IDOT contract 68J68 bid tabulation
Section 133RS-5;134RS-3;135RS-9. Let by Illinois DOT on February 27, 2026, Fulton, District 04. 2 bids received; low bid $7,447,606 by R. A. Cullinan and Son, a div of UCM, Inc..
- Owner
- Illinois DOT
- Letting
- 27 FEB 2026
- Pay items
- 61
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | R. A. Cullinan and Son, a div of UCM, Inc. | $7,447,606 | Low |
| 2 | Advanced Asphalt Company | $8,217,452 | +10% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. R. A. Cullinan and Son, a div of UCM, Inc. | 2. Advanced Asphalt Company |
|---|---|---|---|---|---|
| 1 | Constr sta layout (XZ013798) | LS | 1 | $4,625.26 | $7,500.00 |
| 2 | Exc & GR EX SHLD SPL (X2020060) | UNIT | 687 | $578.44 | $420.00 |
| 3 | Cir-FDR emuls asphalt (X4005500) | TON | 582 | $153.75 | $587.00 |
| 4 | Cip recycling 4.0 (X4060221) | SY | 86,662 | $5.45 | $4.20 |
| 5 | HMA surf rem SPL (X4400196) | SY | 2,227 | $21.00 | $29.00 |
| 6 | HMA surf rem var DP (X4401198) | SY | 89,668 | $1.14 | $1.38 |
| 7 | SPBGR (short radius) (X6330725) | LF | 100 | $43.56 | $42.50 |
| 8 | Linear delin panels 4 (X6350204) | EACH | 96 | $76.88 | $75.00 |
| 9 | GDRL agg eros cont (Z0001002) | TON | 1,632 | $87.13 | $82.00 |
| 10 | Construction layout (Z0013798) | LS | 1 | $4,625.26 | $9,800.00 |
| 11 | Trainees (Z0076600) | HR | 5,000 | $0.80 | $0.80 |
| 12 | Trainees TPG (Z0076604) | HR | 5,000 | $15.00 | $15.00 |
| 13 | Earth excavation (20200100) | CY | 131 | $177.96 | $130.00 |
| 14 | Mowing (25000750) | ACRE | 21 | $123.00 | $120.00 |
| 15 | Agg surf cse A (40200100) | TON | 199 | $92.25 | $90.00 |
| 16 | P bit matls tack CT (40600295) | LB | 187,078 | $1.12 | $0.95 |
| 17 | Matl transfer device (40600405) | TON | 20,711 | $1.99 | $3.90 |
| 18 | HMA surf rem butt JT (40600982) | SY | 3,422 | $22.07 | $16.25 |
| 19 | Temporary ramp (40600990) | SY | 1,865 | $30.97 | $16.00 |
| 20 | HMA BC IL-9.5 N50 (40602978) | TON | 7,545 | $105.46 | $119.00 |
| 21 | P HMA BC IL-4.75 N50 (40603200) | TON | 637 | $147.62 | $151.00 |
| 22 | P HMA BC IL-9.5 N50 (40603205) | TON | 430 | $149.69 | $150.00 |
| 23 | P HMA SC IL-9.5 D N50 (40604160) | TON | 12,077 | $115.75 | $126.00 |
| 24 | Incidental HMA surf (40800050) | TON | 565 | $318.23 | $205.00 |
| 25 | PCC driveway pavt 8 (42300400) | SY | 64 | $177.33 | $184.00 |
| 26 | Pavement rem (44000100) | SY | 8,060 | $10.89 | $11.50 |
| 27 | HMA surf rem 2 3/4 (44000160) | SY | 11,293 | $3.21 | $4.11 |
| 28 | HMA surf rem 3 (44000161) | SY | 4,387 | $5.38 | $4.58 |
| 29 | Drive pavement rem (44000200) | SY | 64 | $45.10 | $44.00 |
| 30 | Gutter rem (44000400) | LF | 1,245 | $15.38 | $15.00 |
| 31 | Comb curb gutter rem (44000500) | LF | 20 | $67.65 | $66.00 |
| 32 | Aggregate SHLDS B (48101200) | TON | 10,312 | $46.02 | $52.00 |
| 33 | Agg wedge SHLD type B (48102100) | TON | 1,022 | $47.15 | $54.00 |
| 34 | HMA shoulders (48203100) | TON | 14,366 | $110.76 | $114.25 |
| 35 | Man adjust (60255500) | EACH | 8 | $1,132.63 | $2,825.00 |
| 36 | Inlets adj new T3F&G (60260500) | EACH | 1 | $1,545.70 | $1,508.00 |
| 37 | Concrete gutter TY B (60602800) | LF | 1,430 | $61.50 | $60.00 |
| 38 | Comb CC&G TB6.18 (60604400) | LF | 20 | $172.20 | $168.00 |
| 39 | SPBGR TY A 6FT posts (63000001) | LF | 5,738 | $32.54 | $31.75 |
| 40 | Traf bar term T2 (63100045) | EACH | 2 | $2,793.13 | $2,725.00 |
| 41 | TR bar TRM T1 SPL tan (63100167) | EACH | 25 | $3,331.25 | $3,250.00 |
| 42 | TR bar TRM T1 SPL FLR (63100169) | EACH | 9 | $2,895.63 | $2,825.00 |
| 43 | Guardrail remov (63200310) | LF | 7,360 | $3.59 | $3.50 |
| 44 | Shoulder rum strip 8 (64200108) | LF | 67,235 | $0.38 | $0.37 |
| 45 | Sinusoidal rum STP 14 (64200214) | LF | 34,344 | $0.29 | $0.38 |
| 46 | Engr field office A (67000400) | CAL MO | 6 | $3,776.57 | $2,917.58 |
| 47 | Mobilization (67100100) | LS | 1 | $55,529 | $468,000 |
| 48 | Traf cont-prot 701201 (70100450) | LS | 1 | $0.01 | $1,000.00 |
| 49 | Traf cont-prot 701306 (70100460) | LS | 1 | $41,104 | $61,550 |
| 50 | Changeable message SN (70107025) | CAL DAY | 14 | $330.00 | $100.00 |
| 51 | Short term pavt mking (70300100) | LF | 12,036 | $2.03 | $2.52 |
| 52 | SHRT TRM pavt MK rem (70300150) | SF | 1,338 | $7.86 | $4.48 |
| 53 | Temp PVT MK line 4 - paint (70300221) | LF | 42,106 | $0.01 | $0.01 |
| 54 | Temp PVT MK line 6 - paint (70300241) | LF | 78,390 | $0.01 | $0.01 |
| 55 | Terminal marker - DA (72501000) | EACH | 36 | $51.25 | $50.00 |
| 56 | Mod ureth PM line 4 (78009004) | LF | 42,106 | $0.87 | $1.00 |
| 57 | Mod ureth PM line 6 (78009006) | LF | 78,390 | $0.92 | $1.15 |
| 58 | GRV RCSD PVT MRKG 5 (78011025) | LF | 42,106 | $0.51 | $0.40 |
| 59 | GRV RCSD PVT MRKG 7 (78011035) | LF | 78,390 | $0.62 | $0.50 |
| 60 | Raised refl pavt MKR (78100100) | EACH | 477 | $44.59 | $60.00 |
| 61 | Raised ref PVT MK rem (78300200) | EACH | 477 | $27.89 | $26.11 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of February 27, 2026. Compiled by Mirage Metrics.