IDOT contract 87904 bid tabulation
City Of Lasalle, section 19-00082-00-SW. Let by Illinois DOT on August 1, 2025, Lasalle, District 03. 7 bids received; low bid $340,268 by Gensini Excavating, Inc..
- Owner
- Illinois DOT
- Letting
- 01 AUG 2025
- Pay items
- 18
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Gensini Excavating, Inc. | $340,268 | Low |
| 2 | Meade Inc. | $347,710 | +2.0% |
| 3 | Gillan Construction LLC | $365,613 | +7.0% |
| 4 | Cruz Concrete, Inc. | $375,236 | +10% |
| 5 | Davis Concrete Construction Co. | $414,388 | +22% |
| 6 | Advanced Asphalt Company | $531,593 | +56% |
| 7 | M & J Underground Inc. | $583,146 | +71% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Gensini Excavating, Inc. | 2. Meade Inc. | 3. Gillan Construction LLC | 4. Cruz Concrete, Inc. | 5. Davis Concrete Construction Co. | 6. Advanced Asphalt Company |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Traf cont & prot SPL (X7010216) | LS | 1 | $12,000 | $800.00 | $7,500.00 | $5,000.00 | $10,000 | $9,300.00 |
| 2 | Earth excavation (20200100) | CY | 105 | $75.00 | $31.00 | $44.00 | $22.00 | $25.00 | $65.00 |
| 3 | Topsoil F & P 4 (21101615) | SY | 1,890 | $8.00 | $4.70 | $4.00 | $11.00 | $2.00 | $9.00 |
| 4 | Seeding CL 1A (25000110) | ACRE | 0.39 | $12,500 | $1,100.00 | $19,000 | $6,000.00 | $20,000 | $10,000 |
| 5 | Nitrogen fert nutr (25000400) | LB | 35 | $2.00 | $4.00 | $5.00 | $7.00 | $1.00 | $9.00 |
| 6 | Phosphorus fert nutr (25000500) | LB | 35 | $2.00 | $4.00 | $5.00 | $7.00 | $1.00 | $9.00 |
| 7 | Potassium fert nutr (25000600) | LB | 35 | $2.00 | $4.00 | $5.00 | $7.00 | $1.00 | $9.00 |
| 8 | Erosion contr blanket (25100630) | SY | 1,890 | $2.50 | $2.25 | $3.50 | $2.00 | $1.00 | $3.75 |
| 9 | Inlet & pipe protect (28000500) | EACH | 12 | $150.00 | $70.00 | $200.00 | $125.00 | $10.00 | $140.00 |
| 10 | PCC driveway pavt 7 (42300300) | SY | 475 | $90.00 | $102.00 | $97.00 | $80.00 | $91.00 | $120.00 |
| 11 | PC conc sidewalk 5 (42400200) | SF | 17,349 | $8.70 | $9.30 | $10.00 | $11.00 | $11.50 | $13.00 |
| 12 | Detectable warnings (42400800) | SF | 259 | $35.00 | $31.50 | $28.00 | $27.00 | $27.00 | $25.00 |
| 13 | Drive pavement rem (44000200) | SY | 506 | $10.00 | $13.50 | $9.00 | $15.00 | $21.00 | $20.00 |
| 14 | Comb curb gutter rem (44000500) | LF | 873 | $7.00 | $11.55 | $10.00 | $10.00 | $12.00 | $35.00 |
| 15 | Sidewalk rem (44000600) | SF | 14,577 | $1.50 | $3.20 | $2.00 | $2.75 | $3.25 | $4.50 |
| 16 | Comb CC&G TB6.12 (60603800) | LF | 873 | $40.00 | $46.50 | $45.00 | $44.00 | $48.00 | $65.00 |
| 17 | Mobilization (67100100) | LS | 1 | $12,000 | $5,000.00 | $17,000 | $5,000.00 | $17,000 | $30,000 |
| 18 | Paint PVT MK line 6 (78001130) | LF | 313 | $35.00 | $5.50 | $11.00 | $10.00 | $35.00 | $9.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of August 1, 2025. Compiled by Mirage Metrics.