IDOT contract 62P01 bid tabulation

Section 2021-064-CR. Let by Illinois DOT on February 27, 2026, Will, District 01. 4 bids received; low bid $4,980,727 by Austin Tyler Construction, Inc..

Owner
Illinois DOT
Letting
27 FEB 2026
Pay items
131
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Austin Tyler Construction, Inc.$4,980,727Low
2D. Construction, Inc.$5,055,284+1.0%
3P. T. Ferro Construction Co.$5,612,641+13%
4Lorig Construction Company$6,794,682+36%
IDOT contract 62P01: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Austin Tyler Construction, Inc.2. D. Construction, Inc.3. P. T. Ferro Construction Co.4. Lorig Construction Company
1Mowing cycles (K1003660)EACH12$2,600.00$2,860.00$8,400.00$2,600.00
2Weed CTRL NTV LSCP EN (X0327120)ACRE13$900.00$990.00$1,280.00$900.00
3Rem temp LT con N sal (X1400279)EACH2$1,000.00$1,100.00$1,000.00$1,000.00
4Tree remov acres SPL (X2010350)ACRE1$8,500.00$9,350.00$8,500.00$8,500.00
5Stump removal only (X2010400)UNIT423$5.00$5.50$5.00$5.00
6Seeding CL 4 mod (X2501800)ACRE5$3,200.00$3,520.00$1,582.00$3,200.00
7Seeding CL 5 mod (X2501820)ACRE5$3,500.00$3,850.00$2,573.00$3,500.00
8Mowing SPL (X2503110)ACRE13$120.00$132.00$700.00$120.00
9Cofferdam typ 1 IS WW (X5021512)EACH1$25,000$0.01$20,000$100.00
10SHT pile removal SP (X5220003)SF1,167$15.00$12.50$1.00$1.00
11Memb WTRPRF sys B STR (X5810103)SY298$43.00$48.00$45.00$45.00
12Shoulder rum strip RM (X6420100)SY1,170$22.00$35.00$17.00$17.00
13Engrs FLD ofc TY A D1 (X6700407)CAL MO12$2,500.00$5,000.00$1,000.00$3,800.00
14Traf cont & prot SPL (X7010216)LS1$47,000$100,750$67,000$350,000
15Temp info signing (X7200061)SF288$35.00$35.00$35.00$16.00
16RRPM reflector removl (X7830050)EACH355$10.00$10.00$10.00$6.00
17RRPM reflector replac (X7830052)EACH355$15.00$16.50$15.00$12.00
18Elect serv install SPL (X8040102)EACH2$5,000.00$5,500.00$5,000.00$5,000.00
19Temp lum LED HGHMST I (X8211016)EACH10$4,000.00$4,400.00$4,000.00$4,000.00
20Temp light controller (X8250060)EACH2$10,000$11,000$10,000$10,000
21Temp WP 60 CL 4 (X8302161)EACH2$4,000.00$4,400.00$4,000.00$4,000.00
22Temp TR signal timing (X8900104)EACH1$3,000.00$3,300.00$3,000.00$3,000.00
23Stab constr entrance (Z0013797)SY534$0.01$0.01$0.01$5.00
24Construction layout (Z0013798)LS1$50,000$20,000$24,000$145,000
25Rock fill - foundatn (Z0054406)CY160$80.00$60.00$150.00$180.00
26Temp pavement (Z0062456)SY3,323$43.00$46.50$55.00$58.00
27Trainees (Z0076600)HR500$0.80$0.80$0.80$0.80
28Trainees TPG (Z0076604)HR500$15.00$15.00$15.00$15.00
29Temporary fence (20101000)LF305$5.00$5.50$6.00$5.00
30Tree trunk protection (20101100)EACH6$135.00$220.00$135.00$135.00
31Earth excavation (20200100)CY25,951$21.00$28.00$33.00$32.00
32Furnished excavation (20400800)CY2,137$25.00$0.01$28.00$27.00
33Topsoil exc & plac (21101505)CY4,787$17.00$18.00$22.00$22.00
34Nitrogen fert nutr (25000400)LB1,988$3.00$3.30$3.00$3.00
35Potassium fert nutr (25000600)LB1,988$3.00$3.30$3.00$3.00
36Interseed CL 1B (25003115)ACRE9$1,600.00$1,760.00$2,657.00$1,600.00
37Interseed CL 2A (25003210)ACRE5$1,600.00$1,760.00$1,858.00$1,600.00
38Interseed CL 4A (25003312)ACRE4$1,900.00$2,090.00$1,791.00$1,900.00
39Interseed CL 5A (25003322)ACRE4$2,400.00$2,640.00$2,102.00$2,400.00
40Erosion contr blanket (25100630)SY61,987$1.10$1.21$1.40$1.10
41Wildlife friendly ecb (25100645)SY44,787$1.60$1.76$1.70$1.60
42Temp eros contr seed (28000250)LB1,281$1.00$1.10$3.00$1.00
43Temp ditch checks (28000305)LF2,460$8.00$8.80$4.00$8.00
44Agg ditch checks (28000315)TON9$250.00$275.00$250.00$250.00
45Perimeter eros bar (28000400)LF9,613$2.50$2.75$2.00$2.50
46Inlet & pipe protect (28000500)EACH10$150.00$165.00$62.00$150.00
47Stone riprap CL A4 (28100107)SY2,048$46.00$75.00$90.00$161.00
48Stone riprap CL A5 (28100109)SY129$110.00$85.00$130.00$225.00
49Filter fabric (28200200)SY2,102$2.50$5.00$4.50$3.25
50Agg subgrade improve (30300001)CY100$32.00$60.00$38.00$60.00
51Agg subgrade impr 12 (30300112)SY938$14.75$22.00$29.00$40.00
52Sub gran mat B 4 (31101200)SY3,323$7.25$8.00$12.50$12.00
53Sub gran mat C 4 (31102100)SY158$16.00$8.00$10.50$18.00
54Sub gran mat C 6 (31102300)SY57$26.00$12.00$16.00$32.00
55HMA base cse 10 (35501324)SY379$52.00$67.00$65.00$67.00
56P HMA SC IL-9.5 E N70 (40604172)TON43$170.00$150.00$170.00$160.00
57PCC PVT 15 jointed (42000570)SY342$170.00$180.00$135.00$260.00
58Pavement rem (44000100)SY4,069$12.00$15.00$13.50$13.00
59Conc barrier remov (44001980)LF80$8.50$50.00$22.50$20.00
60Paved SHLD removal (44004250)SY252$8.00$15.00$18.00$17.00
61Dowel bars 1 1/4 (44201298)EACH48$70.00$20.00$20.00$33.00
62Aggregate SHLDS B 6 (48101500)SY576$16.00$14.00$15.00$25.00
63HMA shoulders 8 (48203029)SY158$54.00$55.00$75.00$75.00
64PCC shoulders 9 (48300400)SY57$150.00$120.00$95.00$185.00
65Rem exist struct (50100100)EACH1$25,000$30,000$100,000$600,000
66Pipe culvert remov (50105220)LF891$30.00$20.00$25.00$28.00
67Structure excavation (50200100)CY29$55.00$50.00$100.00$125.00
68Rem/disp uns matl-STR (50200450)CY160$55.00$40.00$50.00$135.00
69Conc struct (50300225)CY31.90$1,600.00$1,000.00$2,700.00$2,300.00
70Conc sup-STR (50300255)CY65$1,250.00$1,200.00$1,600.00$1,300.00
71Protective coat (50300300)SY144$3.50$2.00$5.00$5.00
72Stud shear connectors (50500505)EACH105$40.00$8.00$30.00$28.00
73Reinf bars, epoxy CTD (50800205)LB92,210$1.65$2.00$1.90$1.75
74Bicycle railing (50901720)LF51$340.00$374.00$438.00$340.00
75Parapet railing (50901750)LF128$110.00$121.00$178.00$110.00
76Name plates (51500100)EACH2$800.00$1,500.00$1,000.00$1,100.00
77Temp SHT piling (52200010)SF3,537$53.00$25.00$1.00$1.00
78Fur soldier piles WS (52200105)LF550$360.00$346.88$375.00$330.00
79Drill set SLD PI soil (52200200)CF4,235$28.00$35.00$40.00$35.00
80Untreated timber lag (52200250)SF662.50$40.00$25.00$24.00$23.00
81Conc box cul (54003000)CY261.50$1,850.00$1,200.00$2,000.00$1,700.00
82PCBC 12X9 (54011209)LF185$1,450.00$1,875.00$1,850.00$2,600.00
83P cul CL D 1 15 temp (5421D015)LF891$65.00$90.00$70.00$105.00
84PRC flar end sec 15 (54213660)EACH2$1,600.00$1,200.00$1,150.00$1,100.00
85Storm sew CL A 2 15 (550A0360)LF12$130.00$100.00$105.00$105.00
86Granular backfill STR (58600101)CY33$165.00$50.00$100.00$150.00
87Concrete sealer (58700300)SF850$1.50$2.00$6.00$6.00
88Geocomposite wall DR (59100100)SY379$31.00$35.00$30.00$37.00
89CB TA 4 dia T8G (60200805)EACH2$2,900.00$4,300.00$3,800.00$3,600.00
90Remov catch bas (60500050)EACH1$1,200.00$1,000.00$300.00$300.00
91SPBGR TY A 6FT posts (63000001)LF775$33.00$35.75$31.00$33.00
92Traf bar term T2 (63100045)EACH2$1,600.00$1,760.00$1,980.00$1,600.00
93Traf bar term T6B (63100089)EACH2$4,800.00$5,280.00$4,300.00$4,800.00
94TR bar TRM T1 SPL tan (63100167)EACH2$4,000.00$4,400.00$3,860.00$4,000.00
95Guardrail remov (63200310)LF1,107$5.00$5.50$6.00$5.00
96Mod glar SCR sys temp (63800920)LF3,013$8.00$9.00$12.50$15.00
97Shoulder rum strip 8 (64200108)LF3,172$3.85$3.80$4.50$3.25
98Non SPL waste disposl (66900200)CY6,220$64.00$65.00$70.00$70.00
99Soil disposal analy (66900530)EACH3$800.00$1,815.00$1,450.00$1,500.00
100Reg sub P-const plan (66901001)LS1$5,800.00$2,750.00$3,100.00$3,100.00
101Reg sub F con report (66901003)LS1$500.00$2,750.00$1,200.00$1,200.00
102Reg sub mon (66901006)CAL DAY60$715.00$880.00$1.00$1,000.00
103Mobilization (67100100)LS1$315,000$75,001$335,000$360,000
104Changeable message SN (70107025)CAL DAY568$30.00$40.00$30.00$35.00
105SHRT TRM pavt MK rem (70300150)SF15,286$1.00$3.00$1.00$0.25
106Temp PVT MK LTR & sym T4 tape (70307100)SF42$9.00$25.00$9.00$1.75
107Temp PVT MK L4 T4 tape (70307120)LF42,978$1.55$3.00$0.01$1.35
108Temp PVT MK L6 T4 tape (70307130)LF2,121$2.00$5.00$2.00$2.00
109Temp conc barrier (70400100)LF3,013$27.00$25.00$25.00$26.00
110Rel temp conc barrier (70400200)LF2,963$18.00$15.00$10.50$3.25
111Imp attn temp sun TL3 (70600280)EACH3$8,500.00$10,000$5,892.00$12,000
112Imp attn rel FRD TL3 (70600330)EACH2$2,850.00$2,200.00$2,730.00$3,000.00
113Terminal marker - DA (72501000)EACH2$50.00$55.00$50.00$50.00
114THPL PVT MK LTR & sym (78000100)SF182$7.00$7.70$7.00$6.00
115THPL PVT MK line 4 (78000200)LF3,452$1.25$1.38$1.25$1.00
116THPL PVT MK line 6 (78000400)LF743$1.75$1.93$1.75$1.50
117THPL PVT MK line 12 (78000600)LF112$3.50$3.85$3.50$3.00
118Mod ureth PM LTR-sym (78009000)SF109$5.00$5.50$5.00$9.00
119Mod ureth PM line 4 (78009004)LF29,509$0.65$0.72$0.65$0.71
120Mod ureth PM line 6 (78009006)LF516$1.00$1.10$1.00$1.80
121Mod ureth PM line 24 (78009024)LF95$5.00$5.50$5.00$9.00
122Raised refl pavt MKR (78100100)EACH7$315.00$346.50$315.00$500.00
123Grdrail ref type A (78200005)EACH10$75.00$11.00$15.00$10.00
124Raised ref PVT MK rem (78300200)EACH7$118.00$20.00$50.00$50.00
125PVT MKG rem WTR blast (78300202)SF12,209.50$1.00$1.10$1.00$1.35
126Undrgrd C galvs 2 (81028200)LF300$45.00$49.50$45.00$45.00
127A CBL 3-1C6 mess wire (81800330)LF1,700$20.00$22.00$20.00$20.00
128LT P WD 80 CL3 15MA (83057435)EACH10$16,500$18,150$16,500$16,500
129Rem temp light unit (84100110)EACH10$3,000.00$3,300.00$3,000.00$3,000.00
130Remov elect serv inst (84500120)EACH2$1,000.00$1,100.00$1,000.00$1,000.00
131Elcbl C serv 6 3C (87301815)LF350$15.00$16.50$15.00$15.00
IDOT contract 62P01: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of February 27, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy