M & J Underground Inc.: IDOT bid record
M & J Underground Inc. submitted 20 bids on Illinois DOT contracts in the data, from 05 MAR 2021 to 31 JUL 2026, and was the low bidder on 5 of them (25%). When it was not low, its total sat a median +33% above the low bid.
- Owner
- Illinois DOT
- Low bid volume
- $3,931,182
- Latest bid
- 31 JUL 2026
- Data through
- 18 SEP 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2021 | 2 | 1 | 50% |
| 2022 | 2 | 1 | 50% |
| 2023 | 3 | 1 | 33% |
| 2024 | 3 | 0 | 0% |
| 2025 | 5 | 2 | 40% |
| 2026 | 5 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 01 | 14 | 2 | 14% |
| District 03 | 6 | 3 | 50% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Bit matls tack CT | 40600290 | LB | 12 | 12 (100%) | $0.01 | $0.01 |
| Bit matls PR CT | 40600275 | LB | 7 | 7 (100%) | $0.01 | $0.01 |
| Topsoil F & P 4 | 21101615 | SY | 10 | 6 (60%) | $5.18 | $6.60 |
| PC conc sidewalk 5 | 42400200 | SF | 13 | 4 (31%) | $9.00 | $10.00 |
| THPL PVT MK line 24 | 78000650 | LF | 12 | 4 (33%) | $9.12 | $6.00 |
| Reg sub mon | 66901006 | CAL DAY | 9 | 4 (44%) | $750.74 | $820.00 |
| Man TA 5 dia T1F CL | 60221100 | EACH | 5 | 4 (80%) | $3,392.00 | $5,522.78 |
| Detectable warnings | 42400800 | SF | 14 | 3 (21%) | $25.00 | $37.00 |
| THPL PVT MK line 4 | 78000200 | LF | 11 | 3 (27%) | $1.25 | $0.88 |
| THPL PVT MK line 12 | 78000600 | LF | 11 | 3 (27%) | $4.60 | $3.10 |
| Erosion contr blanket | 25100630 | SY | 10 | 3 (30%) | $1.38 | $1.85 |
| Soil disposal analy | 66900530 | EACH | 9 | 3 (33%) | $1,500.00 | $1,470.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| D. Construction, Inc. | 11 | 9 of 11 |
| Gallagher Asphalt Corporation | 10 | 6 of 10 |
| Davis Concrete Construction Co. | 7 | 2 of 7 |
| K-Five Construction Corporation | 6 | 4 of 6 |
| P. T. Ferro Construction Co. | 5 | 3 of 5 |
| Iroquois Paving Corporation | 5 | 5 of 5 |
| MYS, Incorporated | 3 | 1 of 3 |
| Kankakee Valley Construction Company, Inc. | 3 | 0 of 3 |
| Austin Tyler Construction, Inc. | 3 | 2 of 3 |
| Lorig Construction Company | 2 | 2 of 2 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 31 JUL 2026 | 62T84 | District 01 | Section FAU | 3 of 3 | $2,358,211 | +52% |
| 27 FEB 2026 | 61L87 | District 01 | Riverdale, section 24-00141-00-RS | 4 of 5 | $1,044,265 | +16% |
| 27 FEB 2026 | 61M05 | District 01 | South Holland, section 22-00116-00-RS | 4 of 5 | $364,977 | +25% |
| 27 FEB 2026 | 61M18 | District 01 | Hazel Crest, section 25-00097-00-RS | 5 of 5 | $609,219 | +52% |
| 16 JAN 2026 | 61L99 | District 01 | University Park, section 05-00017-00-LS | 3 of 6 | $2,318,083 | +27% |
| 01 AUG 2025 | 62X50 | District 01 | Section 2024-1012-SW,RS | 5 of 5 | $1,619,466 | +66% |
| 01 AUG 2025 | 87904 | District 03 | City Of Lasalle, section 19-00082-00-SW | 7 of 7 | $583,146 | +71% |
| 13 JUN 2025 | 87874 | District 03 | Grant Park, section 21-00017-00-PV | 1 of 3 | $2,806,802 | Low, 16% under the second |
| 13 JUN 2025 | 87883 | District 03 | Bradley, section 21-00100-00-BT | 1 of 4 | $327,924 | Low, 3.0% under the second |
| 25 APR 2025 | 61L06 | District 01 | Park Forest, section 20-00106-00-PV | 3 of 4 | $7,220,866 | +17% |
| 20 SEP 2024 | 62W88 | District 01 | Section 2024-963-N | 9 of 9 | $1,100,018 | +48% |
| 02 AUG 2024 | 87848 | District 03 | Project Number: Irel-966- / /, section 20-01009-01-BR | 6 of 6 | $959,953 | +141% |
| 08 MAR 2024 | 61K17 | District 01 | Monee, section 22-00034-00-SW | 2 of 6 | $418,000 | 0.0% |
| 22 SEP 2023 | 61H30 | District 01 | Crestwood, section 14-00033-00-SP | 3 of 3 | $6,187,701 | +36% |
| 10 MAR 2023 | 87812 | District 03 | Grant Park, section 21-00018-00-BT | 1 of 5 | $269,969 | Low, 11% under the second |
| 20 JAN 2023 | 61H99 | District 01 | Crete, section 15-00049-00-PV | 2 of 6 | $2,322,080 | +6.0% |
| 21 JAN 2022 | 62D49 | District 01 | Section 10WB-B | 4 of 4 | $1,744,999 | +33% |
| 21 JAN 2022 | 62L09 | District 01 | Section 2020-037-PP | 1 of 1 | $207,992 | Low |
| 30 JUL 2021 | 66L21 | District 03 | Section (130)CLV | 3 of 5 | $281,618 | +27% |
| 05 MAR 2021 | 62L36 | District 01 | Section 2020-058-SW | 1 of 5 | $318,495 | Low, 18% under the second |
How this record was read
IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
- Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.