650) | LF | 115 | $5.75 | $5.50 | $6.60 | $6.00 | $5.75 |
| 50 | Raised refl pavt MKR (78100100) | EACH | 410 | $40.00 | $41.75 | $49.50 | $50.00 | $40.00 |
| 51 | Grdrail ref type A (78200005) | EACH | 2 | $10.00 | $10.00 | $16.50 | $15.00 | $13.37 |
| 52 | Raised ref PVT MK rem (78300200) | EACH | 410 | $15.00 | $0.01 | $8.00 | $0.01 | $11.81 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of April 24, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.