Arrow Road Construction Co.: IDOT bid record

Arrow Road Construction Co. submitted 84 bids on Illinois DOT contracts in the data, from 15 JAN 2021 to 22 SEP 2023, and was the low bidder on 19 of them (23%). When it was not low, its total sat a median +10% above the low bid.

Owner
Illinois DOT
Low bid volume
$42,598,008
Latest bid
22 SEP 2023
Data through
18 SEP 2026
84Bids
19Low bids
23Win rate, percent
+10%Median gap to the low bid when not low, 65 bids

By year

YearBidsLow bidsWin rate
202133618%
202235926%
202316425%
Arrow Road Construction Co., IDOT: bids and low bids by year of letting

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Bit matls tack CT40600290LB8369 (83%)$0.01$0.01
Trainees TPGZ0076604HR6868 (100%)$15.00$15.00
TraineesZ0076600HR6868 (100%)$0.80$0.80
THPL PVT MK line 678000400LF7556 (75%)$0.90$1.40
THPL PVT MK line 478000200LF8052 (65%)$0.60$0.88
THPL PVT MK line 2478000650LF7552 (69%)$5.00$6.00
THPL PVT MK line 1278000600LF7249 (68%)$2.00$3.10
THPL PVT MK LTR & sym78000100SF7348 (66%)$4.25$5.75
Temp info signingZ0030850SF8139 (48%)$16.00$18.00
Raised refl pavt MKR78100100EACH5139 (76%)$28.00$48.00
Det loop repl88600600LF5238 (73%)$16.00$17.00
Topsoil F & P 421101615SY6336 (57%)$6.00$6.60
Arrow Road Construction Co., IDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Arrow Road Construction Co., IDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
22 SEP 202362T71District 01Section FAU2 of 4$3,937,751+4.0%
16 JUN 202361J44District 01Elgin, section 21-00190-00-RS3 of 4$1,825,341+10%
28 APR 202361J27District 01Bloomingdale, section 20-00072-00-RS3 of 4$1,029,681+9.0%
28 APR 202361J34District 01Elk Grove Village, section 21-00075-00-RS3 of 3$1,438,227+15%
10 MAR 202361H65District 01Schaumburg, section 16-00127-02-PV4 of 7$819,466+4.0%
10 MAR 202361J06District 01Deer Park, section 22-00018-00-RS4 of 5$675,045+17%
10 MAR 202361J29District 01Lake In The Hills, section 22-00041-00-RS3 of 5$337,850+19%
10 MAR 202362M65District 01Section 2020-191-RS4 of 4$1,842,114+5.0%
10 MAR 202362N80District 01Section 2021-048-RS1 of 4$3,921,219Low, 9.0% under the second
10 MAR 202362R17District 01Section FAU1 of 3$2,823,438Low, 11% under the second
10 MAR 202362R54District 01Section FAU1 of 6$1,381,362Low, 3.0% under the second
20 JAN 202361J12District 01Itasca, section 19-00066-00-CH5 of 5$2,492,211+25%
20 JAN 202361J17District 01Wilmette, section 19-00204-00-RS2 of 5$1,141,1260.0%
20 JAN 202362N69District 01Section 2021-045-RS2 of 3$2,713,862+9.0%
20 JAN 202362N79District 01Section 2021-047-RS2 of 6$4,278,515+12%
20 JAN 202362R80District 01Section FAU1 of 6$1,473,887Low, 1.0% under the second
18 NOV 202261J03District 01City Of Mchenry, section 20-00087-00-RS5 of 5$1,389,219+19%
18 NOV 202262N53District 01Section 2021-034-RS1 of 4$1,158,710Low, 6.0% under the second
23 SEP 202261H90District 01Bellwood, section 21-00150-00-RS7 of 7$752,690+13%
23 SEP 202261H92District 01Round Lake, section 19-00082-00-RS4 of 4$1,777,203+20%
05 AUG 202261H86District 01Hanover Park, section 22-00075-00-RS2 of 5$534,141+1.0%
05 AUG 202262N54District 01Section 2021-037-RS3 of 3$1,107,070+5.0%
05 AUG 202262N66District 01Section 2021-043-RS2 of 4$1,277,372+2.0%
17 JUN 202261H68District 01Schaumburg, section 21-00138-00-RS3 of 4$973,789+6.0%
17 JUN 202261H72District 01Schaumburg, section 21-00137-00-RS3 of 4$1,874,683+7.0%
Arrow Road Construction Co.: latest IDOT bids in the data

How this record was read

IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

  • Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy