Austin Tyler Construction, Inc.: IDOT bid record
Austin Tyler Construction, Inc. submitted 118 bids on Illinois DOT contracts in the data, from 15 JAN 2021 to 18 SEP 2026, and was the low bidder on 17 of them (14%). When it was not low, its total sat a median +14% above the low bid.
- Owner
- Illinois DOT
- Low bid volume
- $88,471,204
- Latest bid
- 18 SEP 2026
- Data through
- 18 SEP 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2021 | 21 | 1 | 5% |
| 2022 | 15 | 3 | 20% |
| 2023 | 11 | 4 | 36% |
| 2024 | 27 | 3 | 11% |
| 2025 | 24 | 3 | 13% |
| 2026 | 20 | 3 | 15% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 01 | 96 | 14 | 15% |
| District 03 | 22 | 3 | 14% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Bit matls tack CT | 40600290 | LB | 103 | 91 (88%) | $0.01 | $0.01 |
| Trainees TPG | Z0076604 | HR | 53 | 53 (100%) | $15.00 | $15.00 |
| Trainees | Z0076600 | HR | 51 | 51 (100%) | $0.80 | $0.80 |
| THPL PVT MK line 4 | 78000200 | LF | 84 | 30 (36%) | $0.83 | $0.88 |
| THPL PVT MK line 12 | 78000600 | LF | 75 | 28 (37%) | $3.00 | $3.10 |
| THPL PVT MK line 24 | 78000650 | LF | 78 | 27 (35%) | $5.75 | $6.00 |
| Bit matls PR CT | 40600275 | LB | 34 | 27 (79%) | $0.01 | $0.01 |
| Soil disposal analy | 66900530 | EACH | 63 | 26 (41%) | $1,400.00 | $1,470.00 |
| Perimeter eros bar | 28000400 | LF | 49 | 26 (53%) | $3.00 | $3.50 |
| Nitrogen fert nutr | 25000400 | LB | 48 | 25 (52%) | $3.00 | $3.00 |
| THPL PVT MK LTR & sym | 78000100 | SF | 69 | 24 (35%) | $5.75 | $5.75 |
| Raised refl pavt MKR | 78100100 | EACH | 68 | 24 (35%) | $45.97 | $48.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| D. Construction, Inc. | 100 | 74 of 100 |
| P. T. Ferro Construction Co. | 88 | 54 of 88 |
| Gallagher Asphalt Corporation | 71 | 47 of 71 |
| K-Five Construction Corporation | 40 | 23 of 40 |
| Iroquois Paving Corporation | 20 | 19 of 20 |
| Builders Paving, LLC | 11 | 7 of 11 |
| R. W. Dunteman Company | 10 | 4 of 10 |
| Alliance Contractors, Inc. | 10 | 1 of 10 |
| Lorig Construction Company | 8 | 1 of 8 |
| Herlihy Mid-Continent Company | 8 | 0 of 8 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 18 SEP 2026 | 80C95 | District 01 | Section 2025-2129-RS,SW | 5 of 5 | $1,284,716 | +17% |
| 12 JUN 2026 | 62L30 | District 01 | Section 2020-142-C&DR | 3 of 6 | $15,216,031 | +9.0% |
| 12 JUN 2026 | 66C06 | District 03 | Section (G)RS-6&(F)RS-3 | 3 of 4 | $5,439,250 | +30% |
| 24 APR 2026 | 62V71 | District 01 | Section FAP | 5 of 6 | $3,125,700 | +11% |
| 24 APR 2026 | 66N58 | District 03 | Section (G-BR)BR-1 | 2 of 2 | $1,852,353 | +16% |
| 24 APR 2026 | 80B05 | District 01 | Section 2025-2018-RS,SW | 3 of 5 | $1,544,966 | +8.0% |
| 24 APR 2026 | 80B30 | District 01 | Section 2025-2011-RS | 5 of 5 | $6,012,908 | +46% |
| 24 APR 2026 | 80B31 | District 01 | Section 2025-2012-RS | 4 of 4 | $2,765,709 | +30% |
| 24 APR 2026 | 80C49 | District 01 | Section 2025-2106-RS | 5 of 5 | $5,419,276 | +30% |
| 24 APR 2026 | 87899 | District 03 | Project Number: 32Zu-960 / /, section 22-00168-00-RP | 1 of 3 | $32,828,299 | Low, 13% under the second |
| 27 FEB 2026 | 61M25 | District 01 | Project Number: H406-985 / /, section 16-11107-01-BR | 2 of 7 | $1,757,816 | +13% |
| 27 FEB 2026 | 62P01 | District 01 | Section 2021-064-CR | 1 of 4 | $4,980,727 | Low, 1.0% under the second |
| 27 FEB 2026 | 66N22 | District 03 | Section (3)CR-2514 | 2 of 4 | $214,746 | +8.0% |
| 27 FEB 2026 | 80B13 | District 01 | Section 2025-1086-RS | 4 of 5 | $1,649,028 | +16% |
| 16 JAN 2026 | 60R94 | District 01 | Section U-1-N | 4 of 6 | $9,884,125 | +14% |
| 16 JAN 2026 | 61L81 | District 01 | Romeoville, section 25-00080-00-RS | 5 of 6 | $654,651 | +10% |
| 16 JAN 2026 | 61M01 | District 01 | Shorewood, section 21-00047-00-WR | 1 of 3 | $8,923,156 | Low, 3.0% under the second |
| 16 JAN 2026 | 80B14 | District 01 | Section 2025-1087-RS | 3 of 4 | $2,297,279 | +13% |
| 16 JAN 2026 | 80B34 | District 01 | Section 2025-2004-RS | 5 of 6 | $1,087,776 | +11% |
| 16 JAN 2026 | 80B36 | District 01 | Section 2025-1088-RS | 6 of 6 | $4,069,252 | +25% |
| 07 NOV 2025 | 61L73 | District 01 | Project Number:, section 21-P4015-00-BT | 2 of 6 | $395,907 | +12% |
| 19 SEP 2025 | 62X01 | District 01 | Section 2024-981-RS | 4 of 6 | $8,617,240 | +18% |
| 19 SEP 2025 | 87846 | District 03 | Oswego, section 23-00052-02-PV | 3 of 4 | $12,497,254 | +16% |
| 01 AUG 2025 | 62V12 | District 01 | Section FAU | 1 of 6 | $664,171 | Low, 1.0% under the second |
| 01 AUG 2025 | 62X50 | District 01 | Section 2024-1012-SW,RS | 4 of 5 | $1,067,594 | +9.0% |
How this record was read
IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
- Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.