IDOT contract 61L87 bid tabulation
Riverdale, section 24-00141-00-RS. Let by Illinois DOT on February 27, 2026, Cook, District 01. 5 bids received; low bid $902,962 by Gallagher Asphalt Corporation.
- Owner
- Illinois DOT
- Letting
- 27 FEB 2026
- Pay items
- 73
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Gallagher Asphalt Corporation | $902,962 | Low |
| 2 | K-Five Construction Corporation | $942,000 | +4.0% |
| 3 | D. Construction, Inc. | $952,844 | +6.0% |
| 4 | M & J Underground Inc. | $1,044,265 | +16% |
| 5 | Everlast Blacktop Inc. | $1,138,920 | +26% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Gallagher Asphalt Corporation | 2. K-Five Construction Corporation | 3. D. Construction, Inc. | 4. M & J Underground Inc. | 5. Everlast Blacktop Inc. |
|---|---|---|---|---|---|---|---|---|
| 1 | Strip ref CR con TR (LR443200) | LF | 4,643 | $0.01 | $0.01 | $3.27 | $4.02 | $4.00 |
| 2 | Explor excavation (XX005206) | LF | 5 | $37.00 | $100.00 | $0.01 | $548.20 | $250.00 |
| 3 | PVC CS pipe repl 10" (XX006448) | LF | 30 | $130.00 | $225.00 | $500.00 | $167.64 | $185.00 |
| 4 | Conc truck washout (XX006821) | LS | 1 | $1,200.00 | $500.00 | $2,500.00 | $600.00 | $1,500.00 |
| 5 | HMA surf rem var DP (X4401198) | SY | 17,450 | $2.90 | $4.00 | $3.00 | $6.03 | $3.79 |
| 6 | Pavt removal SPL (X4404400) | SY | 50 | $27.30 | $50.00 | $0.01 | $22.10 | $25.00 |
| 7 | Connect EX manhole (X6020399) | EACH | 1 | $400.00 | $1,232.00 | $3,500.00 | $2,286.07 | $4,500.00 |
| 8 | FR & lids adjust SPL (X6030310) | EACH | 10 | $725.00 | $1,250.00 | $900.00 | $1,627.85 | $1,250.00 |
| 9 | Temp info signing (X7200061) | SF | 52 | $16.40 | $15.00 | $30.00 | $36.02 | $35.00 |
| 10 | Det loop repl (X8860105) | LF | 75 | $79.00 | $70.00 | $79.44 | $74.33 | $30.00 |
| 11 | Temp TR signal timing (X8900104) | EACH | 1 | $1,750.00 | $1,600.00 | $1,765.50 | $1,440.90 | $6,500.00 |
| 12 | Drain util STR adj (Z0017400) | EACH | 18 | $340.00 | $850.00 | $1,000.00 | $458.56 | $950.00 |
| 13 | Tree trunk protection (20101100) | EACH | 4 | $760.00 | $135.00 | $330.00 | $126.83 | $770.00 |
| 14 | Tree root pruning (20101200) | EACH | 4 | $760.00 | $150.00 | $330.00 | $218.28 | $770.00 |
| 15 | Earth excavation (20200100) | CY | 50 | $90.00 | $50.00 | $100.00 | $79.54 | $80.00 |
| 16 | Trench backfill (20800150) | CY | 6 | $90.00 | $23.00 | $150.00 | $88.96 | $100.00 |
| 17 | Topsoil F & P 4 (21101615) | SY | 1,210 | $13.60 | $9.00 | $13.86 | $3.09 | $6.00 |
| 18 | Seeding CL 1A (25000110) | ACRE | 0.25 | $1,960.00 | $10,440 | $8,250.00 | $2,490.69 | $5,000.00 |
| 19 | Nitrogen fert nutr (25000400) | LB | 20 | $27.00 | $4.00 | $3.30 | $3.09 | $3.00 |
| 20 | Phosphorus fert nutr (25000500) | LB | 20 | $27.00 | $4.00 | $3.30 | $3.09 | $3.00 |
| 21 | Potassium fert nutr (25000600) | LB | 20 | $27.00 | $4.00 | $3.30 | $3.09 | $3.00 |
| 22 | Erosion contr blanket (25100630) | SY | 1,210 | $13.60 | $1.00 | $2.15 | $25.73 | $2.00 |
| 23 | Temp eros contr seed (28000250) | LB | 25 | $19.60 | $4.00 | $11.00 | $51.46 | $5.00 |
| 24 | Inlet filters (28000510) | EACH | 25 | $150.00 | $200.00 | $319.00 | $210.18 | $160.00 |
| 25 | Preparation of base (35800100) | SY | 17,450 | $0.01 | $0.90 | $1.75 | $1.61 | $2.00 |
| 26 | Agg base repair (35800200) | TON | 40 | $60.00 | $40.00 | $40.00 | $42.18 | $60.00 |
| 27 | Bit matls tack CT (40600290) | LB | 8,100 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 28 | Long joint sealant (40600370) | LF | 5,000 | $3.90 | $4.50 | $4.22 | $4.92 | $3.75 |
| 29 | Mix CR JTS flangewys (40600400) | TON | 20 | $200.00 | $50.00 | $0.01 | $0.01 | $250.00 |
| 30 | HMA surf rem butt JT (40600982) | SY | 190 | $60.00 | $30.00 | $0.01 | $0.01 | $25.00 |
| 31 | HMA BC IL-9.5 N50 (40602978) | TON | 1,550 | $86.00 | $93.00 | $74.50 | $94.41 | $90.61 |
| 32 | HMA SC IL-9.5 D N50 (40604060) | TON | 1,825 | $86.00 | $93.00 | $78.50 | $98.43 | $93.17 |
| 33 | Incidental HMA surf (40800050) | TON | 7 | $250.00 | $1,500.00 | $150.00 | $502.18 | $150.00 |
| 34 | PCC PVT 8 (42000300) | SY | 120 | $90.00 | $110.00 | $90.00 | $130.66 | $145.00 |
| 35 | Protective coat (42101300) | SY | 1,730 | $0.01 | $1.00 | $1.00 | $1.10 | $3.00 |
| 36 | PCC driveway pavt 7 (42300300) | SY | 210 | $90.00 | $80.00 | $85.00 | $113.73 | $130.00 |
| 37 | PC conc sidewalk 5 (42400200) | SF | 8,580 | $7.00 | $9.50 | $10.00 | $7.70 | $12.50 |
| 38 | Detectable warnings (42400800) | SF | 550 | $20.00 | $20.00 | $35.00 | $24.09 | $45.00 |
| 39 | Pavement rem (44000100) | SY | 120 | $28.00 | $22.00 | $25.00 | $50.19 | $5.00 |
| 40 | HMA surf rem 3 (44000161) | SY | 45 | $38.00 | $4.25 | $10.00 | $22.10 | $5.00 |
| 41 | Drive pavement rem (44000200) | SY | 255 | $28.00 | $20.00 | $12.00 | $30.51 | $18.00 |
| 42 | Comb curb gutter rem (44000500) | LF | 2,220 | $17.00 | $10.00 | $10.00 | $13.10 | $12.00 |
| 43 | Sidewalk rem (44000600) | SF | 8,580 | $3.00 | $1.50 | $2.00 | $2.82 | $2.50 |
| 44 | CL D patch T2 5 (44201705) | SY | 500 | $45.00 | $17.00 | $55.00 | $35.15 | $64.00 |
| 45 | CL D patch T3 5 (44201709) | SY | 500 | $35.00 | $17.00 | $50.00 | $35.15 | $66.00 |
| 46 | CL D patch T4 5 (44201711) | SY | 500 | $25.00 | $34.00 | $50.00 | $35.15 | $68.00 |
| 47 | Dom wat ser box adj (56500600) | EACH | 2 | $250.00 | $350.00 | $400.00 | $237.30 | $850.00 |
| 48 | CB TA 4 dia T1F OL (60200105) | EACH | 1 | $4,500.00 | $8,950.00 | $4,500.00 | $3,220.12 | $8,000.00 |
| 49 | Inlets TA T1F OL (60234200) | EACH | 1 | $240.00 | $3,685.00 | $2,200.00 | $2,137.19 | $6,800.00 |
| 50 | FR & lids T1 OL (60406000) | EACH | 11 | $360.00 | $485.00 | $600.00 | $364.81 | $1,150.00 |
| 51 | FR & lids T1 CL (60406100) | EACH | 6 | $360.00 | $485.00 | $600.00 | $364.81 | $1,250.00 |
| 52 | Comb CC&G TB6.12 mod (60604100) | LF | 2,220 | $30.00 | $30.00 | $32.00 | $47.89 | $40.00 |
| 53 | Non SPL waste disposl (66900200) | CY | 12 | $175.00 | $125.00 | $200.00 | $104.19 | $80.00 |
| 54 | Soil disposal analy (66900530) | EACH | 1 | $1,580.00 | $1,450.00 | $1,595.00 | $2,032.69 | $2,200.00 |
| 55 | Reg sub P-const plan (66901001) | LS | 1 | $3,378.00 | $3,100.00 | $3,410.00 | $2,367.19 | $2,500.00 |
| 56 | Reg sub F con report (66901003) | LS | 1 | $1,308.00 | $1,200.00 | $1,320.00 | $2,161.35 | $2,300.00 |
| 57 | Reg sub mon (66901006) | CAL DAY | 15 | $740.00 | $680.00 | $750.00 | $1,024.07 | $1,100.00 |
| 58 | Mobilization (67100100) | LS | 1 | $54,000 | $59,044 | $57,170 | $33,562 | $53,502 |
| 59 | TR cont & prot 701501 (70102620) | LS | 1 | $40,000 | $40,000 | $33,680 | $6,689.88 | $12,050 |
| 60 | TR cont & prot 701701 (70102635) | LS | 1 | $2,350.00 | $1.00 | $0.01 | $514.61 | $1.00 |
| 61 | TR cont & prot 701801 (70102640) | LS | 1 | $2,350.00 | $1.00 | $0.01 | $514.61 | $11,500 |
| 62 | Short term pavt mking (70300100) | LF | 1,700 | $0.01 | $3.00 | $0.01 | $1.51 | $1.50 |
| 63 | SHRT TRM pavt MK rem (70300150) | SF | 575 | $0.01 | $4.00 | $0.01 | $1.52 | $3.00 |
| 64 | Sign panel T1 (72000100) | SF | 28 | $41.00 | $37.50 | $27.50 | $36.02 | $45.00 |
| 65 | Metal post TY A (72900100) | LF | 28 | $27.00 | $25.00 | $14.30 | $15.44 | $18.00 |
| 66 | THPL PVT MK LTR & sym (78000100) | SF | 190 | $6.50 | $6.00 | $6.60 | $6.18 | $18.00 |
| 67 | THPL PVT MK line 4 (78000200) | LF | 8,230 | $0.50 | $0.50 | $0.55 | $0.51 | $1.10 |
| 68 | THPL PVT MK line 6 (78000400) | LF | 1,280 | $1.10 | $1.00 | $1.10 | $1.03 | $2.20 |
| 69 | THPL PVT MK line 12 (78000600) | LF | 910 | $3.25 | $3.00 | $3.30 | $3.09 | $6.00 |
| 70 | THPL PVT MK line 24 (78000650) | LF | 420 | $6.55 | $6.00 | $6.60 | $6.18 | $7.00 |
| 71 | Main EX TR sig instal (85000200) | EACH | 1 | $3,815.00 | $3,500.00 | $3,850.00 | $1,651.89 | $3,000.00 |
| 72 | Elcbl C lead 14 1PR (87301305) | LF | 25 | $3.75 | $3.00 | $3.77 | $3.53 | $50.00 |
| 73 | Rem elcbl FR con (89502300) | LF | 25 | $1.20 | $1.00 | $1.21 | $1.13 | $50.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of February 27, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.