IDOT letting results, June 17, 2022
211 contracts let by Illinois DOT on June 17, 2022, $622,101,219 in low bids, a median of 2 bidders per contract.
- Owner
- Illinois DOT
- Contracts
- 211
- Low bids, total
- $622,101,219
- Data through
- 18 SEP 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Source |
|---|---|---|---|---|---|---|---|---|
| 70A29 | Section (92-10,11,12)R | District 05 | 1 | Open Road Paving Company LLC | $63,305,838 | IDOT | ||
| 62H15 | Section 2018-075-R | District 01 | 3 | D. Construction, Inc. | $59,259,179 | $64,594,982 | +9.0% | IDOT |
| 74599 | Section (25-4-1, | District 07 | 2 | Howell Paving, Inc. | $50,277,006 | $71,997,359 | +43% | IDOT |
| 60W35 | Section 2013-009B | District 01 | 2 | D. Construction, Inc. and P. T. Ferro Construction Company JV | $38,303,613 | $45,256,987 | +18% | IDOT |
| 60T46 | Section 2012-008I | District 01 | 2 | John Burns Construction Company | $31,861,111 | $36,769,252 | +15% | IDOT |
| 74257 | Section (012-49,50)RS-4 | District 07 | 1 | Howell Paving, Inc. | $18,999,131 | IDOT | ||
| 74A24 | Section (141,142,143)RS-4 | District 07 | 1 | Illinois Valley Paving, a div of UCM, Inc. | $15,249,972 | IDOT | ||
| 66957 | Section 140 | District 03 | 1 | Kankakee Valley Construction Company, Inc. | $13,879,194 | IDOT | ||
| 74780 | Section (48X-1,48X-2)RS-2(128)RS-3 | District 07 | 1 | Illinois Valley Paving, a div of UCM, Inc. | $13,349,233 | IDOT | ||
| 76M80 | Section (65-1,66-1,67-1)RS-1 | District 08 | 2 | Christ Bros. Asphalt, Inc. | $10,232,828 | $10,598,049 | +4.0% | IDOT |
| 66L88 | Section (109N, | District 03 | 2 | P. T. Ferro Construction Co. | $8,398,082 | $8,576,927 | +2.0% | IDOT |
| 61H44 | Mount Prospect, section 17-00166-00-CH | District 01 | 3 | Alliance Contractors, Inc. | $8,264,103 | $8,406,000 | +2.0% | IDOT |
| 70F39 | Section (10-37)RS-3&(10,27-38)RS-2 | District 05 | 1 | Open Road Paving Company LLC | $8,228,483 | IDOT | ||
| 78619 | Section (X1-6)HB-4 | District 09 | 1 | Samron Midwest Contracting, Inc. | $7,311,127 | IDOT | ||
| 78685 | Section (64-1)B-2 | District 09 | 1 | Samron Midwest Contracting, Inc. | $7,144,489 | IDOT | ||
| 74959 | Section (139,140)RS-4 | District 07 | 1 | Illinois Valley Paving, a div of UCM, Inc. | $6,357,255 | IDOT | ||
| 66K76 | Section (124,125)RS,SW | District 03 | 1 | Kankakee Valley Construction Company, Inc. | $6,277,406 | IDOT | ||
| 62H16 | Section 2018-075-B-R | District 01 | 3 | D. Construction, Inc. | $6,157,939 | $6,323,926 | +3.0% | IDOT |
| 66L58 | Section (15A,15R)RS-6,SW | District 03 | 3 | D. Construction, Inc. | $6,075,158 | $6,577,113 | +8.0% | IDOT |
| 78874 | Section (10,11,12)RS-7 | District 09 | 1 | E. T. Simonds Construction Company | $6,063,846 | IDOT | ||
| 61H26 | Beecher, section 15-00020-00-FP | District 01 | 2 | Iroquois Paving Corporation | $5,343,400 | $6,860,778 | +28% | IDOT |
| 87779 | City Of Dekalb, section 18-00193-00-BR | District 03 | 4 | Herlihy Mid-Continent Company | $5,253,737 | $5,448,297 | +4.0% | IDOT |
| 66L89 | Section (3,13)RS-6 | District 03 | 1 | Iroquois Paving Corporation | $4,972,663 | IDOT | ||
| 66J71 | Section (2,3)RS-3&SW | District 03 | 1 | D. Construction, Inc. | $4,944,149 | IDOT | ||
| 62R48 | Section 2022-EXPN-SW | District 01 | 1 | Elgin Sweeping Services, Inc. | $4,903,360 | IDOT | ||
| 66616 | Section (3)RS-5 | District 03 | 1 | Advanced Asphalt Company | $4,883,010 | IDOT | ||
| 66A80 | Section (125)RS-5 | District 03 | 3 | Curran Contracting Company | $4,683,751 | $4,789,856 | +2.0% | IDOT |
| 66B77 | Section 104RS-2, | District 03 | 1 | Kankakee Valley Construction Company, Inc. | $4,357,980 | IDOT | ||
| 66K68 | Section (38)RS-5, | District 03 | 1 | Iroquois Paving Corporation | $4,264,818 | IDOT | ||
| 78624 | Section (8,9,102)N-2; | District 09 | 3 | Samron Midwest Contracting, Inc. | $4,114,777 | $4,590,180 | +12% | IDOT |
| 72N33 | Section (69-1,1X,2)RS1,PP1;(23)RS8,PP | District 06 | 1 | Illinois Valley Paving, a div of UCM, Inc. | $4,055,098 | IDOT | ||
| 70608 | Section 116BR-1 | District 05 | 2 | White Construction LLC | $3,930,382 | $4,427,437 | +13% | IDOT |
| 78879 | Section D9 | District 09 | 1 | Gerstner Electric, Inc. | $3,725,432 | IDOT | ||
| 62P14 | Section 2021-077-B-R&FL | District 01 | 4 | Lorig Construction Company | $3,650,806 | $3,761,853 | +3.0% | IDOT |
| 72D11 | Section 128RS-5, | District 06 | 2 | Charles E. Mahoney Co. | $3,602,805 | $3,774,536 | +5.0% | IDOT |
| 95922 | Project Number: Knnd-663 / /, section 20-00301-00-PV | District 07 | 2 | Illinois Valley Paving, a div of UCM, Inc. | $3,559,453 | $3,609,120 | +1.0% | IDOT |
| 62N72 | Section 2021-011-RS-SR&SW | District 01 | 4 | D. Construction, Inc. | $3,486,258 | $3,770,843 | +8.0% | IDOT |
| 93791 | Project Number: R2Xa-262 / /, section 19-00108-00-RS | District 06 | 2 | K. E. Vas Company | $3,297,855 | $3,567,636 | +8.0% | IDOT |
| 97763 | America Central Port Dist, section 18-00003-00-PV | District 08 | 5 | Hank's Excavating & Landscaping, Inc. | $3,291,630 | $3,340,623 | +1.0% | IDOT |
| 78899 | Section BRIDGE | District 09 | 2 | E. T. Simonds Construction Company | $3,085,776 | $3,155,270 | +2.0% | IDOT |
| 70B78 | Section (10-6B)BR-1 | District 05 | 1 | Stark Excavating, Inc. | $3,018,954 | IDOT | ||
| 64P15 | Section 111RS-6 | District 02 | 1 | Civil Constructors, Inc. d/b/a/ Helm Civil | $3,018,594 | IDOT | ||
| 64L13 | Section D2 | District 02 | 2 | Phoenix Corporation of the Quad Cities | $2,774,444 | $3,124,595 | +13% | IDOT |
| 66H07 | Section (115,116)RS-3 | District 03 | 2 | Builders Paving, LLC | $2,738,000 | $2,906,662 | +6.0% | IDOT |
| 66E53 | Section (113)RS-3 | District 03 | 1 | Kankakee Valley Construction Company, Inc. | $2,680,230 | IDOT | ||
| 46595 | Section D | District 01 | 5 | Precision Pavement Markings Inc. | $2,545,500 | $3,314,800 | +30% | IDOT |
| 91543 | Project Number: Upmv-809 / /, section 13-00160-02-RS | District 05 | 1 | Rowe Construction, a div of UCM, Inc. | $2,528,803 | IDOT | ||
| 85709 | Rock Falls, section 18-00136-00-FP | District 02 | 3 | Martin & Company Excavating | $2,521,018 | $2,753,264 | +9.0% | IDOT |
| 66M40 | Section D3 | District 03 | 2 | G. M. Sipes Construction, Inc. | $2,515,927 | $3,207,353 | +27% | IDOT |
| 66L45 | Section (11X,11X-3)RS-2 | District 03 | 2 | Kankakee Valley Construction Company, Inc. | $2,504,023 | $2,844,778 | +14% | IDOT |
| 66K78 | Section (36,37)RS-4,SW | District 03 | 1 | Iroquois Paving Corporation | $2,398,343 | IDOT | ||
| 62P33 | Section 2021-108-RS-SW&FL | District 01 | 1 | Peter Baker & Son Co. | $2,379,343 | IDOT | ||
| 66L48 | Section (32,47)4RA-4 | District 03 | 2 | D. Construction, Inc. | $2,364,030 | $2,674,889 | +13% | IDOT |
| 66E49 | Section (17)RS-2 | District 03 | 2 | Advanced Asphalt Company | $2,310,316 | $2,417,543 | +5.0% | IDOT |
| 62P54 | Section 2021-136-I | District 01 | 4 | Plote Construction, Inc. | $2,296,339 | $2,923,496 | +27% | IDOT |
| 64K62 | Section (103,104)CR | District 02 | 1 | Civil Constructors, Inc. d/b/a/ Helm Civil | $2,281,460 | IDOT | ||
| 89760 | Project Number: 0N9I-138 / /, section 17-00137-00-BR | District 04 | 3 | County Contractors, Inc. | $2,275,756 | $2,395,085 | +5.0% | IDOT |
| 62P58 | Section 2021-140-BR | District 01 | 4 | Alliance Contractors, Inc. | $2,248,890 | $2,294,470 | +2.0% | IDOT |
| 74473 | Section (15,16)Z | District 07 | 1 | Ambraw Asphalt Materials, Inc. | $2,110,031 | IDOT | ||
| 97772 | Project Number: Mfaj-120 / /, section 18-00094-00-RS | District 08 | 3 | E. T. Simonds Construction Company | $2,078,356 | $2,112,182 | +2.0% | IDOT |
| 68G43 | Section [(35,36)B-1;(37B-1)BR-1]BRR | District 04 | 3 | Freesen, a div of UCM, Inc. | $2,042,711 | $2,186,200 | +7.0% | IDOT |
| 76R03 | Section DIST | District 08 | 1 | Illini Excavation & Reclamation, Inc. | $1,899,983 | IDOT | ||
| 93790 | Project Number: J18E-076 / /, section 18-00174-07-PP | District 06 | 2 | Illinois Valley Paving, a div of UCM, Inc. | $1,876,448 | $1,947,666 | +4.0% | IDOT |
| 66M44 | Section D3 | District 03 | 2 | Northern Contracting, Inc. | $1,767,718 | $2,141,278 | +21% | IDOT |
| 61H72 | Schaumburg, section 21-00137-00-RS | District 01 | 4 | Plote Construction, Inc. | $1,760,185 | $1,832,000 | +4.0% | IDOT |
| 99655 | Project Number: Gcjz-370 / /, section 11-00137-00-RS | District 09 | 2 | E. T. Simonds Construction Company | $1,751,544 | $1,998,880 | +14% | IDOT |
| 61H82 | Skokie, section 19-00108-01-BT | District 01 | 3 | A Lamp Concrete Contractors, Inc. | $1,639,752 | $1,767,696 | +8.0% | IDOT |
| 62N47 | Section 2021-031-RS | District 01 | 4 | P. T. Ferro Construction Co. | $1,638,840 | $1,716,710 | +5.0% | IDOT |
| 46600 | Section D4 | District 04 | 3 | RoadSafe Traffic Systems, Inc. | $1,589,417 | $1,882,441 | +18% | IDOT |
| 66M16 | Section (110, | District 03 | 3 | Advanced Asphalt Company | $1,512,236 | $1,716,075 | +13% | IDOT |
| 70F54 | Section D5 | District 05 | 2 | Bodine Electric of Decatur | $1,495,623 | $1,698,047 | +14% | IDOT |
| 46923 | Section KICKAPOO | District 05 | 1 | White Construction LLC | $1,473,747 | IDOT | ||
| 61H70 | Brookfield, section 21-00135-00-RS | District 01 | 2 | K-Five Construction Corporation | $1,451,412 | $1,486,686 | +2.0% | IDOT |
| 46594 | Section D | District 01 | 2 | Superior Road Striping, Inc. | $1,443,259 | $2,249,686 | +56% | IDOT |
| 93787 | Project Number: 2Gf2-075 / /, section 21-00056-00-SC | District 06 | 2 | Illinois Valley Paving, a div of UCM, Inc. | $1,341,234 | $1,427,798 | +6.0% | IDOT |
| KA051 | Section GREATER | District 03 | 2 | D. Construction, Inc. | $1,330,251 | $1,486,298 | +12% | IDOT |
| 66J62 | Section (32-1HB-1)BR | District 03 | 1 | D. Construction, Inc. | $1,320,668 | IDOT | ||
| 62N50 | Section 2021-036-RS | District 01 | 3 | Iroquois Paving Corporation | $1,316,006 | $1,410,856 | +7.0% | IDOT |
| 66M17 | Section (101, | District 03 | 2 | Gallagher Asphalt Corporation | $1,297,408 | $1,347,664 | +4.0% | IDOT |
| 89813 | Project Number: Egvz-677 / /, section 19-00102-00-BR | District 04 | 2 | Curnyn Construction Co. | $1,262,966 | $1,333,126 | +6.0% | IDOT |
| 97776 | Project Number: E36C-153 / /, section 21-00085-00-SP | District 08 | 1 | Christ Bros. Asphalt, Inc. | $1,247,754 | IDOT | ||
| 66M18 | Section (112)SFY | District 03 | 1 | Iroquois Paving Corporation | $1,212,384 | IDOT | ||
| 61H79 | Lincolnshire, section 20-00025-00-RS | District 01 | 4 | Peter Baker & Son Co. | $1,206,851 | $1,290,800 | +7.0% | IDOT |
| 62N43 | Section 2021-030-RS | District 01 | 3 | K-Five Construction Corporation | $1,190,920 | $1,193,279 | 0.0% | IDOT |
| 66E48 | Section 113RS-4 | District 03 | 3 | D. Construction, Inc. | $1,189,717 | $1,316,671 | +11% | IDOT |
| 99688 | Project Number: 89H7-801 / /, section 13-00067-00-RS | District 09 | 1 | Southern Illinois Asphalt Co., Inc. | $1,182,686 | IDOT | ||
| 87756 | Project Number: Pjkv-854 / /, section 19-00173-00-BR | District 03 | 3 | Austin Tyler Construction, Inc. | $1,177,778 | $1,386,867 | +18% | IDOT |
| 99689 | Carbondale, section 18-00138-00-FP | District 09 | 2 | E. T. Simonds Construction Company | $1,176,665 | $1,192,272 | +1.0% | IDOT |
| 74B14 | Section D7 | District 07 | 1 | Howell Paving, Inc. | $1,159,941 | IDOT | ||
| 76P71 | Section 60-8BP-1, | District 08 | 3 | Venus Painting Co. | $1,152,000 | $1,184,994 | +3.0% | IDOT |
| 93788 | Project Number: Va5R-542 / /, section 16-00017-05-FP | District 06 | 1 | Diamond Construction Company | $1,149,512 | IDOT | ||
| 64R47 | Section D2 | District 02 | 1 | G. M. Sipes Construction, Inc. | $1,143,160 | IDOT | ||
| 64R62 | Section (141-1)WIM | District 02 | 2 | G. M. Sipes Construction, Inc. | $1,134,110 | $1,701,304 | +50% | IDOT |
| 95917 | Project Number: Ihqy-375- / /, section 18-00136-00-GR | District 07 | 2 | Lovewell Fencing, Inc. | $1,086,076 | $1,105,698 | +2.0% | IDOT |
| 95921 | Project Number: 9Nlp-490 / /, section 19-00077-00-PV | District 07 | 1 | Dunn Company (Tyrolt Incorporated) | $1,060,852 | IDOT | ||
| 78897 | Section (101)RS-7 | District 09 | 3 | Samron Midwest Contracting, Inc. | $1,048,828 | $1,191,952 | +14% | IDOT |
| 99632 | Carbondale, section 17-00136-00-BT | District 09 | 2 | Samron Midwest Contracting, Inc. | $1,034,513 | $1,123,219 | +9.0% | IDOT |
| 95882 | Project Number: 5Tbc-829 / /, section 94-08111-00-BR | District 07 | 1 | Stark Excavating, Inc. | $1,026,866 | IDOT | ||
| 46593 | Section D1 | District 01 | 3 | Preform Traffic Control Systems, Ltd. | $1,009,200 | $1,421,400 | +41% | IDOT |
| 46575 | Section D1 | District 01 | 2 | STF, LLC d/b/a Traffic Control Company | $1,004,800 | $1,684,500 | +68% | IDOT |
| 62P72 | Section 2021-155-TS | District 01 | 2 | H & H Electric Co. | $993,648 | $1,264,798 | +27% | IDOT |
| 99676 | Project Number: 7Fzw-624 / /, section 20-00160-00-RS | District 09 | 2 | E. T. Simonds Construction Company | $985,189 | $1,022,032 | +4.0% | IDOT |
| 64N77 | Section D2 | District 02 | 2 | Civil Constructors, Inc. d/b/a/ Helm Civil | $976,105 | $1,190,214 | +22% | IDOT |
| 99682 | Project Number: H181-597 / /, section 19-00188-00-RS | District 09 | 3 | Samron Midwest Contracting, Inc. | $974,794 | $1,038,402 | +7.0% | IDOT |
| 87778 | Project Number: Uvds-442 / /, section 18-00267-00-BR | District 03 | 3 | Gensini Excavating, Inc. | $961,378 | $991,325 | +3.0% | IDOT |
| 76P96 | Section DIST | District 08 | 2 | Electrico, Inc. | $949,010 | $1,286,513 | +36% | IDOT |
| 61H68 | Schaumburg, section 21-00138-00-RS | District 01 | 4 | Plote Construction, Inc. | $921,953 | $938,000 | +2.0% | IDOT |
| 97761 | Maryville, section 17-00018-00-RS | District 08 | 2 | The Kilian Corporation | $918,670 | $1,209,110 | +32% | IDOT |
| 61H77 | Elk Grove Village, section 21-00074-00-RS | District 01 | 5 | R. W. Dunteman Company | $829,750 | $974,044 | +17% | IDOT |
| 95920 | Project Number: Yk3P-693 / /, section 13-00261-00-BR | District 07 | 1 | County Contractors, Inc. | $815,520 | IDOT | ||
| 97783 | East St. Louis, section 18-00213-02-RS | District 08 | 2 | Hank's Excavating & Landscaping, Inc. | $797,699 | $921,736 | +16% | IDOT |
| 66M05 | Section (38-8)RA-L2 | District 03 | 2 | Van-Mack Electric Co. | $785,218 | $810,070 | +3.0% | IDOT |
| 70F78 | Section D5 | District 05 | 1 | Kujo, Inc. | $783,300 | IDOT | ||
| 95919 | Project Number: Pbsn-685 / /, section 21-P4000-00-FP | District 07 | 2 | Dunn Company (Tyrolt Incorporated) | $782,944 | $834,378 | +7.0% | IDOT |
| 76P61 | Section DIST | District 08 | 2 | Kinney Contractors, Inc. | $780,494 | $825,292 | +6.0% | IDOT |
| 99677 | Project Number: T5Rz-501 / /, section 21-00085-00-RS | District 09 | 2 | E. T. Simonds Construction Company | $775,030 | $907,007 | +17% | IDOT |
| 93789 | Project Number: 9Exr-862 / /, section 19-07116-00-BR | District 06 | 3 | Yamnitz, William d/b/a Yamnitz & Associates | $763,500 | $805,488 | +5.0% | IDOT |
| 95918 | Project Number: Ucy2-818 / /, section 20-00137-00-PP | District 07 | 2 | Mt. Carmel Stabilization Group, Inc. | $747,728 | $2,053,966 | +175% | IDOT |
| 78954 | Section D9 | District 09 | 3 | Kinney Contractors, Inc. | $739,969 | $752,861 | +2.0% | IDOT |
| 72N25 | Section D6 | District 06 | 2 | Phoenix Corporation of the Quad Cities | $732,944 | $803,800 | +10% | IDOT |
| 62P59 | Section 2021-143-I | District 01 | 5 | Gallagher Asphalt Corporation | $720,206 | $749,445 | +4.0% | IDOT |
| 97780 | Sauget, section 18-00009-05-SP | District 08 | 2 | The Kilian Corporation | $717,364 | $764,941 | +7.0% | IDOT |
| 66M21 | Section (122BR, | District 03 | 4 | Venus Painting Co. | $710,553 | $823,778 | +16% | IDOT |
| 97777 | Edwardsville, section 16-00108-00-TL | District 08 | 2 | Electrico, Inc. | $705,276 | $738,152 | +5.0% | IDOT |
| 72883 | Section D6 | District 06 | 2 | Kinney Contractors, Inc. | $704,932 | $716,641 | +2.0% | IDOT |
| 78951 | Section D9 | District 09 | 3 | E. T. Simonds Construction Company | $702,322 | $727,788 | +4.0% | IDOT |
| 76P94 | Section (202,1,121)TS-1 | District 08 | 2 | Electrico, Inc. | $697,430 | $857,851 | +23% | IDOT |
| 62P55 | Section 2021-137-BR | District 01 | 4 | ICC Group Inc. | $697,200 | $931,787 | +34% | IDOT |
| 61H76 | Romeoville, section 22-00073-00-RS | District 01 | 5 | Austin Tyler Construction, Inc. | $683,544 | $738,904 | +8.0% | IDOT |
| 72N27 | Section D6 | District 06 | 3 | Phoenix Corporation of the Quad Cities | $654,605 | $972,335 | +49% | IDOT |
| 62L11 | Section 2020-039-RS-SW&SR | District 01 | 4 | J. A. Johnson Paving Company | $654,540 | $671,888 | +3.0% | IDOT |
| 72130 | Section (84-10-1)SLP,TR | District 06 | 1 | CSD Environmental Services, Inc. | $652,441 | IDOT | ||
| 78955 | Section D9 | District 09 | 3 | E. T. Simonds Construction Company | $638,849 | $693,786 | +9.0% | IDOT |
| 68G72 | Section (72-7)PP-2 | District 04 | 3 | Kinney Contractors, Inc. | $627,541 | $675,574 | +8.0% | IDOT |
| 74B20 | Section D7 | District 07 | 1 | Collins & Hermann, Inc. | $622,918 | IDOT | ||
| 89812 | Project Number: 0203-029 / /, section 16-00091-02-RR | District 04 | 1 | Rowe Construction, a div of UCM, Inc. | $614,969 | IDOT | ||
| 66M50 | Section (7)RS-4 | District 03 | 2 | Gallagher Asphalt Corporation | $607,878 | $717,990 | +18% | IDOT |
| 95924 | Project Number: G3Mj-899 / /, section 19-00127-00-SP | District 07 | 1 | Howell Paving, Inc. | $593,863 | IDOT | ||
| 68H05 | Section (35,36; | District 04 | 1 | R. A. Cullinan and Son, a div of UCM, Inc. | $579,057 | IDOT | ||
| 85726 | Project Number: Xm3N-979 / /, section 21-00115-00-BT | District 02 | 2 | Stenstrom Excavation & Blacktop, Inc. | $577,894 | $797,149 | +38% | IDOT |
| 61H69 | Glencoe, section 21-00065-00-BT | District 01 | 3 | Alliance Contractors, Inc. | $570,570 | $726,704 | +27% | IDOT |
| 76P79 | Section 112BR-3 | District 08 | 3 | Keller Construction, Inc. | $545,545 | $574,979 | +5.0% | IDOT |
| 61H51 | Carol Stream, section 15-00060-00-BT | District 01 | 6 | R. W. Dunteman Company | $521,372 | $574,705 | +10% | IDOT |
| 68G97 | Section (50,39,36,40)PP | District 04 | 2 | Brandt Construction Co. | $496,110 | $534,366 | +8.0% | IDOT |
| 46589 | Section D3 | District 03 | 4 | Northern Contracting, Inc. | $484,247 | $900,000 | +86% | IDOT |
| 76P80 | Section 9BR-1 | District 08 | 4 | Keeley & Sons, Inc. | $478,603 | $564,111 | +18% | IDOT |
| 62R32 | Section FA | District 01 | 3 | Path Construction Company, Inc. | $458,553 | $631,779 | +38% | IDOT |
| 66M59 | Section 2022-2 | District 03 | 5 | CSD Environmental Services, Inc. | $456,330 | $530,484 | +16% | IDOT |
| 87786 | Yorkville, section 21-00052-00-RS | District 03 | 3 | D. Construction, Inc. | $446,274 | $472,000 | +6.0% | IDOT |
| 72M30 | Section (145)BDR | District 06 | 5 | Freesen, a div of UCM, Inc. | $442,291 | $459,211 | +4.0% | IDOT |
| 74902 | Section D7 | District 07 | 1 | Bodine Electric of Decatur | $437,840 | IDOT | ||
| 68G93 | Section 4-PP | District 04 | 2 | Gunther Construction, a div of UCM, Inc. | $435,978 | $565,390 | +30% | IDOT |
| 78940 | Section D9 | District 09 | 4 | Kinney Contractors, Inc. | $426,244 | $451,073 | +6.0% | IDOT |
| 97778 | Salem, section 18-00047-03-PV | District 08 | 1 | Guinzy Construction,Inc. | $425,825 | IDOT | ||
| 97775 | Project Number: Nu63-081 / /, section 21-00062-04-SW | District 08 | 1 | DMS Contracting, Inc. | $423,742 | IDOT | ||
| 76P78 | Section 17BR-1 | District 08 | 2 | Depew and Owen Builders, Inc. | $420,588 | $424,414 | +1.0% | IDOT |
| 66M58 | Section 2022-1 | District 03 | 5 | Nettle Creek Nursery, Inc. | $396,348 | $452,620 | +14% | IDOT |
| 95914 | Project Number: 6Hil-452 / /, section 18-20122-00-BR | District 07 | 1 | Depew and Owen Builders, Inc. | $392,688 | IDOT | ||
| 46601 | Section D4 | District 04 | 2 | P & P Construction Co. | $391,605 | $499,990 | +28% | IDOT |
| 66M35 | Section D3 | District 03 | 1 | All States Painting, Inc. | $378,400 | IDOT | ||
| 99685 | Project Number: Hqra-195 / /, section 19-00100-00-BR | District 09 | 2 | Dees, Inc. | $374,572 | $382,761 | +2.0% | IDOT |
| 66M02 | Section (125BR)BRR | District 03 | 5 | Sjostrom & Sons, Inc. | $370,683 | $373,291 | +1.0% | IDOT |
| 74B15 | Section D7 | District 07 | 3 | Kinney Contractors, Inc. | $359,502 | $401,050 | +12% | IDOT |
| 74B08 | Section D7 | District 07 | 3 | Kinney Contractors, Inc. | $353,618 | $384,662 | +9.0% | IDOT |
| 85722 | Project Number: Fiuz-640 / /, section 20-06122-00-BR | District 02 | 4 | Curnyn Construction Co. | $342,370 | $345,421 | +1.0% | IDOT |
| 64R40 | Section (17R-IVBR)BP | District 02 | 5 | Civil Coatings and Construction Inc. | $335,125 | $365,760 | +9.0% | IDOT |
| 72N40 | Section (1B-1)BDR | District 06 | 4 | Path Construction Company, Inc. | $330,698 | $334,197 | +1.0% | IDOT |
| 70F71 | Section HMLT2022-1 | District 05 | 1 | Champaign Signal and Lighting Co. A Division of Champaign Asphalt Company LLC | $314,840 | IDOT | ||
| 62P53 | Section 2021-131-I | District 01 | 4 | MYS, Incorporated | $306,804 | $315,224 | +3.0% | IDOT |
| 72M72 | Section D6 | District 06 | 3 | Rees Construction Company of Quincy | $303,142 | $363,663 | +20% | IDOT |
| 95916 | Project Number: 8Gm5-575 / /, section 19-07132-00-BR | District 07 | 1 | Depew and Owen Builders, Inc. | $299,988 | IDOT | ||
| 61H75 | Monee, section 21-00031-00-RS | District 01 | 3 | Iroquois Paving Corporation | $295,197 | $322,243 | +9.0% | IDOT |
| 72129 | Section 3TR | District 06 | 1 | CSD Environmental Services, Inc. | $293,990 | IDOT | ||
| 70F84 | Section DANVILLE | District 05 | 2 | Stark Excavating, Inc. | $293,477 | $429,580 | +46% | IDOT |
| 64N64 | Section D2 | District 02 | 3 | Sjostrom & Sons, Inc. | $292,528 | $293,239 | 0.0% | IDOT |
| 46599 | Section D5 | District 05 | 3 | Varsity Striping & Construction Co. | $291,563 | $302,620 | +4.0% | IDOT |
| 68G95 | Section 48(27-29)PP | District 04 | 1 | G. M. Sipes Construction, Inc. | $289,794 | IDOT | ||
| 68G69 | Section (72-6HB-2)BRR | District 04 | 3 | Stark Excavating, Inc. | $278,003 | $347,734 | +25% | IDOT |
| 68G90 | Section D4 | District 04 | 2 | Laser Electric, Inc. | $266,565 | $340,740 | +28% | IDOT |
| 66M13 | Section (78-1HB)BP | District 03 | 4 | Venus Painting Co. | $258,968 | $285,478 | +10% | IDOT |
| 64R59 | Section D2 | District 02 | 2 | Davenport Electric Contract Company | $258,944 | $314,148 | +21% | IDOT |
| 74B17 | Section D7 | District 07 | 1 | Bodine Electric of Decatur | $258,916 | IDOT | ||
| 64R69 | Section D2 | District 02 | 2 | Western Remac, Inc. | $253,662 | $486,717 | +92% | IDOT |
| 70G10 | Section D5 | District 05 | 1 | Illinois Valley Paving, a div of UCM, Inc. | $244,755 | IDOT | ||
| 93786 | Project Number: Yw4V-072 / /, section 19-00102-00-BR | District 06 | 4 | Keeley & Sons, Inc. | $234,890 | $243,342 | +4.0% | IDOT |
| 66M60 | Section (10, | District 03 | 2 | G. M. Sipes Construction, Inc. | $231,790 | $278,224 | +20% | IDOT |
| 68G92 | Section (21,22)PP | District 04 | 2 | Gunther Construction, a div of UCM, Inc. | $208,605 | $238,780 | +14% | IDOT |
| 72N42 | Section (18BR)BDR-BJR | District 06 | 6 | County Contractors, Inc. | $204,325 | $229,190 | +12% | IDOT |
| 66M15 | Section (3&4)SFY | District 03 | 3 | D. Construction, Inc. | $200,000 | $231,244 | +16% | IDOT |
| 68G98 | Section (21-1)PP | District 04 | 2 | G. M. Sipes Construction, Inc. | $193,563 | $225,893 | +17% | IDOT |
| 66M25 | Section (19BR)BP | District 03 | 4 | ERA-Valdivia Contractors, Inc. | $189,647 | $210,675 | +11% | IDOT |
| 68G99 | Section (2-15D)PP | District 04 | 2 | Langman Construction, Inc. | $188,376 | $389,930 | +107% | IDOT |
| 72100 | Section D6 | District 06 | 2 | Kinney Contractors, Inc. | $169,930 | $196,675 | +16% | IDOT |
| 68G94 | Section 14-PP | District 04 | 2 | G. M. Sipes Construction, Inc. | $169,342 | $225,415 | +33% | IDOT |
| 68G96 | Section (42, | District 04 | 2 | Gunther Construction, a div of UCM, Inc. | $165,743 | $242,251 | +46% | IDOT |
| 78950 | Section D9 | District 09 | 2 | E. T. Simonds Construction Company | $161,219 | $177,161 | +10% | IDOT |
| 68G65 | Section (X3-17HB)BRR | District 04 | 2 | Stark Excavating, Inc. | $157,836 | $161,269 | +2.0% | IDOT |
| 68H04 | Section (103,104)MED | District 04 | 2 | Phoenix Corporation of the Quad Cities | $155,327 | $189,587 | +22% | IDOT |
| 64P95 | Section 110N | District 02 | 2 | Civil Constructors, Inc. d/b/a/ Helm Civil | $145,965 | $187,640 | +29% | IDOT |
| 46597 | Section D5 | District 05 | 2 | Rowe Construction, a div of UCM, Inc. | $140,128 | $248,984 | +78% | IDOT |
| 68G89 | Section D4 | District 04 | 2 | The Daltons Inc. | $138,418 | $139,900 | +1.0% | IDOT |
| 72N41 | Section (117B-3)BDR | District 06 | 6 | Freesen, a div of UCM, Inc. | $130,203 | $130,982 | +1.0% | IDOT |
| 78946 | Section D9 | District 09 | 1 | F. W. Electric, Inc. | $114,770 | IDOT | ||
| 72N37 | Section (103B-1)BDR | District 06 | 4 | Path Construction Company, Inc. | $110,113 | $116,308 | +6.0% | IDOT |
| 62P84 | Section 2021-162-C | District 01 | 4 | Scanlon Excavating & Concrete, Inc. | $96,015 | $188,310 | +96% | IDOT |
| 72N38 | Section (123B-1)BDR | District 06 | 6 | County Contractors, Inc. | $86,959 | $87,771 | +1.0% | IDOT |
| 68H06 | Section (55-3)PRP | District 04 | 2 | Nettle Creek Nursery, Inc. | $65,040 | $171,950 | +164% | IDOT |
| 76P62 | Section DIST | District 08 | 2 | The Daltons Inc. | $60,708 | $102,650 | +69% | IDOT |
| 72N28 | Section 1-3I-1 | District 06 | 3 | County Contractors, Inc. | $50,100 | $56,000 | +12% | IDOT |
| 76P56 | Section 82-2-1ELE-2 | District 08 | 2 | Electrico, Inc. | $39,650 | $54,800 | +38% | IDOT |
| 64P89 | Section D2 | District 02 | 3 | M & M Concrete, Inc. | $20,971 | $35,145 | +68% | IDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than IDOT received, the others did not match their published totals and are left out.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.