Advanced Asphalt Company: IDOT bid record

Advanced Asphalt Company submitted 137 bids on Illinois DOT contracts in the data, from 15 JAN 2021 to 31 JUL 2026, and was the low bidder on 106 of them (77%). When it was not low, its total sat a median +10% above the low bid.

Owner
Illinois DOT
Low bid volume
$413,497,955
Latest bid
31 JUL 2026
Data through
18 SEP 2026
137Bids
106Low bids
77Win rate, percent
+10%Median gap to the low bid when not low, 31 bids

By year

YearBidsLow bidsWin rate
2021211886%
2022181689%
202311982%
2024281968%
2025332370%
2026262181%
Advanced Asphalt Company, IDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 03856475%
District 04312477%
District 02211886%
Advanced Asphalt Company, IDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
SHRT TRM pavt MK rem70300150SF3633 (92%)$1.62$1.20
Incidental HMA surf40800050TON5432 (59%)$158.00$250.00
Temporary ramp40600990SY3930 (77%)$15.00$19.46
Raised ref PVT MK rem78300200EACH3328 (85%)$12.00$15.00
Agg wedge SHLD type B48102100TON3825 (66%)$31.62$50.00
Detectable warnings42400800SF2925 (86%)$25.00$37.00
Engr field office A67000400CAL MO3324 (73%)$2,200.00$2,550.00
Trainees TPGZ0076604HR2424 (100%)$15.00$15.00
GRV RCSD PVT MRKG 2578011125LF2523 (92%)$5.00$6.00
TraineesZ0076600HR2323 (100%)$0.80$0.80
Changeable message SN70107025CAL DAY2922 (76%)$100.00$55.00
Short term pavt mking70300100LF4121 (51%)$1.00$1.01
Advanced Asphalt Company, IDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Advanced Asphalt Company, IDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
31 JUL 202666T13District 03Section (50-8,1 of 1$729,412Low
31 JUL 202668K27District 04Section 32RS-6;29RS-5;28RS-31 of 2$1,822,642Low, 32% under the second
31 JUL 202668L02District 04Section 131PP1 of 2$253,825Low, 47% under the second
12 JUN 202664L94District 02Section 104R3 of 4$16,898,481+19%
12 JUN 202666A91District 03Section (50-2)RS-6(50-3)RS-71 of 1$19,753,741Low
12 JUN 202668C93District 04Section 72[6RS;(6-1)RS-1]1 of 2$10,996,119Low, 1.0% under the second
12 JUN 202668J70District 04Section (5,11)RS-4;114RS-6;(4-BR)BRR1 of 2$8,498,702Low, 7.0% under the second
12 JUN 202668J72District 04Section 124RS-6;123RS-51 of 1$5,423,600Low
12 JUN 202668K98District 04Section (106,105)PP1 of 1$376,414Low
24 APR 202666P86District 03Section (11Y)RS-21 of 1$4,400,787Low
24 APR 202668J88District 04Section Z[1V-RS-5;D-15D-RS-8;15D-RS-6]1 of 2$1,996,962Low, 28% under the second
24 APR 202668J89District 04Section Z[(E,2)15D]RS-5;Z-1V-RS-61 of 2$4,472,093Low, 33% under the second
24 APR 202668J95District 04Section (2,3)RS-51 of 1$9,352,996Low
24 APR 202668K20District 04Section 123RS-7;(123RA)RS1 of 1$2,839,793Low
27 FEB 202666P67District 03Section (19,20)RS-51 of 2$3,606,240Low, 2.0% under the second
27 FEB 202668J57District 04Section (8,103)RS-5;[(103B)I]BRR1 of 2$5,129,210Low, 6.0% under the second
27 FEB 202668J68District 04Section 133RS-5;134RS-3;135RS-92 of 2$8,217,452+10%
27 FEB 202668J96District 04Section 3RS-6;4RS-21 of 1$7,833,037Low
27 FEB 202668K15District 04Section 130RS-7;131RS-62 of 2$3,631,9040.0%
27 FEB 202668K16District 04Section 130RS-82 of 2$3,364,295+1.0%
27 FEB 202687886District 03Ladd, section 22-00022-00-PP2 of 3$164,616+20%
27 FEB 202687910District 03Project Number: Px2V-154 / /, section 25-00412-00-WR1 of 2$1,225,765Low, 4.0% under the second
16 JAN 202664U16District 02Section ((3,101 of 3$6,016,335Low, 9.0% under the second
16 JAN 202664U18District 02Section (115,115EXT,128,135EXT)CIR&RS1 of 2$5,878,533Low, 9.0% under the second
16 JAN 202666N78District 03Section (J-1,D-1,24,22)RS-21 of 1$4,503,804Low
Advanced Asphalt Company: latest IDOT bids in the data

How this record was read

IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

  • Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way