IDOT contract 62V12 bid tabulation

Section FAU. Let by Illinois DOT on August 1, 2025, Cook, District 01. 6 bids received; low bid $664,171 by Austin Tyler Construction, Inc..

Owner
Illinois DOT
Letting
01 AUG 2025
Pay items
80
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Austin Tyler Construction, Inc.$664,171Low
2D. Construction, Inc.$672,237+1.0%
3Gallagher Asphalt Corporation$687,050+3.0%
4K-Five Construction Corporation$693,000+4.0%
5P. T. Ferro Construction Co.$696,909+5.0%
6Builders Paving, LLC$727,043+9.0%
IDOT contract 62V12: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Austin Tyler Construction, Inc.2. D. Construction, Inc.3. Gallagher Asphalt Corporation4. K-Five Construction Corporation5. P. T. Ferro Construction Co.6. Builders Paving, LLC
1Weed control teasel (K0029624)GAL1$1,900.00$4,950.00$1,515.00$1,900.00$4,500.00$1,900.00
2Tree root pruning (K1005863)EACH1$500.00$1,925.00$1,890.00$500.00$750.00$500.00
3Constructn layout SPL (X0320050)LS1$7,500.00$5,000.00$2,600.00$1,400.00$4,000.00$4,220.00
4Weed cont basal TRTMT (X0325222)GAL5$1,350.00$2,200.00$975.00$1,350.00$2,000.00$1,350.00
5Ped signal post 5 FT (X1400378)EACH5$1,100.00$1,209.86$1,190.00$1,099.87$1,100.00$1,100.00
6Grading & shap SHLDRS (X2020110)UNIT13$100.00$220.00$205.00$2,154.46$250.00$115.00
7CC&G RMVL repl < = 10 (X4400501)LF30$155.00$80.00$165.00$68.00$100.00$92.50
8CC&G RMVL repl > 10FT (X4400503)LF227$94.00$50.00$75.00$58.00$70.00$82.00
9SS cleaned 12 (X5537800)LF105$4.60$5.50$3.25$5.00$4.60$4.75
10FR & lids adjust SPL (X6030310)EACH1$1,400.00$1,000.00$1,050.00$4,150.00$1,500.00$4,150.00
11Engrs FLD ofc TY A D1 (X6700407)CAL MO12$3,000.00$5,000.00$500.00$3,300.00$1,000.00$2,350.00
12Temp info signing (X7200061)SF128.80$35.00$30.00$37.90$15.00$35.00$35.00
13Accessible ped signal (X8760200)EACH14$1,686.00$1,854.28$1,825.00$1,685.71$1,686.00$1,685.00
14Conc FDN TY A 12D (X8780012)LF20$316.00$347.07$345.00$315.52$316.00$315.00
15Det loop repl (X8860105)LF875$29.35$32.25$31.70$29.32$29.35$30.00
16Video veh det sys (X8891001)EACH1$12,800$14,076$13,840$12,769$12,800$12,800
17Drainage STR cleaned (Z0018500)EACH7$500.00$440.00$380.00$400.00$500.00$500.00
18RE-optimize TR sig sys 1 (Z0033044)EACH2$720.00$792.00$780.00$720.00$720.00$720.00
19Earth excavation (20200100)CY20$120.00$100.00$57.00$50.00$125.00$83.00
20Topsoil F & P 4 (21101615)SY115$19.00$21.73$21.40$19.00$19.75$19.00
21Interseed CL 2A (25003210)ACRE1$2,950.00$3,025.00$2,975.00$2,950.00$2,750.00$2,950.00
22Sodding salt tolerant (25200110)SY115$50.00$28.60$28.15$50.00$26.00$50.00
23Supple watering (25200200)UNIT1$40.00$1.10$1.10$40.00$1.00$40.00
24Bit matls tack CT (40600290)LB10,324$0.01$0.01$0.01$0.01$0.01$0.01
25Long joint sealant (40600370)LF3,925$3.65$5.38$3.80$3.60$4.00$3.50
26Mix CR JTS flangewys (40600400)TON23$250.00$0.01$200.00$50.00$350.00$350.00
27HMA surf rem butt JT (40600982)SY114$15.00$0.01$40.00$0.01$50.00$25.00
28P HMA BC IL-4.75 N50 (40603200)TON631$98.00$102.00$128.00$130.08$110.00$112.50
29HMA SC IL-9.5 D N50 (40604060)TON1,285$80.00$76.00$96.00$97.92$90.00$96.50
30Protective coat (42001300)SY288$5.00$1.00$0.01$2.00$1.50$0.01
31PC conc sidewalk 5 (42400200)SF1,665$10.50$12.00$9.00$10.00$13.50$14.25
32Detectable warnings (42400800)SF80$40.00$40.00$40.00$25.00$20.00$44.00
33HMA surf rem 2 1/4 (44000158)SY15,294$3.00$2.00$2.80$3.58$4.25$5.00
34Sidewalk rem (44000600)SF1,698$2.50$3.00$4.70$2.00$3.00$6.50
35CL D patch T1 11 (44201773)SY20$200.00$180.00$450.00$45.00$160.00$142.00
36CL D patch T2 11 (44201777)SY125$125.00$127.00$185.00$45.00$140.00$108.00
37CL D patch T3 11 (44201781)SY110$110.00$127.00$155.00$45.00$120.00$104.00
38CL D patch T4 11 (44201783)SY265$105.00$127.00$135.00$45.00$100.00$103.00
39Agg wedge SHLD type B (48102100)TON1,242$40.00$25.00$32.50$0.01$38.00$35.00
40CB adjust (60250200)EACH1$410.00$1,000.00$500.00$650.00$350.00$650.00
41Man adjust (60255500)EACH1$410.00$1,000.00$500.00$825.00$500.00$825.00
42FR & grates adjust (60300105)EACH6$410.00$1,000.00$500.00$650.00$500.00$650.00
43Pipe culv cleaned 12 (60920012)LF40$4.60$7.70$3.25$7.00$4.60$4.60
44Pipe culv cleaned 18 (60920018)LF240$5.75$7.70$4.35$7.00$5.75$5.75
45Pipe culv cleaned 36 (60920036)LF105$8.55$9.90$6.50$9.00$8.00$8.00
46SPBGR TY A 6FT posts (63000001)LF50$100.00$82.50$64.90$99.61$99.65$100.00
47Guardrail remov (63200310)LF50$10.90$5.50$21.65$10.88$11.00$11.00
48Non SPL waste disposl (66900200)CY20$200.00$120.00$110.00$125.00$100.00$85.00
49Soil disposal analy (66900530)EACH1$1,370.00$1,750.00$1,485.00$1,450.00$1,980.00$1,370.00
50Reg sub P-const plan (66901001)LS1$3,400.00$2,250.00$3,680.00$3,100.00$2,700.00$3,400.00
51Reg sub F con report (66901003)LS1$500.00$2,250.00$5.45$1,200.00$2,300.00$500.00
52Reg sub mon (66901006)CAL DAY4$800.00$900.00$870.00$680.00$1,000.00$800.00
53Mobilization (67100100)LS1$25,000$21,550$41,000$43,000$41,000$41,439
54Traf cont-prot 701201 (70100450)LS1$500.00$0.01$501.00$1.00$500.00$500.00
55Traf cont-prot 701306 (70100460)LS1$4,500.00$35,154$14,850$66,872$4,500.00$4,500.00
56TR cont & prot 701801 (70102640)LS1$500.00$0.01$501.00$1.00$500.00$500.00
57Short term pavt mking (70300100)LF1,404$5.00$0.01$0.01$1.00$2.00$1.50
58SHRT TRM pavt MK rem (70300150)SF468$2.50$0.01$0.01$2.00$4.00$0.01
59Temp PVT MK line 4 - paint (70300221)LF32,811$0.35$0.01$0.01$0.01$0.35$0.35
60Temp PVT MK line 6 - paint (70300241)LF561$0.50$0.01$0.01$0.01$0.50$0.50
61Temp PVT MK line 12 - paint (70300261)LF1,278$1.10$0.01$0.01$0.01$1.10$1.10
62Temp PVT MK line 24 - paint (70300281)LF144$2.15$0.01$0.01$0.01$2.15$2.15
63Reloc sign panel T1 (72400710)SF6$31.00$33.23$55.00$25.00$50.00$50.00
64THPL PVT MK line 4 (78000200)LF10,937$0.90$0.99$1.00$0.90$0.90$0.90
65THPL PVT MK line 6 (78000400)LF187$1.50$1.65$1.65$1.50$1.50$1.50
66THPL PVT MK line 12 (78000600)LF426$3.00$3.30$3.25$3.00$3.00$3.00
67THPL PVT MK line 24 (78000650)LF48$6.00$6.60$6.50$6.00$6.00$6.00
68Raised refl pavt MKR (78100100)EACH80$46.75$51.43$50.55$46.75$56.00$46.75
69Raised ref PVT MK rem (78300200)EACH80$15.00$8.00$0.01$15.00$0.01$22.00
70Undrgrd C galvs 2 (81028200)LF58$104.00$113.83$115.00$103.48$104.00$103.50
71Main EX TR sig instal (85000200)EACH2$1,794.00$1,973.18$1,940.00$1,793.80$1,794.00$1,795.00
72Elcbl C signal 14 2C (87301215)LF750$3.25$3.54$3.50$3.22$3.25$3.25
73Elcbl C signal 14 3C (87301225)LF781$3.45$3.76$3.70$3.42$3.50$3.50
74Elcbl C egrdc 6 1C (87301900)LF83$4.15$4.57$4.50$4.15$4.15$4.00
75Drill EX handhole (87900200)EACH5$430.00$472.34$465.00$429.40$430.00$430.00
76Ped SH LED 1F BM CDT (88102717)EACH6$615.00$676.18$665.00$614.71$615.00$615.00
77Mod EX contr (89502200)EACH1$750.00$823.02$810.00$748.20$750.00$750.00
78Rem elcbl FR con (89502300)LF93$6.00$6.57$6.50$5.97$6.00$6.00
79Remov EX TS equip (89502375)EACH1$508.00$558.43$550.00$507.66$508.00$508.00
80Rebuild EX handhole (89502376)EACH1$2,170.00$2,385.11$2,345.00$2,168.28$2,170.00$2,165.00
IDOT contract 62V12: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of August 1, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy