IDOT contract 80B28 bid tabulation
Section 2025-2009-RS. Let by Illinois DOT on June 12, 2026, Cook, District 01. 5 bids received; low bid $3,929,710 by K-Five Construction Corporation.
- Owner
- Illinois DOT
- Letting
- 12 JUN 2026
- Pay items
- 125
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | K-Five Construction Corporation | $3,929,710 | Low |
| 2 | Builders Paving, LLC | $3,949,808 | +1.0% |
| 3 | Plote Construction, Inc. | $4,191,499 | +7.0% |
| 4 | R. W. Dunteman Company | $4,397,730 | +12% |
| 5 | Acura Inc. | $4,626,241 | +18% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. K-Five Construction Corporation | 2. Builders Paving, LLC | 3. Plote Construction, Inc. | 4. R. W. Dunteman Company | 5. Acura Inc. |
|---|---|---|---|---|---|---|---|---|
| 1 | Tree care (K0026700) | EACH | 23 | $200.00 | $500.00 | $120.00 | $120.00 | $250.00 |
| 2 | Mulch placement 4 (K0036120) | SY | 54 | $11.00 | $30.00 | $14.00 | $14.00 | $60.00 |
| 3 | Constructn layout SPL (X0320050) | LS | 1 | $50,000 | $9,500.00 | $9,500.00 | $9,500.00 | $50,000 |
| 4 | EM veh P S LSC 20 3C (X0324085) | LF | 482 | $1.68 | $1.68 | $1.68 | $1.68 | $1.68 |
| 5 | Ped signal post 5 FT (X1400378) | EACH | 4 | $1,173.60 | $1,173.60 | $1,173.60 | $1,173.60 | $1,173.60 |
| 6 | Selective clearing (X2010516) | UNIT | 3 | $1,000.00 | $1,000.00 | $1,600.00 | $1,600.00 | $1,500.00 |
| 7 | PCC surf rem var DP (X4400100) | SY | 763 | $8.00 | $25.00 | $16.00 | $12.00 | $40.00 |
| 8 | Island removal (X4402805) | SF | 2,588 | $8.00 | $7.50 | $5.00 | $5.00 | $10.00 |
| 9 | Flex delineators (X6350108) | EACH | 5 | $100.00 | $100.00 | $100.00 | $100.00 | $95.00 |
| 10 | Delineator removal (X6350120) | EACH | 3 | $35.00 | $35.00 | $40.00 | $100.00 | $40.00 |
| 11 | Engrs FLD ofc TY A D1 (X6700407) | CAL MO | 12 | $3,500.00 | $3,500.00 | $4,500.00 | $3,500.00 | $5,500.00 |
| 12 | TR C-prot expressways (X7011015) | LS | 1 | $1.00 | $10,000 | $12,000 | $17,600 | $125,000 |
| 13 | Temp info signing (X7200061) | SF | 148 | $15.00 | $15.00 | $20.00 | $15.00 | $16.00 |
| 14 | Accessible ped signal (X8760200) | EACH | 6 | $3,192.56 | $3,192.56 | $3,192.56 | $3,192.56 | $3,192.56 |
| 15 | Conc FDN TY A 12D (X8780012) | LF | 16 | $457.05 | $457.05 | $457.05 | $457.05 | $457.05 |
| 16 | Det loop repl (X8860105) | LF | 1,865 | $22.33 | $22.33 | $22.33 | $22.33 | $22.33 |
| 17 | Drainage STR cleaned (Z0018500) | EACH | 99 | $350.00 | $325.00 | $315.00 | $312.00 | $375.00 |
| 18 | RE-optimize TR sig sys 1 (Z0033044) | EACH | 2 | $1,728.00 | $1,728.00 | $1,728.00 | $1,728.00 | $1,728.00 |
| 19 | Trainees (Z0076600) | HR | 500 | $0.80 | $0.80 | $0.80 | $0.80 | $0.80 |
| 20 | Trainees TPG (Z0076604) | HR | 500 | $15.00 | $15.00 | $15.00 | $15.00 | $15.00 |
| 21 | Tree trunk protection (20101100) | EACH | 14 | $150.00 | $300.00 | $190.00 | $190.00 | $150.00 |
| 22 | Tree root pruning (20101200) | EACH | 14 | $85.00 | $300.00 | $180.00 | $180.00 | $370.00 |
| 23 | Tree prun 1-10 (20101300) | EACH | 2 | $125.00 | $125.00 | $250.00 | $250.00 | $1,000.00 |
| 24 | Tree prun over 10 (20101350) | EACH | 1 | $325.00 | $325.00 | $500.00 | $500.00 | $2,000.00 |
| 25 | Nitrogen fert nutr (20101400) | LB | 38 | $3.00 | $10.00 | $3.00 | $3.00 | $10.00 |
| 26 | Potassium fert nutr (20101600) | LB | 38 | $3.00 | $10.00 | $3.00 | $3.00 | $10.00 |
| 27 | Earth excavation (20200100) | CY | 38 | $65.37 | $130.00 | $115.00 | $85.00 | $55.00 |
| 28 | Rem & disp uns matl (20201200) | CY | 294 | $72.00 | $83.50 | $20.00 | $62.00 | $55.00 |
| 29 | Furnished excavation (20400800) | CY | 2.20 | $250.00 | $305.00 | $200.00 | $120.00 | $550.00 |
| 30 | Geotech fab F/GR stab (21001000) | SY | 882 | $1.10 | $2.25 | $1.00 | $3.60 | $4.50 |
| 31 | Topsoil F & P 4 (21101615) | SY | 2,053 | $6.00 | $6.50 | $10.00 | $10.00 | $9.00 |
| 32 | Sodding salt tolerant (25200110) | SY | 2,053 | $21.00 | $16.00 | $18.00 | $18.00 | $14.00 |
| 33 | Supple watering (25200200) | UNIT | 17 | $0.01 | $100.00 | $40.00 | $40.00 | $100.00 |
| 34 | Inlet filters (28000510) | EACH | 104 | $165.00 | $150.00 | $140.00 | $140.00 | $165.00 |
| 35 | Agg subgrade improve (30300001) | CY | 294 | $72.00 | $65.50 | $20.00 | $75.00 | $50.00 |
| 36 | Sub gran mat B 4 (31101200) | SY | 2,221 | $10.15 | $12.00 | $11.00 | $11.50 | $12.00 |
| 37 | Bit matls tack CT (40600290) | LB | 38,552 | $0.01 | $0.01 | $0.01 | $1.00 | $1.50 |
| 38 | Long joint sealant (40600370) | LF | 28,694 | $3.13 | $3.09 | $3.55 | $3.15 | $3.50 |
| 39 | Mix CR JTS flangewys (40600400) | TON | 20 | $100.00 | $840.00 | $1,200.00 | $516.00 | $900.00 |
| 40 | PCC surf rem butt JT (40600985) | SY | 1,770 | $8.00 | $5.00 | $25.00 | $24.00 | $5.00 |
| 41 | P HMA BC IL-4.75 N50 (40603200) | TON | 3,198 | $124.00 | $110.72 | $120.00 | $127.00 | $120.00 |
| 42 | P HMA SC IL-9.5 E N70 (40604172) | TON | 5,597 | $121.00 | $111.39 | $110.00 | $124.00 | $122.00 |
| 43 | Protective coat (42001300) | SY | 2,787 | $0.01 | $0.01 | $0.01 | $1.00 | $0.01 |
| 44 | PCC driveway pavt 8 (42300400) | SY | 426 | $100.65 | $90.00 | $98.00 | $95.00 | $90.00 |
| 45 | PC conc sidewalk 5 (42400200) | SF | 1,262 | $8.14 | $12.00 | $17.00 | $10.50 | $12.00 |
| 46 | Detectable warnings (42400800) | SF | 92 | $28.06 | $36.00 | $34.00 | $42.50 | $36.00 |
| 47 | Drive pavement rem (44000200) | SY | 420 | $23.00 | $20.00 | $45.00 | $35.00 | $20.00 |
| 48 | Comb curb gutter rem (44000500) | LF | 17,886 | $8.00 | $6.50 | $8.50 | $9.40 | $7.50 |
| 49 | Sidewalk rem (44000600) | SF | 1,083 | $2.90 | $3.00 | $11.00 | $2.75 | $3.00 |
| 50 | Median removal (44003100) | SF | 31,760 | $2.45 | $1.95 | $3.50 | $3.20 | $3.25 |
| 51 | Median removal (PD) (44003510) | SF | 5,482 | $1.50 | $1.50 | $3.30 | $2.80 | $2.50 |
| 52 | Paved SHLD removal (44004250) | SY | 670 | $20.00 | $14.50 | $17.50 | $22.00 | $30.00 |
| 53 | CL D patch T1 10 (44201761) | SY | 254 | $45.00 | $190.00 | $120.00 | $195.00 | $230.00 |
| 54 | CL D patch T2 10 (44201765) | SY | 254 | $45.00 | $170.00 | $120.00 | $150.00 | $205.00 |
| 55 | CL D patch T3 10 (44201769) | SY | 1,269 | $45.00 | $140.00 | $120.00 | $108.50 | $165.00 |
| 56 | CL D patch T4 10 (44201771) | SY | 2,172 | $45.00 | $130.00 | $120.00 | $93.50 | $160.00 |
| 57 | HMA shoulders 6 (48203021) | SY | 576 | $58.00 | $45.00 | $63.00 | $61.00 | $56.00 |
| 58 | Water valves adjust (56109210) | EACH | 1 | $360.00 | $455.00 | $440.00 | $450.00 | $750.00 |
| 59 | CB adjust (60250200) | EACH | 99 | $450.00 | $455.00 | $440.00 | $450.00 | $600.00 |
| 60 | CB reconst (60252800) | EACH | 1 | $1,250.00 | $1,200.00 | $1,125.00 | $1,150.00 | $1,500.00 |
| 61 | Man adjust (60255500) | EACH | 3 | $550.00 | $450.00 | $440.00 | $440.00 | $750.00 |
| 62 | Inlets reconst (60262700) | EACH | 1 | $880.00 | $1,250.00 | $1,250.00 | $1,250.00 | $1,000.00 |
| 63 | FR & lids adjust (60300305) | EACH | 68 | $1,125.00 | $450.00 | $440.00 | $450.00 | $1,200.00 |
| 64 | Comb CC&G TB6.12 (60603800) | LF | 5,128 | $36.00 | $30.00 | $38.50 | $35.00 | $35.00 |
| 65 | Comb CC&G TY B-6.24 (60605000) | LF | 11,791 | $37.00 | $30.00 | $49.00 | $46.00 | $35.00 |
| 66 | Conc median surf 4 (60618300) | SF | 19,988 | $7.00 | $9.00 | $4.45 | $8.00 | $9.00 |
| 67 | Corrugated med (60624600) | SF | 64 | $8.06 | $35.00 | $43.00 | $44.00 | $27.00 |
| 68 | SPBGR TY A 6FT posts (63000001) | LF | 1,400 | $29.00 | $29.00 | $36.69 | $29.00 | $40.00 |
| 69 | Traf bar term T2 (63100045) | EACH | 2 | $2,200.00 | $2,200.00 | $1,743.00 | $2,200.00 | $1,750.00 |
| 70 | TR bar TRM T1 SPL tan (63100167) | EACH | 3 | $3,860.00 | $3,860.00 | $3,617.00 | $3,860.00 | $3,750.00 |
| 71 | Guardrail remov (63200310) | LF | 1,582 | $5.00 | $5.00 | $7.22 | $5.00 | $7.50 |
| 72 | Shoulder rum strip 16 (64200116) | LF | 1,952 | $3.59 | $11.50 | $6.00 | $4.00 | $7.50 |
| 73 | Non SPL waste disposl (66900200) | CY | 40 | $110.00 | $105.00 | $160.00 | $100.00 | $105.00 |
| 74 | Soil disposal analy (66900530) | EACH | 1 | $1,450.00 | $1,660.00 | $1,660.00 | $1,660.00 | $3,200.00 |
| 75 | Reg sub P-const plan (66901001) | LS | 1 | $3,100.00 | $3,150.00 | $3,150.00 | $3,150.00 | $5,000.00 |
| 76 | Reg sub F con report (66901003) | LS | 1 | $1,200.00 | $500.00 | $500.00 | $500.00 | $1,000.00 |
| 77 | Reg sub mon (66901006) | CAL DAY | 5 | $680.00 | $765.00 | $765.00 | $765.00 | $1,500.00 |
| 78 | Mobilization (67100100) | LS | 1 | $200,000 | $296,355 | $260,000 | $265,900 | $277,574 |
| 79 | TR cont & prot 701601 (70102630) | LS | 1 | $372,000 | $160,000 | $75,000 | $200,000 | $92,500 |
| 80 | TR cont & prot 701602 (70102632) | LS | 1 | $6,130.00 | $6,130.00 | $1,000.00 | $6,130.00 | $1,000.00 |
| 81 | TR cont & prot 701701 (70102635) | LS | 1 | $6,130.00 | $6,130.00 | $35,000 | $6,130.00 | $1,000.00 |
| 82 | TR cont & prot 701801 (70102640) | LS | 1 | $6,130.00 | $6,130.00 | $35,000 | $6,130.00 | $5,000.00 |
| 83 | TR cont surveillance (70103815) | CAL DAY | 65 | $200.00 | $200.00 | $500.00 | $200.00 | $300.00 |
| 84 | Night work zone light (70200100) | LS | 1 | $1,000.00 | $5,000.00 | $16,000 | $16,000 | $1.00 |
| 85 | Short term pavt mking (70300100) | LF | 16,775 | $0.01 | $0.01 | $0.01 | $0.90 | $0.10 |
| 86 | SHRT TRM pavt MK rem (70300150) | SF | 8,312 | $0.01 | $0.01 | $0.01 | $1.10 | $0.10 |
| 87 | Temp PVT MK LTR & sym paint (70300211) | SF | 1,596 | $0.01 | $0.01 | $0.01 | $1.75 | $2.16 |
| 88 | Temp PVT MK line 4 - paint (70300221) | LF | 16,381 | $0.01 | $0.01 | $0.01 | $0.35 | $0.36 |
| 89 | Temp PVT MK line 6 - paint (70300241) | LF | 3,777 | $0.01 | $0.01 | $0.01 | $0.53 | $0.54 |
| 90 | Temp PVT MK line 8 - paint (70300251) | LF | 1,572 | $0.01 | $0.01 | $0.01 | $0.70 | $0.75 |
| 91 | Temp PVT MK line 12 - paint (70300261) | LF | 2,121 | $0.01 | $0.01 | $0.01 | $1.06 | $1.08 |
| 92 | Temp PVT MK line 24 - paint (70300281) | LF | 738 | $0.01 | $0.01 | $0.01 | $1.60 | $2.16 |
| 93 | Temp PVT MK L4 T4 tape (70307120) | LF | 24,935 | $0.01 | $0.01 | $0.01 | $1.25 | $1.40 |
| 94 | Sign panel T1 (72000100) | SF | 64 | $40.00 | $40.00 | $35.00 | $40.00 | $38.00 |
| 95 | Teles STL sin support (72800100) | LF | 90 | $18.00 | $18.00 | $20.00 | $18.00 | $22.00 |
| 96 | THPL PVT MK LTR & sym (78000100) | SF | 1,596 | $6.05 | $6.05 | $6.00 | $6.05 | $5.00 |
| 97 | THPL PVT MK line 4 (78000200) | LF | 16,381 | $0.80 | $0.80 | $0.85 | $0.80 | $0.70 |
| 98 | THPL PVT MK line 6 (78000400) | LF | 3,777 | $0.90 | $0.90 | $1.30 | $0.90 | $1.00 |
| 99 | THPL PVT MK line 8 (78000500) | LF | 1,572 | $1.95 | $1.95 | $1.75 | $1.95 | $2.00 |
| 100 | THPL PVT MK line 12 (78000600) | LF | 2,121 | $3.00 | $3.00 | $2.65 | $3.00 | $2.50 |
| 101 | THPL PVT MK line 24 (78000650) | LF | 738 | $6.05 | $6.05 | $6.00 | $6.05 | $6.00 |
| 102 | Pref PL PM TD STD L4 (78004620) | LF | 4,109 | $5.50 | $5.50 | $5.00 | $5.50 | $7.00 |
| 103 | GRV RCSD PVT MRKG 5 (78011025) | LF | 4,109 | $2.00 | $2.00 | $1.25 | $2.00 | $0.50 |
| 104 | Raised refl pavt MKR (78100100) | EACH | 664 | $32.00 | $32.00 | $45.00 | $32.00 | $36.60 |
| 105 | Raised ref PVT MK rem (78300200) | EACH | 664 | $5.00 | $15.00 | $12.00 | $24.60 | $20.00 |
| 106 | Undrgrd C galvs 2 (81028200) | LF | 400 | $45.88 | $45.88 | $45.88 | $45.88 | $45.88 |
| 107 | Undrgrd C galvs 4 (81028240) | LF | 310 | $67.52 | $67.52 | $67.52 | $67.52 | $67.52 |
| 108 | HD handhole (81400200) | EACH | 4 | $5,479.03 | $5,479.03 | $5,479.03 | $5,479.03 | $5,479.03 |
| 109 | Main EX TR sig instal (85000200) | EACH | 2 | $2,920.45 | $2,920.45 | $2,920.45 | $2,920.45 | $2,920.45 |
| 110 | Elcbl C signal 14 2C (87301215) | LF | 1,186 | $1.85 | $1.85 | $1.85 | $1.85 | $1.85 |
| 111 | Elcbl C signal 14 3C (87301225) | LF | 712 | $2.10 | $2.10 | $2.10 | $2.10 | $2.10 |
| 112 | Elcbl C signal 14 5C (87301245) | LF | 2,204 | $2.55 | $2.55 | $2.55 | $2.55 | $2.55 |
| 113 | Elcbl C signal 14 7C (87301255) | LF | 1,930 | $3.00 | $3.00 | $3.00 | $3.00 | $3.00 |
| 114 | Elcbl C lead 14 1PR (87301305) | LF | 3,957 | $2.08 | $2.08 | $2.08 | $2.08 | $2.08 |
| 115 | Elcbl C egrdc 6 1C (87301900) | LF | 228 | $2.84 | $2.84 | $2.84 | $2.84 | $2.84 |
| 116 | Drill EX handhole (87900200) | EACH | 12 | $435.86 | $435.86 | $435.86 | $435.86 | $435.86 |
| 117 | SH LED 1F 3S BM (88030050) | EACH | 2 | $770.00 | $770.00 | $770.00 | $770.00 | $770.00 |
| 118 | Ped SH LED 1F BM CDT (88102717) | EACH | 2 | $654.69 | $654.69 | $654.69 | $654.69 | $654.69 |
| 119 | Det loop T1 (88600100) | LF | 2,209 | $22.33 | $22.33 | $22.33 | $22.33 | $22.33 |
| 120 | Mod EX contr (89502200) | EACH | 2 | $1,189.33 | $1,189.93 | $1,189.93 | $1,189.93 | $1,189.93 |
| 121 | Rem elcbl FR con (89502300) | LF | 7,073 | $0.14 | $0.14 | $0.14 | $0.14 | $0.14 |
| 122 | Remov EX TS equip (89502375) | EACH | 1 | $87.01 | $87.01 | $87.01 | $87.01 | $87.01 |
| 123 | Rebuild EX handhole (89502376) | EACH | 1 | $2,563.82 | $2,563.82 | $2,563.82 | $2,563.82 | $2,563.82 |
| 124 | Rebld EX HH to HD HH (89502378) | EACH | 1 | $284.24 | $2,843.24 | $2,843.24 | $2,843.24 | $2,843.24 |
| 125 | Remov EX handhole (89502380) | EACH | 3 | $434.91 | $434.91 | $434.91 | $434.91 | $434.91 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of June 12, 2026. Compiled by Mirage Metrics.