Section 2025-2015-RS,SW. Let by Illinois DOT on April 24, 2026, Cook, District 01. 3 bids received; low bid $6,442,571 by K-Five Construction Corporation.
- Owner
- Illinois DOT
- Letting
- 24 APR 2026
- Pay items
- 134
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | K-Five Construction Corporation | $6,442,571 | Low |
| 2 | Builders Paving, LLC | $6,454,148 | 0.0% |
| 3 | R. W. Dunteman Company | $6,593,500 | +2.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. K-Five Construction Corporation | 2. Builders Paving, LLC | 3. R. W. Dunteman Company |
|---|---|---|---|---|---|---|
| 1 | Weed cont broadlf TRF (K0029618) | GAL | 0.20 | $3,112.99 | $17,080 | $80,000 |
| 2 | Weed cont N sel/N res (K0029632) | GAL | 0.30 | $476.29 | $6,300.00 | $10,450 |
| 3 | Prun safety/equip CLR (K1004595) | LS | 1 | $7,678.70 | $2,000.00 | $3,300.00 |
| 4 | Weed CTRL NTV LSCP EN (X0327120) | ACRE | 0.80 | $1,265.95 | $4,035.00 | $3,900.00 |
| 5 | Ped signal post 5 FT (X1400378) | EACH | 15 | $1,112.31 | $1,100.00 | $1,071.94 |
| 6 | Rem EX ped push buttn (X1400423) | EACH | 19 | $71.63 | $70.00 | $69.03 |
| 7 | Selective clearing (X2010514) | ACRE | 0.80 | $10,377 | $10,000 | $750.00 |
| 8 | Temporary ramp SPL (X4060995) | SY | 1,195 | $73.78 | $10.00 | $24.49 |
| 9 | PC conc sidewalk 5 SP (X4240430) | SF | 174.50 | $16.79 | $20.00 | $22.00 |
| 10 | Curb rem & replacemt < = 10FT (X4400221) | LF | 280 | $78.70 | $53.00 | $78.79 |
| 11 | Curb rem&repl > 10FT (X4400223) | LF | 5,689 | $70.31 | $53.00 | $53.53 |
| 12 | HMA surf rem var DP (X4401198) | SY | 61.50 | $5.50 | $30.00 | $21.73 |
| 13 | SS cleaned 12 (X5537800) | LF | 300 | $1.04 | $2.00 | $2.00 |
| 14 | FR & lids adjust SPL (X6030310) | EACH | 135 | $1,141.43 | $1,025.00 | $1,025.00 |
| 15 | Engrs FLD ofc TY A D1 (X6700407) | CAL MO | 6 | $3,200.00 | $4,000.00 | $4,000.00 |
| 16 | Temp info signing (X7200061) | SF | 102.80 | $18.68 | $16.00 | $16.00 |
| 17 | Handhole to BE adjust (X8140115) | EACH | 11 | $2,401.11 | $2,400.00 | $2,313.96 |
| 18 | Accessible ped signal (X8760200) | EACH | 53 | $1,919.65 | $1,900.00 | $1,849.98 |
| 19 | Conc FDN TY A 12D (X8780012) | LF | 60 | $343.89 | $335.00 | $331.41 |
| 20 | Det loop repl (X8860105) | LF | 7,500 | $26.10 | $25.15 | $25.15 |
| 21 | Construction layout (Z0013798) | LS | 1 | $130,000 | $30,000 | $45,000 |
| 22 | Drainage STR cleaned (Z0018500) | EACH | 20 | $363.18 | $350.00 | $350.00 |
| 23 | RE-optimize TR sig sys 1 (Z0033044) | EACH | 8 | $770.66 | $720.00 | $720.00 |
| 24 | Trainees (Z0076600) | HR | 1,000 | $0.80 | $0.80 | $0.80 |
| 25 | Trainees TPG (Z0076604) | HR | 1,000 | $15.00 | $15.00 | $15.00 |
| 26 | Temporary fence (20101000) | LF | 400 | $3.11 | $6.00 | $3.20 |
| 27 | Tree root pruning (20101200) | EACH | 10 | $88.20 | $200.00 | $105.00 |
| 28 | Nitrogen fert nutr (20101400) | LB | 12 | $3.00 | $3.00 | $4.50 |
| 29 | Phosphorus fert nutr (20101500) | LB | 12 | $3.00 | $3.00 | $4.50 |
| 30 | Potassium fert nutr (20101600) | LB | 12 | $3.00 | $3.00 | $4.50 |
| 31 | Earth excavation (20200100) | CY | 351 | $49.81 | $65.00 | $44.56 |
| 32 | Topsoil F & P 4 (21101615) | SY | 3,507 | $6.00 | $8.75 | $8.00 |
| 33 | Interseed CL 2A (25003210) | ACRE | 1.40 | $1,987.12 | $4,120.00 | $2,950.00 |
| 34 | Interseed CL 4A (25003312) | ACRE | 0.80 | $2,245.50 | $3,970.00 | $5,000.00 |
| 35 | Sodding salt tolerant (25200110) | SY | 3,507 | $22.83 | $17.50 | $13.00 |
| 36 | Supple watering (25200200) | UNIT | 7 | $0.01 | $40.00 | $1.00 |
| 37 | Sub gran mat B 4 (31101200) | SY | 59 | $15.00 | $30.00 | $22.00 |
| 38 | HMA base cse 6 (35501308) | SY | 11.10 | $237.27 | $160.00 | $185.00 |
| 39 | HMA base cse 8 (35501316) | SY | 8.90 | $237.27 | $200.00 | $230.00 |
| 40 | Bit matls tack CT (40600290) | LB | 56,649 | $0.01 | $0.01 | $1.00 |
| 41 | Long joint sealant (40600370) | LF | 52,645 | $3.36 | $2.75 | $2.94 |
| 42 | Mix CR JTS flangewys (40600400) | TON | 74 | $690.00 | $725.00 | $445.00 |
| 43 | HMA surf rem butt JT (40600982) | SY | 875 | $27.69 | $15.00 | $23.50 |
| 44 | HMA repl over patch (40601005) | TON | 272 | $67.00 | $65.00 | $137.00 |
| 45 | HMA BC IL-9.5 N70 (40602985) | TON | 5,430 | $91.39 | $87.00 | $105.00 |
| 46 | P HMA BC IL-4.75 N50 (40603200) | TON | 1,463 | $138.41 | $110.00 | $128.00 |
| 47 | P HMA SC IL-9.5 E N70 (40604172) | TON | 8,225 | $116.24 | $110.00 | $124.00 |
| 48 | Protective coat (42001300) | SY | 2,028 | $1.00 | $0.01 | $1.00 |
| 49 | PCC driveway pavt 6 (42300200) | SY | 22.20 | $93.08 | $160.00 | $160.00 |
| 50 | PCC driveway pavt 8 (42300400) | SY | 22.20 | $125.30 | $160.00 | $170.00 |
| 51 | PC conc sidewalk 5 (42400200) | SF | 20,058 | $13.12 | $10.00 | $9.40 |
| 52 | Detectable warnings (42400800) | SF | 2,004 | $39.88 | $40.00 | $35.00 |
| 53 | HMA surf rem 2 1/2 (44000159) | SY | 35,447 | $4.89 | $4.50 | $5.50 |
| 54 | HMA surf rem 3 3/4 (44000164) | SY | 48,474 | $5.88 | $10.00 | $6.90 |
| 55 | Drive pavement rem (44000200) | SY | 3,026 | $17.00 | $17.00 | $18.50 |
| 56 | Comb curb gutter rem (44000500) | LF | 7,063 | $7.35 | $15.00 | $9.25 |
| 57 | Sidewalk rem (44000600) | SF | 20,588 | $2.62 | $5.00 | $2.25 |
| 58 | HMA RM OV patch 2 1/2 (44002210) | SY | 1,774 | $6.30 | $5.00 | $12.50 |
| 59 | CL D patch T1 9 (44201749) | SY | 89 | $46.00 | $60.00 | $120.00 |
| 60 | CL D patch T2 9 (44201753) | SY | 709 | $44.00 | $60.00 | $110.00 |
| 61 | CL D patch T3 9 (44201757) | SY | 532 | $43.00 | $60.00 | $100.00 |
| 62 | CL D patch T4 9 (44201759) | SY | 444 | $42.00 | $60.00 | $90.00 |
| 63 | CL D patch T1 10 (44201761) | SY | 133 | $51.00 | $65.00 | $115.00 |
| 64 | CL D patch T2 10 (44201765) | SY | 1,038 | $49.00 | $65.00 | $100.00 |
| 65 | CL D patch T3 10 (44201769) | SY | 827 | $48.00 | $65.00 | $90.00 |
| 66 | CL D patch T4 10 (44201771) | SY | 606 | $47.00 | $65.00 | $80.00 |
| 67 | CL D patch T1 13 (44201798) | SY | 278 | $130.00 | $85.00 | $150.00 |
| 68 | CL D patch T2 13 (44201803) | SY | 1,511 | $128.00 | $85.00 | $130.00 |
| 69 | CL D patch T3 13 (44201807) | SY | 1,166 | $127.00 | $85.00 | $115.00 |
| 70 | CL D patch T4 13 (44201809) | SY | 889 | $126.00 | $85.00 | $100.00 |
| 71 | Fire hydnts to BE adj (56400300) | EACH | 1 | $2,833.32 | $1,850.00 | $1,850.00 |
| 72 | CB adjust (60250200) | EACH | 56 | $472.22 | $450.00 | $450.00 |
| 73 | CB reconst (60252800) | EACH | 7 | $1,679.01 | $1,000.00 | $1,100.00 |
| 74 | Man adjust (60255500) | EACH | 5 | $577.16 | $450.00 | $450.00 |
| 75 | Man reconst (60257900) | EACH | 5 | $1,679.01 | $1,150.00 | $1,250.00 |
| 76 | Inlets adjust (60260100) | EACH | 6 | $472.22 | $450.00 | $450.00 |
| 77 | VV adjust (60265700) | EACH | 9 | $524.69 | $450.00 | $450.00 |
| 78 | FR & grates adjust (60300105) | EACH | 5 | $524.69 | $450.00 | $450.00 |
| 79 | FR & lids adjust (60300305) | EACH | 4 | $524.69 | $450.00 | $450.00 |
| 80 | Frames T24 (60401040) | EACH | 10 | $498.46 | $450.00 | $450.00 |
| 81 | FR & grates T11 (60404800) | EACH | 5 | $640.12 | $650.00 | $650.00 |
| 82 | FR & grates T24 (60404950) | EACH | 5 | $498.46 | $450.00 | $485.00 |
| 83 | FR & lids T1 OL (60406000) | EACH | 7 | $445.99 | $450.00 | $450.00 |
| 84 | FR & lids T1 ADA compl OL (60406001) | EACH | 2 | $445.99 | $450.00 | $450.00 |
| 85 | FR & lids T1 CL (60406100) | EACH | 9 | $445.99 | $450.00 | $450.00 |
| 86 | Comb CC&G TB6.12 (60603800) | LF | 7,057 | $35.68 | $30.00 | $33.25 |
| 87 | Non SPL waste disposl (66900200) | CY | 355 | $75.00 | $125.00 | $109.00 |
| 88 | Soil disposal analy (66900530) | EACH | 3 | $1,300.00 | $1,100.00 | $1,100.00 |
| 89 | Reg sub P-const plan (66901001) | LS | 1 | $6,500.00 | $5,900.00 | $5,900.00 |
| 90 | Reg sub F con report (66901003) | LS | 1 | $750.00 | $500.00 | $500.00 |
| 91 | Reg sub mon (66901006) | CAL DAY | 70.50 | $350.00 | $100.00 | $665.00 |
| 92 | Mobilization (67100100) | LS | 1 | $400,000 | $832,656 | $395,526 |
| 93 | TR cont & prot 701606 (70102626) | EACH | 1 | $235,000 | $200,000 | $84,000 |
| 94 | TR cont & prot 701602 (70102632) | LS | 1 | $1.00 | $1,000.00 | $50,000 |
| 95 | TR cont & prot 701701 (70102635) | LS | 1 | $1,000.00 | $1,000.00 | $65,000 |
| 96 | TR cont & prot 701801 (70102640) | LS | 1 | $25,000 | $10,000 | $20,000 |
| 97 | Short term pavt mking (70300100) | LF | 14,300 | $0.01 | $0.01 | $1.19 |
| 98 | SHRT TRM pavt MK rem (70300150) | SF | 13,107 | $0.01 | $0.01 | $1.13 |
| 99 | Temp PVT MK LTR & sym paint (70300211) | SF | 549 | $0.01 | $2.00 | $2.00 |
| 100 | Temp PVT MK line 4 - paint (70300221) | LF | 71,382 | $0.01 | $0.30 | $0.30 |
| 101 | Temp PVT MK line 6 - paint (70300241) | LF | 3,712 | $0.01 | $0.45 | $0.45 |
| 102 | Temp PVT MK line 8 - paint (70300251) | LF | 1,154 | $0.01 | $0.60 | $0.60 |
| 103 | Temp PVT MK line 12 - paint (70300261) | LF | 12,370 | $0.01 | $0.90 | $0.90 |
| 104 | Temp PVT MK line 24 - paint (70300281) | LF | 2,246 | $0.01 | $1.80 | $1.80 |
| 105 | Temp PVT MK L4 T4 tape (70307120) | LF | 39,320 | $0.01 | $0.01 | $1.35 |
| 106 | Rem & rel sign panel asmbly TA (72400205) | EACH | 1 | $778.25 | $450.00 | $450.00 |
| 107 | THPL PVT MK LTR & sym (78000100) | SF | 546 | $5.25 | $5.00 | $5.25 |
| 108 | THPL PVT MK line 4 (78000200) | LF | 39,320 | $0.88 | $0.65 | $0.88 |
| 109 | THPL PVT MK line 6 (78000400) | LF | 1,856 | $1.26 | $1.25 | $1.26 |
| 110 | THPL PVT MK line 8 (78000500) | LF | 577 | $1.67 | $2.00 | $1.67 |
| 111 | THPL PVT MK line 12 (78000600) | LF | 6,185 | $2.61 | $2.50 | $2.61 |
| 112 | THPL PVT MK line 24 (78000650) | LF | 1,123 | $5.25 | $5.00 | $5.25 |
| 113 | Mod ureth PM LTR-sym (78009000) | SF | 182 | $6.15 | $6.00 | $6.15 |
| 114 | Mod ureth PM line 4 (78009004) | LF | 12,916 | $1.00 | $0.75 | $1.01 |
| 115 | Mod ureth PM line 6 (78009006) | LF | 667 | $1.58 | $2.00 | $1.58 |
| 116 | Mod ureth PM line 12 (78009012) | LF | 2,656 | $3.00 | $3.00 | $2.99 |
| 117 | Mod ureth PM line 24 (78009024) | LF | 681 | $6.15 | $6.00 | $6.15 |
| 118 | Raised refl pavt MKR (78100100) | EACH | 1,653 | $37.00 | $36.00 | $37.00 |
| 119 | Raised ref PVT MK rem (78300200) | EACH | 1,653 | $9.00 | $5.00 | $14.65 |
| 120 | Undrgrd C galvs 2 (81028200) | LF | 396 | $67.11 | $63.00 | $62.70 |
| 121 | HD handhole (81400200) | EACH | 5 | $6,060.00 | $5,700.00 | $5,661.61 |
| 122 | Main EX TR sig instal (85000200) | EACH | 10 | $3,691.73 | $3,500.00 | $3,449.03 |
| 123 | Elcbl C signal 14 2C (87301215) | LF | 3,637 | $4.90 | $4.60 | $4.58 |
| 124 | Elcbl C lead 14 1PR (87301305) | LF | 2,438 | $5.11 | $4.80 | $4.77 |
| 125 | Drill EX handhole (87900200) | EACH | 16 | $456.69 | $430.00 | $426.67 |
| 126 | SH LED 1F 3S mam (88030020) | EACH | 4 | $867.20 | $820.00 | $810.19 |
| 127 | SH LED 1F 3S BM (88030050) | EACH | 1 | $682.23 | $640.00 | $637.38 |
| 128 | SH LED 1F 4S BM (88030070) | EACH | 1 | $793.45 | $745.00 | $741.29 |
| 129 | Inductive loop detect (88500100) | EACH | 6 | $219.15 | $205.00 | $204.74 |
| 130 | Det loop T1 (88600100) | LF | 4,267 | $26.92 | $25.15 | $25.15 |
| 131 | Mod EX contr cab (89502210) | EACH | 5 | $1,258.53 | $1,200.00 | $1,175.79 |
| 132 | Rem elcbl FR con (89502300) | LF | 48.50 | $0.15 | $0.15 | $0.14 |
| 133 | Remov EX TS equip (89502375) | EACH | 11 | $0.01 | $0.01 | $0.01 |
| 134 | Rebuild EX handhole (89502376) | EACH | 1 | $2,326.55 | $2,200.00 | $2,173.60 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of April 24, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.