IDOT contract 62X50 bid tabulation
Section 2024-1012-SW,RS. Let by Illinois DOT on August 1, 2025, Will, District 01. 5 bids received; low bid $975,357 by Gallagher Asphalt Corporation.
- Owner
- Illinois DOT
- Letting
- 01 AUG 2025
- Pay items
- 62
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Gallagher Asphalt Corporation | $975,357 | Low |
| 2 | D. Construction, Inc. | $977,009 | 0.0% |
| 3 | P. T. Ferro Construction Co. | $1,007,849 | +3.0% |
| 4 | Austin Tyler Construction, Inc. | $1,067,594 | +9.0% |
| 5 | M & J Underground Inc. | $1,619,466 | +66% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Gallagher Asphalt Corporation | 2. D. Construction, Inc. | 3. P. T. Ferro Construction Co. | 4. Austin Tyler Construction, Inc. | 5. M & J Underground Inc. |
|---|---|---|---|---|---|---|---|---|
| 1 | Temporary ramp SPL (X4060995) | SY | 80 | $38.00 | $0.01 | $55.00 | $0.01 | $45.00 |
| 2 | PC conc sidewalk 5 SP (X4240430) | SF | 13,985 | $11.40 | $13.00 | $12.50 | $9.50 | $30.00 |
| 3 | PC conc sidewalk 8 SP (X4240460) | SF | 1,540 | $17.70 | $16.00 | $19.00 | $14.50 | $32.00 |
| 4 | SS cleaned 12 (X5537800) | LF | 45 | $5.50 | $55.00 | $50.00 | $50.00 | $13.00 |
| 5 | FR & lids adjust SPL (X6030310) | EACH | 3 | $1,400.00 | $1,000.00 | $1,200.00 | $1,200.00 | $2,500.00 |
| 6 | Comb CC&G TM2.12 SPL (X6060075) | LF | 1,110 | $36.50 | $34.00 | $36.50 | $35.00 | $47.00 |
| 7 | Comb CC&G TM4.12 SPL (X6060086) | LF | 2,530 | $36.50 | $35.00 | $38.00 | $40.00 | $49.00 |
| 8 | Engrs FLD ofc TY A D1 (X6700407) | CAL MO | 12 | $500.00 | $4,000.00 | $0.01 | $3,000.00 | $6,000.00 |
| 9 | Construction layout (Z0013798) | LS | 1 | $5,500.00 | $12,000 | $15,000 | $18,000 | $19,000 |
| 10 | Drainage STR cleaned (Z0018500) | EACH | 3 | $1,000.00 | $2,200.00 | $2,000.00 | $350.00 | $407.00 |
| 11 | Temp info signing (Z0030850) | SF | 104 | $20.00 | $25.00 | $35.00 | $50.00 | $25.00 |
| 12 | Earth excavation (20200100) | CY | 200 | $100.00 | $50.00 | $100.00 | $25.00 | $100.00 |
| 13 | Trench backfill (20800150) | CY | 15 | $70.00 | $65.00 | $80.00 | $60.00 | $110.00 |
| 14 | Topsoil F & P 4 (21101615) | SY | 270 | $20.00 | $7.70 | $7.00 | $17.00 | $7.00 |
| 15 | Sodding salt tolerant (25200110) | SY | 270 | $20.00 | $33.00 | $30.00 | $37.00 | $79.00 |
| 16 | Agg base cse B (35101500) | CY | 16 | $46.00 | $60.00 | $115.00 | $165.00 | $120.00 |
| 17 | Agg base cse B 6 (35101800) | SY | 640 | $17.50 | $10.50 | $18.00 | $28.00 | $25.00 |
| 18 | HMA base cse 6 (35501308) | SY | 11 | $93.00 | $70.00 | $90.00 | $70.00 | $290.00 |
| 19 | HMA base cse 8 (35501316) | SY | 85 | $111.00 | $60.00 | $115.00 | $87.00 | $111.00 |
| 20 | Bit matls tack CT (40600290) | LB | 5,085 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 21 | Long joint sealant (40600370) | LF | 2,070 | $6.50 | $6.47 | $8.00 | $5.70 | $8.00 |
| 22 | Mix CR JTS flangewys (40600400) | TON | 12 | $100.00 | $300.00 | $0.01 | $285.00 | $611.00 |
| 23 | HMA surf rem butt JT (40600982) | SY | 197 | $17.50 | $0.01 | $0.01 | $20.00 | $0.01 |
| 24 | HMA BC IL-9.5 N70 (40602985) | TON | 835 | $107.00 | $80.00 | $98.00 | $83.00 | $145.00 |
| 25 | HMA SC IL-9.5 D N50 (40604060) | TON | 5 | $430.00 | $130.00 | $1,000.00 | $190.00 | $1,132.00 |
| 26 | P HMA SC IL-9.5 E N70 (40604172) | TON | 735 | $127.00 | $103.00 | $125.00 | $110.00 | $167.00 |
| 27 | Protective coat (42001300) | SY | 2,390 | $1.00 | $1.00 | $0.01 | $5.00 | $2.00 |
| 28 | Detectable warnings (42400800) | SF | 350 | $23.00 | $40.00 | $20.00 | $40.00 | $30.00 |
| 29 | HMA surf rem 4 1/4 (44000166) | SY | 7,420 | $5.80 | $3.75 | $7.00 | $6.00 | $7.00 |
| 30 | Drive pavement rem (44000200) | SY | 95 | $41.00 | $15.00 | $34.00 | $22.00 | $30.00 |
| 31 | Curb rem (44000300) | LF | 3,190 | $12.20 | $8.00 | $16.50 | $19.00 | $16.00 |
| 32 | Sidewalk rem (44000600) | SF | 15,525 | $2.50 | $3.00 | $2.50 | $3.50 | $5.00 |
| 33 | CL D patch T2 9 (44201753) | SY | 40 | $180.00 | $90.00 | $125.00 | $130.00 | $134.00 |
| 34 | CL D patch T3 9 (44201757) | SY | 120 | $130.00 | $90.00 | $110.00 | $125.00 | $134.00 |
| 35 | CL D patch T4 9 (44201759) | SY | 270 | $120.00 | $90.00 | $88.00 | $110.00 | $134.00 |
| 36 | Storm sew CL A 1 12 (550A0050) | LF | 35 | $148.00 | $200.00 | $160.00 | $82.00 | $160.00 |
| 37 | CB TC T1F OL (60206905) | EACH | 1 | $3,400.00 | $2,200.00 | $4,000.00 | $2,650.00 | $3,400.00 |
| 38 | Man TA 4 dia T1F CL (60218400) | EACH | 1 | $6,100.00 | $4,200.00 | $5,000.00 | $2,650.00 | $4,400.00 |
| 39 | Man adjust (60255500) | EACH | 3 | $680.00 | $850.00 | $600.00 | $400.00 | $690.00 |
| 40 | FR & grates adjust (60300105) | EACH | 21 | $410.00 | $650.00 | $465.00 | $400.00 | $690.00 |
| 41 | Non SPL waste disposl (66900200) | CY | 200 | $90.00 | $70.00 | $85.00 | $200.00 | $181.00 |
| 42 | Soil disposal analy (66900530) | EACH | 3 | $1,800.00 | $1,650.00 | $1,785.00 | $1,785.00 | $1,600.00 |
| 43 | Reg sub P-const plan (66901001) | LS | 1 | $2,400.00 | $2,250.00 | $3,400.00 | $3,400.00 | $4,300.00 |
| 44 | Reg sub F con report (66901003) | LS | 1 | $500.00 | $2,250.00 | $500.00 | $500.00 | $1,700.00 |
| 45 | Reg sub mon (66901006) | CAL DAY | 5 | $900.00 | $900.00 | $900.00 | $900.00 | $1,500.00 |
| 46 | Mobilization (67100100) | LS | 1 | $58,000 | $56,200 | $55,000 | $56,000 | $25,000 |
| 47 | TR cont & prot 701501 (70102621) | EACH | 1 | $51,200 | $87,850 | $49,000 | $6,000.00 | $18,000 |
| 48 | TR cont & prot 701701 (70102635) | LS | 1 | $100.00 | $0.01 | $1,500.00 | $21,000 | $112.00 |
| 49 | TR cont & prot 701801 (70102640) | LS | 1 | $100.00 | $0.01 | $1,500.00 | $3,000.00 | $112.00 |
| 50 | Short term pavt mking (70300100) | LF | 22,500 | $0.01 | $0.01 | $0.01 | $2.00 | $2.25 |
| 51 | SHRT TRM pavt MK rem (70300150) | SF | 1,875 | $0.01 | $0.01 | $0.01 | $2.50 | $3.00 |
| 52 | Temp PVT MK line 4 - paint (70300221) | LF | 19,245 | $0.01 | $0.01 | $0.01 | $0.50 | $1.25 |
| 53 | Temp PVT MK line 6 - paint (70300241) | LF | 1,815 | $0.01 | $0.01 | $0.01 | $1.25 | $1.50 |
| 54 | Temp PVT MK line 12 - paint (70300261) | LF | 420 | $0.01 | $0.01 | $0.01 | $3.00 | $3.50 |
| 55 | Temp PVT MK line 24 - paint (70300281) | LF | 195 | $0.01 | $0.01 | $0.01 | $6.00 | $6.75 |
| 56 | Temp PVT MK L4 T4 tape (70307120) | LF | 3,650 | $1.40 | $0.01 | $2.35 | $2.00 | $2.50 |
| 57 | THPL PVT MK line 4 (78000200) | LF | 6,415 | $1.00 | $1.09 | $0.99 | $1.00 | $1.25 |
| 58 | THPL PVT MK line 6 (78000400) | LF | 605 | $1.45 | $1.60 | $1.45 | $4.00 | $4.50 |
| 59 | THPL PVT MK line 12 (78000600) | LF | 140 | $3.00 | $3.30 | $3.00 | $8.00 | $9.00 |
| 60 | THPL PVT MK line 24 (78000650) | LF | 65 | $6.00 | $6.60 | $6.00 | $16.00 | $18.00 |
| 61 | Raised refl pavt MKR (78100100) | EACH | 100 | $50.00 | $55.00 | $50.00 | $80.00 | $150.00 |
| 62 | Raised ref PVT MK rem (78300200) | EACH | 100 | $0.01 | $10.00 | $0.01 | $15.00 | $120.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of August 1, 2025. Compiled by Mirage Metrics.